BLD19-01483
| BLD-Final | 6/27/2019 | 6/28/2019 | 6/28/2019 5:07:14 PM | P | PASS |
|
|
Shawn Phone #: ###-#### please call 30 min prior for access
|
BLD19-01483
| DOC - Permit Finaled | 6/28/2019 | 6/28/2019 | 6/28/2019 5:07:06 PM | P | PASS |
|
|
|
BLD19-01482
| BLD-Final | 6/27/2019 | 6/28/2019 | 6/28/2019 5:06:59 PM | P | PASS |
|
|
Shawn Phone #: ###-####- please call 30 min prior for access
|
BLD19-01552
| BLD-Final | 6/27/2019 | 6/28/2019 | 6/28/2019 3:39:10 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Laurie Hoelscher
|
BLD19-01552
| DOC - Permit Finaled | 6/28/2019 | 6/28/2019 | 6/28/2019 3:39:02 PM | P | PASS |
|
|
|
BLD19-01561
| BLD-Final | 6/27/2019 | 6/28/2019 | 6/28/2019 3:04:13 PM | P | DONE |
|
|
Phone #: ###-#### Inspection requested via web by Laurie Hoelscher
|
BLD19-01561
| DOC - Permit Finaled | 6/28/2019 | 6/28/2019 | 6/28/2019 3:04:05 PM | P | PASS |
|
|
|
BLD19-02268
| BLD-Other | 6/28/2019 | 6/28/2019 | 6/28/2019 2:16:37 PM | P | PASS |
|
|
Mfg home block ; tie inspection. Thank you!! Phone #: ###-#### Inspection requested via web by Ashleigh Meligan
|
BLD19-01506
| BLD-Other | 6/28/2019 | 6/28/2019 | 6/28/2019 1:43:27 PM | P | PASS |
|
|
block and tie // Linn Phone #: ###-####
|
BLD19-02056
| BLD-Final | 6/27/2019 | 6/28/2019 | 6/28/2019 1:43:03 PM | P | DONE |
|
|
Final Phone #: ###-#### Inspection requested via web by Joshua Adams
|
BLD19-02056
| DOC - Permit Finaled | 6/28/2019 | 6/28/2019 | 6/28/2019 1:42:46 PM | P | PASS |
|
|
All work appeared to be done in accordance with local codes and ordinances.
|
BLD19-01162
| BLD-Final | 6/27/2019 | 6/28/2019 | 6/28/2019 1:41:47 PM | P | PASS |
|
|
Tim Phone #: ###-####
|
BLD19-01162
| DOC - Permit Finaled | 6/28/2019 | 6/28/2019 | 6/28/2019 1:41:28 PM | P | PASS |
|
|
|
BLD19-01444
| BLD-Final | 6/28/2019 | 6/28/2019 | 6/28/2019 1:41:05 PM | P | FAIL |
|
|
Key to unit in lock box located in mailbox near door. Code is 2805 Phone #: ###-#### Inspection requested via web by Chad Aland. A mech. permit is required for the ventalation fan that has been installed. noted no framing inspection has been conducted on new framing for restroom. Miiror and grab bars mounted in correctly to walls. A correction notice has been issued.
|
BLD17-02261
| BLD-Wall cover | 6/27/2019 | 6/28/2019 | 6/28/2019 12:08:02 PM | A | PASS |
|
|
2nd and 3rd Floor Corridor ceiling inspections for cover. Sections A and D to end of corridors. Phone #: ###-#### Inspection requested via web by JT Turner. 2nd. and 3rd floor north and south corridor lids in Areas A and D ok for cover.
|
BLD18-03990
| BLD-Other | 6/27/2019 | 6/28/2019 | 6/28/2019 11:27:34 AM | A | DEFR |
|
|
Brian- inspection for inwall rebar PCLINE Phone #: ###-####. Pending special inspection.
|
BLD18-04470
| BLD-Wall cover | 6/28/2019 | 6/28/2019 | 6/28/2019 11:04:32 AM | A | CANC |
|
|
looking for insulation inspection - by offered listings, not sure if it''s this or "energy compliance" Thank you Phone #: ###-#### Inspection requested via web by Gary Band
|
BLD18-04470
| BLD-Energy code compliance | 6/28/2019 | 6/28/2019 | 6/28/2019 11:04:22 AM | A | PASS |
|
|
looking for insulation inspection - by offered listings, not sure if it''s this or "wall cover" Thank you Phone #: ###-#### Inspection requested via web by Gary Band
|
BLD06-02322
| BLD-Framing/Rough-in | 6/27/2019 | 6/28/2019 | 6/28/2019 10:48:18 AM | A | PASS |
|
|
second floor corridor, area B // Lee Phone #: ###-####. 2nd. floor corridors area B ok to rock lid.
|
BLD19-00250
| BLD-Wall cover | 6/27/2019 | 6/28/2019 | 6/28/2019 10:07:00 AM | A | PASS |
|
|
units 135 and 136, 233, 234, 235, 236 // Justin Phone #: ###-####
|
BLD19-00397
| BLD-Final | 6/26/2019 | 6/28/2019 | 6/28/2019 9:39:36 AM | A | PASS |
|
|
victor Phone #: ###-####
|
BLD19-00397
| DOC - Permit Finaled | 6/28/2019 | 6/28/2019 | 6/28/2019 9:39:27 AM | P | PASS |
|
|
|
BLD19-01926
| BLD-Foundation | 6/28/2019 | 6/28/2019 | 6/28/2019 9:27:08 AM | A | PART |
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD18-03240
| BLD-Energy code compliance | 6/27/2019 | 6/28/2019 | 6/28/2019 9:19:18 AM | A | PASS |
|
|
Coty Phone #: ###-####
|
BLD18-03240
| BLD-Framing/Rough-in | 6/27/2019 | 6/28/2019 | 6/28/2019 9:19:04 AM | A | PASS |
|
|
Coty Phone #: ###-####
|
BLD19-00803
| BLD-Framing/Rough-in | 6/27/2019 | 6/28/2019 | 6/28/2019 8:59:48 AM | A | FAIL |
|
|
Plans will be at the fireplace! Thanks Mike! Scott Phone #: ###-#### Inspection requested via web by Scott Zierler. Install straps for portal frames. Complete fire blockingat fir downs in main hallway by front door, both sides. Justify notched truss at bearing. (F3 truss). Roll block F1,F2,and F3 trusses, both sides. Nail C3 triple ply truss per the engineering and add stud under bearing. Complete lateral bracing on A4, A4A, A5, A6, A7 trusses. Correction notice posted. ok to insulate.
|
BLD19-00803
| BLD-Energy code compliance | 6/27/2019 | 6/28/2019 | 6/28/2019 8:56:45 AM | A | CANC |
|
|
Thank you! Phone #: ###-#### Inspection requested via web by Scott Zierler
|
BLD19-00630
| BLD-Final | 6/28/2019 | 6/28/2019 | 6/28/2019 12:00:00 AM | P | CANC |
|
|
Cecil Phone #: ###-####
|