BLD19-00509
| BLD-Framing/Rough-in | 5/21/2019 | 5/22/2019 | 5/22/2019 3:53:00 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD17-02871
| BLD-Ceiling Grid Inspection | 5/22/2019 | 5/22/2019 | 5/22/2019 2:42:48 PM | P | PASS |
|
|
John Phone #: ###-####. 2nd floor and remainder of 1st. floor ok.
|
BLD19-00833
| BLD-Wall Bracing | 5/22/2019 | 5/22/2019 | 5/22/2019 2:08:34 PM | P | FAIL |
|
|
Kai Phone #: ###-####
|
BLD19-00095
| BLD-Final | 5/22/2019 | 5/22/2019 | 5/22/2019 1:43:43 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Adam Joslin. Install remainder of carper and transitions. install base in restrooms. Mirror and sink mounted to high for ADA. remove exit sign in hall way.
|
BLD19-00507
| BLD-Framing/Rough-in | 5/21/2019 | 5/22/2019 | 5/22/2019 11:57:02 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD19-01554
| BLD-Framing/Rough-in | 5/21/2019 | 5/22/2019 | 5/22/2019 11:30:45 AM | A | DONE |
|
|
Call foreman, Brad Hallman, one hour prior to arrival to coordinate access. Phone #: ###-#### Inspection requested via web by Rob Maes. It appears the 2x6 lumber was sistered to 2x8 existing top chords. per the structural engineers leter. No additional work was required to upgrade the roof.
|
BLD16-03449
| BLD-Final | 5/21/2019 | 5/22/2019 | 5/22/2019 11:06:02 AM | A | PASS |
|
|
Brandi Phone #: ###-####
|
BLD16-03449
| DOC - Permit Finaled | 5/22/2019 | 5/22/2019 | 5/22/2019 11:05:55 AM | P | PASS |
|
|
|
BLD19-00872
| BLD-Framing/Rough-in | 5/21/2019 | 5/22/2019 | 5/22/2019 9:37:46 AM | A | PASS |
|
|
Call when on the way // Joe Phone #: ###-####. Interior steel stud framed walls ok.
|
BLD17-00320
| BLD-Framing/Rough-in | 5/21/2019 | 5/22/2019 | 5/22/2019 9:21:11 AM | A | PASS |
|
|
Stephen Phone #: ###-####
|
BLD19-01281
| BLD-Final | 5/21/2019 | 5/22/2019 | 5/22/2019 9:10:24 AM | A | DONE |
|
|
Phone #: ###-#### Inspection requested via web by Michael La Pointe
|
BLD19-01281
| DOC - Permit Finaled | 5/22/2019 | 5/22/2019 | 5/22/2019 9:10:15 AM | P | PASS |
|
|
All work appeared to be done in accordance with local codes and ordinances.
|
BLD19-00389
| BLD-Final | 5/21/2019 | 5/22/2019 | 5/22/2019 9:07:00 AM | A | NR |
|
|
Curtis Phone #: ###-####. Needs electrical final.
|
BLD18-03240
| BLD-Framing/Rough-in | 5/21/2019 | 5/22/2019 | 5/22/2019 9:03:51 AM | A | FAIL |
|
|
Cody Phone #: ###-####. Nail off all multiply trusses per the engineering, B2 E2 and A20. Roll block C2 and C3 trusses. Install hangar on A01 truss for bearing. Install all blocking for Gyp board shear walls.
|