Inspections for the day of: Friday, July 13, 2018.
Number of inspections: 22
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-02148 BLD-Framing/Rough-in7/12/20187/13/20187/13/2018 4:12:39 PMAPART
Noted that air handler/acunit has been hung using the 3/8 inch diameter x 3 inch long anchors to bottom chords of new roof joist. Spoke with Shawn Reader (engineer) and he has noted that this is acceptable. Shawn will email me anew detail with calcs showing this will work in place of previous detail.
BLD18-01465 BLD-Energy code compliance7/13/20187/13/20187/13/2018 4:01:34 PMPPASS
Phone #: ###-#### Inspection requested via web by Andy Thompson
BLD18-01465 BLD-Framing/Rough-in7/13/20187/13/20187/13/2018 4:01:23 PMPPASS
Phone #: ###-#### Inspection requested via web by Andy Thompson
ESC17-01666 Site Final7/13/20187/13/20187/13/2018 3:27:21 PMPDONE
ESC17-01666 DOC - Permit Finaled7/13/20187/13/20187/13/2018 3:27:13 PMPPASS
BLD17-04377 BLD-Final7/13/20187/13/20187/13/2018 3:27:05 PMPPASS
Garage door code is 2468 Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD17-04377 DOC - Permit Finaled7/13/20187/13/20187/13/2018 3:26:56 PMPPASS
BLD17-04377 BLD-Blower Door Test Results7/13/20187/13/20187/13/2018 3:19:53 PMPDONE
Garage door code is 2468 Phone #: ###-#### Inspection requested via web by Joel Hirtle.

4.5ACH@50pca
BLD17-00339 BLD-Final7/12/20187/13/20187/13/2018 3:02:38 PMPPEND
Ross is the super, this inspection will be dependent on if fire Life Safety passes which is also scheduled for tomorrow. Phone #: ###-#### Inspection requested via web by Jackie Phelps
BLD18-00301 BLD-Final7/13/20187/13/20187/13/2018 2:09:18 PMPPASS
Will Phone #: ###-####. ok for perm occ.
BLD18-00301 DOC - Permit Finaled7/13/20187/13/20187/13/2018 2:09:03 PMPPASS
BLD18-01722 BLD-Final7/12/20187/13/20187/13/2018 1:56:23 PMPDONE
Phone #: ###-#### Inspection requested via web by BRS Permitting
BLD18-01722 DOC - Permit Finaled7/13/20187/13/20187/13/2018 1:56:15 PMPPASS
BLD18-00864 BLD-Final7/13/20187/13/20187/13/2018 1:32:52 PMPNR
Phone #: ###-#### Inspection requested via web by Raquel Kenley. Needs other trades to final first.
BLD17-01088 BLD-Ceiling Grid Inspection7/13/20187/13/20187/13/2018 1:30:15 PMPPASS
Charles Phone #: ###-####. phase 3 above ceiling and ceiling grid ok.
BLD17-03648 BLD-Framing/Rough-in7/12/20187/13/20187/13/2018 11:35:46 AMAPART
Jose Phone #: ###-####. Interior steel stud framed walls from gridlines 2 to 5 ok. Pending plumbing rough in inspection. Also noted that a select number of the interior full height walls are to be plenum walls. Electrical and plumbing inspectors were notified, as there are additional requirements.
BLD18-00632 BLD-Foundation7/13/20187/13/20187/13/2018 10:51:30 AMAPASS
Hi Mike
we have a 12:00 placement scheduled for the west structure, all stem walls. Strata will be onsite for rebar and concrete testing. Phone #: ###-#### Inspection requested via web by Jim Carriveau. perimeter and interior stemwalls for west structure(gym and school)
BLD18-01549 BLD-Final7/12/20187/13/20187/13/2018 10:19:45 AMADONE
We reroofed the admin/office building only. (did not include any of the storage buildings) Thank you. Phone #: ###-#### Inspection requested via web by Hans Weikl
BLD18-01549 DOC - Permit Finaled7/13/20187/13/20187/13/2018 10:19:30 AMPPASS
BLD18-01764 BLD-Framing/Rough-in7/12/20187/13/20187/13/2018 10:10:56 AMAPASS
Please call Kelly 30 minutes prior to inspection Phone #: ###-#### Inspection requested via web by Brian McCoy
BLD18-02204 BLD-Footing7/12/20187/13/20187/13/2018 9:52:56 AMAPASS
Andrew Phone #: ###-####
BLD18-02020 BLD-Footing7/12/20187/13/20187/13/2018 9:31:46 AMAPASS
Chris Phone #: ###-####