Inspections for the day of: Thursday, July 2, 2020.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD20-02215 BLD-Final7/1/20207/2/20207/2/2020 4:57:09 PMPPASS
Phone #: ###-#### Inspection requested via web by Scott Tennant. Noted that roof repair could not be completed due to 3 layers of shingles already in place. A non compliant item can not be repaired.
BLD18-04521 BLD-Final7/1/20207/2/20207/2/2020 4:19:05 PMPNR
Building Final inspection Phone #: ###-#### Inspection requested via web by Kris Linnell
BLD20-01599 BLD-Final7/1/20207/2/20207/2/2020 4:18:24 PMPDONE
Onsite contact: Mierins
###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting
BLD20-01599 DOC - Permit Finaled7/2/20207/2/20207/2/2020 4:18:17 PMPPASS
BLD20-02215 DOC - Permit Finaled7/2/20207/2/20207/2/2020 4:18:08 PMPPASS
BLD20-00308 BLD-Framing/Rough-in7/1/20207/2/20207/2/2020 2:18:46 PMPFAIL
Kyle Phone #: ###-####. Needs to provide updated strucutural details for steel studs in lieu of LVL studs for exterior furouts. Need special inspection reports for concrete and epoxy to date. Also needs to provide fire conferance on exterior furouts. Called Kyle at above number and left message. do not cover furouts at this time.
BLD20-01334 BLD-Footing7/1/20207/2/20207/2/2020 2:16:28 PMPNR
Pat *screened* Phone #: ###-####BAsement is still being excavated.
BLD20-00258 BLD-Final7/2/20207/2/20207/2/2020 1:54:34 PMPPASS
Call for Access Phone #: ###-#### Inspection requested via web by Allen Jones
BLD20-00258 DOC - Permit Finaled7/2/20207/2/20207/2/2020 1:54:25 PMPPASS
BLD19-04893 BLD-Framing/Rough-in7/2/20207/2/20207/2/2020 1:13:44 PMPNH
Muhamed - *Screened* Phone #: ###-####. Doors locked, no access. Also noted that the airseal pak needs to be completed prior to framing inspection.
BLD18-02618 BLD-Framing/Rough-in7/2/20207/2/20207/2/2020 12:59:51 PMPPASS
Kathlan *screened* Phone #: ###-####. Ok to insulate.
BLD20-01657 BLD-Final6/30/20207/2/20207/2/2020 11:44:20 AMANR
Please call 30 minutes in advance Phone #: ###-#### Inspection requested via web by Chase Cheverton. Fire/life safety final has failed.
BLD20-00337 BLD-Footing7/1/20207/2/20207/2/2020 9:26:10 AMAPART
Screened // Chase Phone #: ###-####. Interior column pads and exterior footing in areas b and c. Ok to place pending special inspection.
BLD20-01669 BLD-Footing7/1/20207/2/20207/2/2020 8:56:34 AMAPASS
If you call 30 min before you arrive I can meet you at the project.
Thanks ; have a great day Phone #: ###-#### Inspection requested via web by William Meyer
BLD20-02215 BLD-Conference7/1/20207/2/20207/2/2020 8:38:27 AMAPASS
striped all layers of existing material to bare deck per our discussion now need bare inspection prior to covering. Replaced the dry rotted 1x10 roof sheeting.
Please come as early as possible repairs are completed as of Wednesday afternoon, shingles are on site. Thanks very much. Phone #: ###-#### Inspection requested via web by Scott Tennant
BLD20-01344 BLD-Energy code compliance7/1/20207/2/20207/2/2020 8:24:55 AMAPASS
Brad Phone #: ###-####
BLD19-04247 BLD-Final7/1/20207/2/20207/2/2020 7:12:32 AMPCANC
Final Inspections for carports Phone #: ###-#### >> Inspection requested via web by Kris Linnell Inspection cancelled from web by: Kris Linnell
BLD20-00376 BLD-Other6/30/20207/2/20207/2/2020 12:00:00 AMACANC
masonory- special inspectors at 10:45am Jay *screened* Phone #: ###-####