MIS18-00035
| MIS-Aging Inspection | 6/14/2018 | 6/14/2018 | 6/15/2018 4:36:20 PM | | PEND |
|
|
This is pending per Bob Archibald.
|
BLD17-03402
| BLD-Final | 6/14/2018 | 6/14/2018 | 6/14/2018 4:01:27 PM | P | FAIL |
|
|
Brandon Phone #: ###-####. . Needs blower door test result and post. evrything else ok.
|
BLD17-03405
| BLD-Final | 6/14/2018 | 6/14/2018 | 6/14/2018 4:00:37 PM | P | FAIL |
|
|
Brandon Phone #: ###-####. Needs blower door test result and post. evrything else ok.
|
BLD18-00221
| BLD-Final | 6/13/2018 | 6/14/2018 | 6/14/2018 3:11:24 PM | P | PASS |
|
|
ceil Phone #: ###-####. Ok for perm occ. MAjority of scope of work for this project was deleted. Doors and concrete remained, no demo on walls for new lead. Pit was filled in and new equipment.
|
BLD17-02871
| BLD-Framing/Rough-in | 6/14/2018 | 6/14/2018 | 6/14/2018 2:30:28 PM | P | PASS |
|
|
John Phone #: ###-####. Roof over animal shelter only ok to cover.
|
BLD18-01841
| BLD-Framing/Rough-in | 6/13/2018 | 6/14/2018 | 6/14/2018 1:39:32 PM | P | PART |
|
|
Brian Phone #: ###-####. PEnding plumbing rough in inspection.
|
BLD17-04274
| BLD-Final | 6/13/2018 | 6/14/2018 | 6/14/2018 10:54:40 AM | A | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Don Walker
|
BLD17-04274
| BLD-Conference | 6/14/2018 | 6/14/2018 | 6/14/2018 10:54:32 AM | A | DONE |
|
|
Phone #: ###-#### Inspection requested via web by Don Walker. Walk through prior to final. Needs to provide ADA portion of counter top at wine bar. Provide ADA bathroom signs.
|
BLD16-04497
| BLD-Energy code compliance | 6/14/2018 | 6/14/2018 | 6/14/2018 10:19:12 AM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown
|
BLD16-04497
| BLD-Framing/Rough-in | 6/14/2018 | 6/14/2018 | 6/14/2018 10:19:01 AM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown
|
BLD17-01088
| BLD-Framing/Rough-in | 6/13/2018 | 6/14/2018 | 6/14/2018 9:18:33 AM | A | PART |
|
|
Berry Phone #: ###-####. Interior steel stud framed walls for new pre op bed aditions. Needs to hand patch fire proofing back on tube stell columns and complete 1hr. fire wall envelope aboce grid.
|
ESC16-01037
| Site Final | 6/14/2018 | 6/14/2018 | 6/14/2018 8:46:30 AM | A | DONE |
|
|
|
ESC16-01037
| DOC - Permit Finaled | 6/14/2018 | 6/14/2018 | 6/14/2018 8:46:22 AM | P | PASS |
|
|
|
BLD16-02753
| BLD-Final | 6/14/2018 | 6/14/2018 | 6/14/2018 8:45:49 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown
|
BLD16-02753
| DOC - Permit Finaled | 6/14/2018 | 6/14/2018 | 6/14/2018 8:45:40 AM | P | PASS |
|
|
|
BLD16-02753
| BLD-Blower Door Test Results | 6/14/2018 | 6/14/2018 | 6/14/2018 8:43:07 AM | A | DONE |
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown.
6.8ACH @50pa
|