BLD20-00308
| BLD-Framing/Rough-in | 7/20/2020 | 7/20/2020 | 7/20/2020 4:39:02 PM | P | PASS |
|
|
support framing for overbuilds at parapets.
|
BLD20-01650
| BLD-Final | 7/17/2020 | 7/20/2020 | 7/20/2020 4:38:01 PM | P | NR |
|
|
screened // Isaac Phone #: ###-####. Fire final has failed.
|
BLD19-03209
| BLD-Ceiling Grid Inspection | 7/20/2020 | 7/20/2020 | 7/20/2020 4:37:39 PM | P | NR |
|
|
Tom - */Screened*/ Phone #: ###-####. Needs fire sprinkler rough in inspection.
|
BLD20-01782
| BLD-Wall Bracing | 7/20/2020 | 7/20/2020 | 7/20/2020 2:31:28 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Rob Johnson
|
BLD20-00906
| BLD-Energy code compliance | 7/20/2020 | 7/20/2020 | 7/20/2020 1:59:39 PM | P | PASS |
|
|
SCREENED // Aaron Phone #: ###-####
|
BLD19-02442
| BLD-Concrete | 7/17/2020 | 7/20/2020 | 7/20/2020 1:46:35 PM | P | PASS |
|
|
Rebar inspection for slab on grade Inspection requested via web by David Booth. Interior slab on grade area S3, bottling room.
|
BLD20-00100
| BLD-Final | 7/20/2020 | 7/20/2020 | 7/20/2020 1:21:00 PM | P | PASS |
|
|
Looking for our final on the second and last phase.
Phone #: ###-#### Inspection requested via web by Drew Moorhouse
|
BLD20-00100
| DOC - Permit Finaled | 7/20/2020 | 7/20/2020 | 7/20/2020 1:20:52 PM | P | PASS |
|
|
|
BLD16-04566
| BLD-Framing/Rough-in | 7/17/2020 | 7/20/2020 | 7/20/2020 11:42:40 AM | A | PASS |
|
|
Lee- */Virtual inspection requested for basement*/ Phone #: ###-####
|
BLD20-00308
| BLD-Framing/Rough-in | 7/17/2020 | 7/20/2020 | 7/20/2020 10:35:55 AM | A | PASS |
|
|
screened // Andrew Phone #: ###-####. Insualtion above freezer ok.
|
BLD19-03734
| BLD-Framing/Rough-in | 7/17/2020 | 7/20/2020 | 7/20/2020 10:20:41 AM | A | PASS |
|
|
Pre-engineered building erected, ready for insulation covering of purlins and girts. Phone #: ###-#### Inspection requested via web by Dan Murrer
|
BLD19-02853
| BLD-Wall Bracing | 7/17/2020 | 7/20/2020 | 7/20/2020 9:59:31 AM | A | NR |
|
|
Brian- */Screened*/ Phone #: ###-####. Building footprint has been altered. Home owner to resubmit new floorplan and braced wall plan to engineer for approval.
|
BLD20-01318
| BLD-Wall Bracing | 7/20/2020 | 7/20/2020 | 7/20/2020 8:37:14 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Rustin Ray. Ok to cover exterior with tyvek. Needs to complete the trussed braced frame and nail exterior per the W# wall type. Will verify this on framing inspection.
|