Inspections for the day of: Monday, June 17, 2019.
Number of inspections: 27
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-02622 BLD-Aging Inspection6/17/20196/17/20196/18/2019 10:51:18 AM PASS
BLD19-00397 BLD-Final6/14/20196/17/20196/18/2019 10:23:02 AMANR
Victor Phone #: ###-####. Drivewahy not completed.
BLD18-04307 BLD-Final6/14/20196/17/20196/17/2019 4:03:05 PMANR
Kenny Phone #: ###-####. Still needs zoning.
BLD19-01353 BLD-Foundation6/14/20196/17/20196/17/2019 4:02:34 PMPPASS
Dane- please call Phone #: ###-####
BLD19-01352 BLD-Foundation6/17/20196/17/20196/17/2019 4:02:20 PMPPASS
BLD19-01351 BLD-Foundation6/17/20196/17/20196/17/2019 4:02:07 PMPPASS
BLD19-01349 BLD-Foundation6/17/20196/17/20196/17/2019 4:01:54 PMPPASS
BLD19-01350 BLD-Foundation6/17/20196/17/20196/17/2019 4:01:36 PMPPASS
BLD19-01348 BLD-Foundation6/17/20196/17/20196/17/2019 4:01:23 PMPPASS
BLD19-01347 BLD-Foundation6/17/20196/17/20196/17/2019 3:55:44 PMPPASS
BLD19-01483 BLD-Framing/Rough-in6/17/20196/17/20196/17/2019 3:44:09 PMPPASS
SHAWN Phone #: ###-####
BLD19-01482 BLD-Framing/Rough-in6/17/20196/17/20196/17/2019 3:43:56 PMPPASS
SHAWN Phone #: ###-####- please call 30 mins before arriving, thank you
BLD18-01425 BLD-Ceiling Grid Inspection6/14/20196/17/20196/17/2019 2:33:41 PMPPASS
james Phone #: ###-####. Kitchen and freezer room only ok to install tile.
BLD18-04515 BLD-Final6/14/20196/17/20196/17/2019 1:57:58 PMPDONE
Phone #: ###-#### Inspection requested via web by Laurie Hoelscher
BLD18-04515 DOC - Permit Finaled6/17/20196/17/20196/17/2019 1:57:50 PMPPASS
BLD18-02160 BLD-Final6/17/20196/17/20196/17/2019 1:57:31 PMPFAIL
Call for garage code- Wilson Phone #: ###-####. Provide egress ladders in window wells that exceed the 44 inch max depth. (total of 3)
BLD17-02922 BLD-Conference6/14/20196/17/20196/17/2019 1:13:45 PMPPASS
John Phone #: ###-####. WIP.
BLD17-04447 BLD-Ceiling Grid Inspection6/17/20196/17/20196/17/2019 11:25:40 AMAPASS
Hello Michael
ceiling grid inspection 1st floor, north and south sides Phone #: ###-#### Inspection requested via web by Jim Carriveau
BLD19-00831 BLD-Final6/14/20196/17/20196/17/2019 10:34:12 AMAPASS
Please call half hour before to meet // Ed Phone #: ###-####
BLD19-00831 DOC - Permit Finaled6/17/20196/17/20196/17/2019 10:34:05 AMPPASS
BLD19-01811 BLD-Final6/14/20196/17/20196/17/2019 10:12:33 AMAPASS
Janice- office opens after 9am Phone #: ###-####. OK for perm occ.
BLD19-00729 BLD-Conference6/17/20196/17/20196/17/2019 9:58:08 AMAPASS
Inspect Garage Portal Frame Walls for Framing and Nailing Schedule. Need inspection approval as the Mason''s are wanting to finish exterior work and would like to cover the front walls. Also have the ESR report for the RTECH foam board used in the roofing. Please call Mark Stevens 30mins prior to arriving at ###-####. Inspection requested via web by Mark Fischer. The R tech foam insulation is ok as installed.
BLD19-00729 BLD-Wall Bracing6/17/20196/17/20196/17/2019 9:57:32 AMAPASS
Inspect Garage Portal Frame Walls for Framing and Nailing Schedule. Need inspection approval as the Mason''s are wanting to finish exterior work and would like to cover the front walls. Also have the ESR report for the RTECH foam board used in the roofing. Please call Mark Stevens 30mins prior to arriving at ###-####. Inspection requested via web by Mark Fischer
BLD19-01134 BLD-Energy code compliance6/14/20196/17/20196/17/2019 9:39:04 AMAPASS
Phone #: ###-####
BLD18-02522 BLD-Framing/Rough-in6/14/20196/17/20196/17/2019 9:39:04 AMAPASS
Emery Phone #: ###-####
BLD18-02522 BLD-Energy code compliance6/17/20196/17/20196/17/2019 9:39:03 AMAPASS
Emery Phone #: ###-####
BLD18-04557 BLD-Final6/14/20196/17/20196/17/2019 8:40:58 AMAFAIL
Shawn Phone #: ###-####. Provide R30 insulation in crawl space under floor. Provide the home envelope test results and post. (Blowerdoor). Correction notice posted.