Inspections for the day of: Friday, June 8, 2018.
Number of inspections: 22
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD17-03128 BLD-Framing/Rough-in6/8/20186/8/20186/8/2018 4:05:52 PMPPASS
Soffits Phone #: ###-#### Inspection requested via web by Darrell Gogert. Interior soffits ok.
BLD16-04477 BLD-Other6/8/20186/8/20186/8/2018 3:32:43 PMPPASS
Fire rated assembly at roof eave. Phone #: ###-#### Inspection requested via web by Sam Brown
BLD16-04478 BLD-Other6/8/20186/8/20186/8/2018 3:32:34 PMPPASS
Fire rated assembly at roof eave. Phone #: ###-#### Inspection requested via web by Sam Brown
BLD18-01586 BLD-Final6/8/20186/8/20186/8/2018 3:06:20 PMPPASS
Sid Phone #: ###-####. OK for perm occ.
BLD18-01372 BLD-Framing/Rough-in6/8/20186/8/20186/8/2018 2:58:43 PMPFAIL
Tom-pease call 30 mins prior Phone #: ###-####. Missing 4 anchor hold downs, 2 on each short side end. Provide support and marriage line at exetior of building as shown.
BLD17-02819 BLD-Final6/8/20186/8/20186/8/2018 2:30:31 PMPPASS
Larry Phone #: ###-####
BLD17-02819 DOC - Permit Finaled6/8/20186/8/20186/8/2018 2:30:24 PMPPASS
BLD17-02819 BLD-Blower Door Test Results6/8/20186/8/20186/8/2018 2:27:44 PMPDONE
Larry Phone #: ###-####.

3.2ACH @50pa
BLD17-02429 BLD-Final6/8/20186/8/20186/8/2018 2:00:11 PMPPASS
Phone #: ###-#### Inspection requested via web by David Scaggs. Ok for perm occ. No card on site to sign.
BLD16-04450 BLD-Conference6/8/20186/8/20186/8/2018 1:45:30 PMPCANC
Inspection requested via web by Asim Smajlovic
BLD17-00340 BLD-Conference6/8/20186/8/20186/8/2018 1:45:20 PMPCANC
Inspection requested via web by Asim Smajlovic
BLD17-01641 BLD-Framing/Rough-in6/7/20186/8/20186/8/2018 1:45:11 PMPPART
Requesting Mike Jordan. He has been onsite previously.
Double checked and nailed off sheeting. Installed blocking in corners. Installed purlins. Want gable bracing verified before nailing in. Phone #: ###-#### Inspection requested via web by Cameron Craven. All issues have been resolved. ok to cover after electrical rough in inspection.
BLD17-03282 BLD-Footing6/7/20186/8/20186/8/2018 1:28:49 PMPPASS
Dane Phone #: ###-####
MIS18-00212 BLD-Conference6/1/20186/8/20186/8/2018 10:47:35 AMADONE
check on status. Check on job, no further work has been conducted. Appears that no plans or application has been submitted as of this date. A reinspection has been schedule for June 22nd. Will check on status and issue 5 day notice if needed.
BLD18-01003 BLD-Energy code compliance6/8/20186/8/20186/8/2018 10:27:52 AMPPASS
Phone #: ###-#### Inspection requested via web by Evan Waters
BLD17-02819 BLD-Final6/7/20186/8/20186/8/2018 10:18:34 AMANH
Phone #: ###-#### Inspection requested via web by David Wipper. No access.
ESC17-01045 Site Final6/8/20186/8/20186/8/2018 9:32:24 AMADONE
ESC17-01045 DOC - Permit Finaled6/8/20186/8/20186/8/2018 9:32:15 AMPPASS
BLD18-00863 BLD-Energy code compliance6/5/20186/8/20186/8/2018 9:28:04 AMAPASS
Grant Phone #: ###-####
BLD18-00920 BLD-Footing6/7/20186/8/20186/8/2018 8:49:36 AMAPART
rebar- pour at 1pm- KJ Phone #: ###-####. Cleaning out bottom of footing. Rebar tied, needs to be placed in footing. Will have special inspection.
BLD17-00340 BLD-Final6/7/20186/8/20186/8/2018 8:22:10 AMANR
Asim Phone #: ###-####. Needs electrical and mech fianls first. Tried to call to notify, but appears there phone is not working?
BLD17-00253 BLD - Request for Extension6/7/20186/8/20186/8/2018 8:18:05 AMAPASS
Richard Phone #: ###-####-please call to meet