Inspections for the day of: Thursday, June 14, 2018.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS18-00035 MIS-Aging Inspection6/14/20186/14/20186/15/2018 4:36:20 PM PEND
This is pending per Bob Archibald.
BLD17-03402 BLD-Final6/14/20186/14/20186/14/2018 4:01:27 PMPFAIL
Brandon Phone #: ###-####. . Needs blower door test result and post. evrything else ok.
BLD17-03405 BLD-Final6/14/20186/14/20186/14/2018 4:00:37 PMPFAIL
Brandon Phone #: ###-####. Needs blower door test result and post. evrything else ok.
BLD18-00221 BLD-Final6/13/20186/14/20186/14/2018 3:11:24 PMPPASS
ceil Phone #: ###-####. Ok for perm occ. MAjority of scope of work for this project was deleted. Doors and concrete remained, no demo on walls for new lead. Pit was filled in and new equipment.
BLD17-02871 BLD-Framing/Rough-in6/14/20186/14/20186/14/2018 2:30:28 PMPPASS
John Phone #: ###-####. Roof over animal shelter only ok to cover.
BLD18-01841 BLD-Framing/Rough-in6/13/20186/14/20186/14/2018 1:39:32 PMPPART
Brian Phone #: ###-####. PEnding plumbing rough in inspection.
BLD17-04274 BLD-Final6/13/20186/14/20186/14/2018 10:54:40 AMACANC
Phone #: ###-#### Inspection requested via web by Don Walker
BLD17-04274 BLD-Conference6/14/20186/14/20186/14/2018 10:54:32 AMADONE
Phone #: ###-#### Inspection requested via web by Don Walker. Walk through prior to final. Needs to provide ADA portion of counter top at wine bar. Provide ADA bathroom signs.
BLD16-04497 BLD-Energy code compliance6/14/20186/14/20186/14/2018 10:19:12 AMANR
Phone #: ###-#### Inspection requested via web by Sam Brown
BLD16-04497 BLD-Framing/Rough-in6/14/20186/14/20186/14/2018 10:19:01 AMANR
Phone #: ###-#### Inspection requested via web by Sam Brown
BLD17-01088 BLD-Framing/Rough-in6/13/20186/14/20186/14/2018 9:18:33 AMAPART
Berry Phone #: ###-####. Interior steel stud framed walls for new pre op bed aditions. Needs to hand patch fire proofing back on tube stell columns and complete 1hr. fire wall envelope aboce grid.
ESC16-01037 Site Final6/14/20186/14/20186/14/2018 8:46:30 AMADONE
ESC16-01037 DOC - Permit Finaled6/14/20186/14/20186/14/2018 8:46:22 AMPPASS
BLD16-02753 BLD-Final6/14/20186/14/20186/14/2018 8:45:49 AMAPASS
Phone #: ###-#### Inspection requested via web by Sam Brown
BLD16-02753 DOC - Permit Finaled6/14/20186/14/20186/14/2018 8:45:40 AMPPASS
BLD16-02753 BLD-Blower Door Test Results6/14/20186/14/20186/14/2018 8:43:07 AMADONE
Phone #: ###-#### Inspection requested via web by Sam Brown.

6.8ACH @50pa