Inspections for the day of: Wednesday, May 9, 2018.
Number of inspections: 22
Percentage of inspections complete: 95 %
Percentage of inspections not complete: 5 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-00834 BLD-Conference5/2/20185/3/2018 P 
call adam before going out would like to meet you on siteAs late as possible Phone #: 2089820822 >> Inspection requested via mobile web by Adam Junior
BLD17-01088 BLD-Framing/Rough-in5/9/20185/9/20185/10/2018 10:49:53 AMPCANC
Barry Phone #: ###-####
BLD18-01141 BLD-Final5/9/20185/9/20185/9/2018 3:37:26 PMPDONE
Customer is hard of hearing and did not hear the doorbell yesterday. Please call ###-#### if nobody answers. Customer is picking kids up from school from 2:50-3:15 but will be home the rest of the day. Their side gate is unlocked and will leave a permission to be on property if you show up when she is picking up the kids. Electrical inspection already passed. Thank you! Phone #: ###-#### Inspection requested via web by BRS Permitting
BLD18-01141 DOC - Permit Finaled5/9/20185/9/20185/9/2018 3:37:17 PMPPASS
BLD17-04278 BLD-Other5/9/20185/9/20185/9/2018 2:41:42 PMPPASS
fire caulking- Jeff Phone #: ###-####. South of stairway ok. Ok to cover.
BLD17-04278 BLD-Framing/Rough-in5/9/20185/9/20185/9/2018 2:41:14 PMPPASS
Jeff Phone #: ###-####. South of stairwell ok to cover all sides.
BLD18-00079 BLD-Final5/8/20185/9/20185/9/2018 2:28:39 PMPPASS
or Dennis ###-#### or Kurt Phone #: ###-####
BLD18-00079 DOC - Permit Finaled5/9/20185/9/20185/9/2018 2:28:21 PMPPASS
BLD17-02412 BLD-Final5/9/20185/9/20185/9/2018 2:28:07 PMPPASS
Phone #: ###-#### Inspection requested via web by David Scaggs. Ok for temp occ. Will be ok for perm occ once zoning signs perm.
BLD17-04305 BLD-Wall Bracing5/9/20185/9/20185/9/2018 1:53:26 PMPPASS
Shear // Berry Phone #: ###-####
BLD17-02960 BLD-Final5/9/20185/9/20185/9/2018 1:28:30 PMPPASS
Cody Phone #: ###-####
BLD17-02960 DOC - Permit Finaled5/9/20185/9/20185/9/2018 1:28:23 PMPPASS
BLD17-01305 BLD-Final5/9/20185/9/20185/9/2018 1:28:15 PMPPASS
Cody Phone #: ###-####
BLD17-01305 DOC - Permit Finaled5/9/20185/9/20185/9/2018 1:28:07 PMPPASS
BLD18-00904 BLD-Final5/8/20185/9/20185/9/2018 1:27:54 PMPDONE
Here is the install crew lead''s number, as requested. His name is Brian Prussia.

Nobody will be present for this inspection.
Phone #: ###-#### Inspection requested via web by BRS Permitting
BLD18-00904 DOC - Permit Finaled5/9/20185/9/20185/9/2018 1:27:46 PMPPASS
BLD16-04223 BLD-Final5/6/20185/9/20185/9/2018 12:03:49 PMAFAIL
Please contact Stephen Lee when on your way, I will meet you there. Phone #: ###-#### Inspection requested via web by Stephen Lee. Provide the UL for the double wall grease duct from captive air showing 1hr. assembly and fireblock detail at penetrations. Make up air duct needs to be wrapped or in 1hr shaft for entire length. Provide UL and method for wrapping make up air duct and firestop details at penetrationns. Install all structural components as shown on Sheet A1-1.. Provide special inspection for epoxt bolting. correction notice issued.
BLD18-00411 BLD-Framing/Rough-in5/9/20185/9/20185/9/2018 9:48:04 AMANR
Phone #: ###-#### Inspection requested via web by Kelly Stover. All issues resolved except for A03 truss bearing.
BLD18-00411 BLD-Energy code compliance5/9/20185/9/20185/9/2018 9:47:38 AMAPEND
Phone #: ###-#### Inspection requested via web by Kelly Stover
BLD17-01449 BLD-Final5/8/20185/9/20185/9/2018 9:20:24 AMAPASS
BLD17-01449 DOC - Permit Finaled5/9/20185/9/20185/9/2018 9:20:17 AMPPASS
BLD17-03128 BLD-Framing/Rough-in5/9/20185/9/20185/9/2018 9:04:03 AMAPASS
Inspection needed on shear wall rough framing at drive through. Phone #: ###-#### Inspection requested via web by Darrell Gogert