Inspections for the day of: Thursday, July 12, 2018.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD16-04223 BLD-Conference7/11/20187/12/20187/12/2018 5:02:25 PMPDONE
afternoon between 1:45 and 3:45 for review of fire shaft correction notice. Please call me before you plan on going out so I can meet you there. Phone #: ###-#### Inspection requested via web by Stephen Lee. Discussed repairs with contractor and their proposed solutions prior to moving foward.
BLD18-02148 BLD-Framing/Rough-in7/11/20187/12/20187/12/2018 5:01:34 PMAPART
The remainder of of roof deck that is being replaced has been completed. Attacment was ok. No joist replacement needed. Also noted that mechanical contractor started work to reinstall the airhandler/ac unit this morning. Addirional blocking was not installed per the engineers details. 3/8 inch diameter x3 inch long anchors were installed on bottom chord of new roof joist. the existing airhandler/acunit had not yet been hung. Work was temporarily stopped in this area until the appropriate blocking per the approved engineers detail has been completed and inspected prior to reinstalling the existing airhandeler/ac unit. Engineer was notified (Shawn Reader) on anchor install. Noted that it should be ok if anchors were less than 1/2 inch in diameter. Mr. Reader has been notified of the actual diameter. Will proceed as needed if there are any changes.
BLD17-03632 BLD-Framing/Rough-in7/11/20187/12/20187/12/2018 3:43:37 PMPFAIL
Jim Wellman Phone #: ###-#### Inspection requested via web by Jim Wellman..Complete airseal pack. Install remainder of simpson straps from masonry wall ro new construction. Noted that ADA transfer shower has been installed incorrectly. Seat side does not provide the required 12 inches of clearance beyond.
BLD18-00301 BLD-Final7/11/20187/12/20187/12/2018 2:57:14 PMPFAIL
Will Phone #: ###-####. Provide code compliant handrails on the new stairs that have been replced.
BLD17-00339 BLD-Ceiling Grid Inspection7/11/20187/12/20187/12/2018 2:15:35 PMPPASS
Plumbing final (PLM17-03541) scheduled for AM on 7-12, if this passes, we would like approval to install all ceiling tile. Phone #: ###-#### Inspection requested via web by Jackie Phelps
BLD18-01996 BLD-Framing/Rough-in7/12/20187/12/20187/12/2018 1:43:16 PMPPASS
Jim Phone #: ###-####. INterior steel stud framed walls only ok.
BLD16-04492 BLD-Energy code compliance7/12/20187/12/20187/12/2018 12:10:26 PMAPASS
Phone #: ###-#### Inspection requested via web by Sam Brown
BLD16-04494 BLD-Energy code compliance7/12/20187/12/20187/12/2018 12:10:07 PMAPASS
Phone #: ###-#### Inspection requested via web by Sam Brown
BLD18-00283 BLD-Footing7/11/20187/12/20187/12/2018 12:00:35 PMAPASS
Phone #: 2083425188 >> Inspection requested via mobile web by Chris Hopkins
BLD18-01424 BLD-Framing/Rough-in7/12/20187/12/20187/12/2018 10:13:48 AMANR
Phone #: ###-#### Inspection requested via web by Kelly Stover.. Need mech rough in inspection.
BLD18-01465 BLD-Framing/Rough-in7/11/20187/12/20187/12/2018 10:09:19 AMAFAIL
Phone #: ###-#### Inspection requested via web by Andy Thompson. Complete lateral bracing on A3 and B1 trusses. Fireblock fur dowm in masterbedroom and mech chases upstairs. Provide attic access in livingroom/bedroom and aditional access in garage. Finish nailing off 3ply B2 attic truss. Correction notice posted.
BLD18-01975 BLD-Energy code compliance7/11/20187/12/20187/12/2018 9:16:06 AMAPASS
Bob Phone #: ###-####
BLD17-02631 BLD-Aging Inspection7/12/20187/12/20187/12/2018 7:34:17 AM PASS