BLD18-00374
| BLD-Energy code compliance | 5/22/2018 | 5/22/2018 | 5/22/2018 3:43:02 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD18-00374
| BLD-Framing/Rough-in | 5/22/2018 | 5/22/2018 | 5/22/2018 3:42:50 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD17-00746
| BLD - Request for Extension | 5/21/2018 | 5/22/2018 | 5/22/2018 3:17:02 PM | P | PASS |
|
|
Chris Phone #: ###-####
|
BLD17-00270
| BLD-Footing | 5/22/2018 | 5/22/2018 | 5/22/2018 2:49:08 PM | P | PART |
|
|
Cory-please call for access code Phone #: ###-####. Work in progress. Will have special inspection.
|
BLD18-01186
| BLD-Energy code compliance | 5/22/2018 | 5/22/2018 | 5/22/2018 2:33:34 PM | P | CANC |
|
|
Inspection requested via web by Erica Duran
|
BLD18-01186
| BLD-Framing/Rough-in | 5/22/2018 | 5/22/2018 | 5/22/2018 2:33:27 PM | P | PASS |
|
|
Inspection requested via web by Erica Duran
|
BLD18-00724
| BLD-Final | 5/18/2018 | 5/22/2018 | 5/22/2018 2:13:04 PM | P | DONE |
|
|
please call matt oranday to meet @ site for final Phone #: ###-#### Inspection requested via web by Matt Oranday
|
BLD18-00724
| DOC - Permit Finaled | 5/22/2018 | 5/22/2018 | 5/22/2018 2:12:55 PM | P | PASS |
|
|
Noted no footing inspection was conducted. Contractor provided receipts for concrete and pictures of footings. It appears that footings were installed per the city approved plans and engineering.
|
BLD18-01586
| BLD-Conference | 5/22/2018 | 5/22/2018 | 5/22/2018 1:50:30 PM | P | DONE |
|
|
Please call Sid ###-####. Phone #: ###-#### Inspection requested via web by Carissa Primmer. Contractor to remove all shet rock behind old break room counter and sink to inspect framing, electrical and plumbing that has been installed with no permits.
|
BLD18-01672
| BLD-Final | 5/21/2018 | 5/22/2018 | 5/22/2018 1:22:19 PM | P | NR |
|
|
Sean Swanson (alt. contact is Jason Song ###-####) Phone #: ###-####. Fire/life/safety final failed.
|
BLD16-04456
| BLD-Energy code compliance | 5/22/2018 | 5/22/2018 | 5/22/2018 1:20:55 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown. All issues resolved.
|
BLD18-01000
| BLD-Energy code compliance | 5/21/2018 | 5/22/2018 | 5/22/2018 1:15:46 PM | P | NR |
|
|
engineered truss repair docs will be on bar top. Phone #: ###-#### Inspection requested via web by daniel solsman. Truss repair in garage not per the enginering.
|
BLD18-01678
| BLD-Footing | 5/21/2018 | 5/22/2018 | 5/22/2018 11:28:35 AM | A | PASS |
|
|
Please call ahead for access - Zach Phone #: ###-####
|
BLD17-01294
| BLD-Ceiling Grid Inspection | 5/21/2018 | 5/22/2018 | 5/22/2018 11:09:38 AM | A | PASS |
|
|
Mark Phone #: ###-####
|
BLD18-00074
| BLD-Framing/Rough-in | 5/21/2018 | 5/22/2018 | 5/22/2018 10:53:47 AM | A | PART |
|
|
George Dean will be the contact Phone #: ###-#### Inspection requested via web by Anne Motschull. Interior steel stud framed wall for new storage room. needs to add bracing from top of wall to structure. Will verify on final. Also needs to provide city set of approved plans.
|
MIS18-00170
| BLD-Conference | 5/8/2018 | 5/22/2018 | 5/22/2018 10:33:56 AM | A | DONE |
|
|
Check on status. Issue 5 day notice . 5 day notice issued. Spoke with representative with Enviro tech. He noted that they have been in to speak with Julie Romig and are in the process of hiring an engineer.
|
BLD17-02427
| BLD-Final | 5/21/2018 | 5/22/2018 | 5/22/2018 10:04:48 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by David Scaggs. Ok for perm occ. No card to sign.
|
BLD17-02549
| BLD-Framing/Rough-in | 5/21/2018 | 5/22/2018 | 5/22/2018 9:37:30 AM | A | PART |
|
|
Joe call ahead 30 mins Phone #: ###-####. Complete lateral bracing and airseal pack after electrical rough in inspection.
|
BLD17-03128
| BLD-Framing/Rough-in | 5/21/2018 | 5/22/2018 | 5/22/2018 9:01:13 AM | A | PART |
|
|
interior framing before insulation Phone #: ###-#### Inspection requested via web by Darrell Gogert. Upper framing only ok for insulation.
|