Inspections for the day of: Wednesday, July 1, 2020.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-03042 BLD-Footing6/30/20207/1/20207/1/2020 4:19:12 PMAPEND
bob Phone #: ###-####. Engineer to sign off on epoxy, no special inspection. Aslo need RFI for column pad footings and aditional letter from engineer waiving special inspection on concrete.
BLD20-01600 BLD-Final6/30/20207/1/20207/1/2020 3:48:57 PMPDONE
Onsite contact: Mierins ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting
BLD20-01600 DOC - Permit Finaled7/1/20207/1/20207/1/2020 3:48:42 PMPPASS
BLD20-00768 BLD-Energy code compliance7/1/20207/1/20207/1/2020 3:25:34 PMPPASS
Brian *screened* Phone #: ###-####
BLD20-00768 BLD-Framing/Rough-in7/1/20207/1/20207/1/2020 3:25:23 PMPCANC
Brian *screened* Phone #: ###-####
BLD20-01389 BLD-Final7/1/20207/1/20207/1/2020 3:10:55 PMPPASS
Screened // Mike Phone #: ###-####
BLD20-01389 DOC - Permit Finaled7/1/20207/1/20207/1/2020 3:10:43 PMPPASS
BLD20-00033 BLD-Framing/Rough-in7/1/20207/1/20207/1/2020 2:29:24 PMPPASS
Tim *screened* Phone #: ###-####. Interior steel stud framed walls.
BLD20-01588 BLD-Final6/30/20207/1/20207/1/2020 1:49:36 PMPPASS
Phone #: ###-#### Inspection requested via web by Tom Raistrick. ok for perm occ.
BLD18-02618 BLD-Framing/Rough-in7/1/20207/1/20207/1/2020 1:33:49 PMPNH
Denise *screened* Phone #: ###-####. No one home, no access. Will need to reschedule.
BLD20-01255 BLD-Framing/Rough-in7/1/20207/1/20207/1/2020 11:44:25 AMAFAIL
Phone #: ###-#### Inspection requested via web by Allen Jones. Bracr bottom chord above filler on A02 trusses. Install 4x8 header over doorway to front bedroom. Ok to insulate. C/N posted.
BLD20-01620 BLD-Wall Bracing7/1/20207/1/20207/1/2020 11:27:42 AMAPASS
Phone #: ###-#### Inspection requested via web by Allen Jones
BLD20-01272 BLD-Wall Bracing7/1/20207/1/20207/1/2020 11:04:19 AMAPASS
Phone #: ###-#### Inspection requested via web by Allen Jones
BLD20-02215 BLD-Conference7/1/20207/1/20207/1/2020 10:38:03 AMADONE
have a 3 layer roof need written conformation 3 layer roof must be striped to deck so asphalt shingles can be nailed to solid deck per code R905.2.1 and code R908.3.1.1 Phone #: ###-#### Inspection requested via web by Scott Tennant. On site to issue a correction notice notice. Per IRC sec. 908.3.1.1 item #3, roof recover is not allowed where the existing roof has two or more applications of any type of roof covering. Also noted roofers were removing all exisitng roof coverings down to shating while on site.
BLD18-01027 BLD-Framing/Rough-in6/24/20207/1/20207/1/2020 10:15:16 AMACANC
BLD20-01599 BLD-Framing/Rough-in6/30/20207/1/20207/1/2020 9:18:31 AMAPASS
Jay Walters is the onsite contact - ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting. All modules placed per plan. All clearnces maintained. As per letter from structural engineer, no work need to reinforce existing roof.
BLD20-00209 BLD-Foundation6/30/20207/1/20207/1/2020 9:00:41 AMACANC
Would like to place 2 columns next to existing building at 10:30 am. Phone #: ###-#### Inspection requested via web by John Saucerman. concrete pilasters against existing columns.
BLD20-00295 BLD-Wall Bracing6/30/20207/1/20207/1/2020 8:34:34 AMAPASS
Could not answer questions......shear // rod Phone #: ###-####. Interior shear wall ok.