Inspections for the day of: Friday, July 21, 2017.
Number of inspections: 31
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS17-00099 MIS-Aging Inspection7/21/20177/21/20177/21/2017 4:17:13 PM DONE
MIS17-00099 DOC - Permit Finaled7/21/20177/21/20177/21/2017 4:17:06 PMPPASS
Fianled by mech.
BLD16-02020 BLD-Final7/21/20177/21/20177/21/2017 4:06:19 PMPNR
Rob Phone #: ###-####. Needs zoning final first.
BLD17-00359 BLD-Footing7/21/20177/21/20177/21/2017 3:55:46 PMPCANC
BLD17-01731 BLD-Energy code compliance7/20/20177/21/20177/21/2017 3:52:23 PMPPASS
Phone #: 2085015747 >> Inspection requested via mobile web by Tom Lane
BLD17-01731 BLD-Framing/Rough-in7/20/20177/21/20177/21/2017 3:52:07 PMPPASS
Phone #: 2085015747 >> Inspection requested via mobile web by Tom Lane
BLD16-01757 BLD-Framing/Rough-in7/21/20177/21/20177/21/2017 3:32:51 PMPPASS
Bldg. 100 roof ok toover.
BLD16-04113 BLD-Final7/21/20177/21/20177/21/2017 3:15:52 PMPFAIL
Evan Phone #: ###-####. Needs blower door test, patch sheetrock in garage for unprotected opening.
BLD16-02237 BLD-Final7/21/20177/21/20177/21/2017 2:40:04 PMPPASS
Miles Phone #: ###-####
BLD16-02237 DOC - Permit Finaled7/21/20177/21/20177/21/2017 2:39:52 PMPPASS
All work appeared to be done in accordance with local codes and ordinances.
BLD17-01462 BLD-Final7/20/20177/21/20177/21/2017 2:37:58 PMPPASS
please call for access Phone #: ###-#### Inspection requested via web by matthew greenman. Ok for perm oc.
BLD17-00763 BLD-Foundation7/19/20177/21/20177/21/2017 1:45:33 PMADEFR
MTI scheduled to Insp rebar and concrete at lines 1 west ; A. Concrete scheduled for 1:00pm. Thanks, Mark Steen Phone #: ###-#### Inspection requested via web by Kareen Falls. Ok pending special inspection.
BLD17-01845 BLD-Final7/20/20177/21/20177/21/2017 1:38:01 PMPCANC
Please call before heading over. Phone #: ###-#### Inspection requested via web by Randall Parker
BLD17-01845 BLD-Framing/Rough-in7/21/20177/21/20177/21/2017 1:37:55 PMPPASS
Please call before heading over. Phone #: ###-#### Inspection requested via web by Randall Parker. 1st. story ok.
MIS17-00228 BLD-Conference7/20/20177/21/20177/21/2017 12:32:45 PMAPASS
complaint, residing without permit
MIS17-00228 DOC - Permit Finaled7/21/20177/21/20177/21/2017 12:32:33 PMPPASS
A building permit has been issued.
BLD17-01885 BLD-Final7/18/20177/21/20177/21/2017 11:50:49 AMACANC
Phone #: ###-#### Inspection requested via web by Naida Khan
BLD17-01885 BLD-Final7/18/20177/21/20177/21/2017 11:44:46 AMADONE
Phone #: ###-#### Inspection requested via web by Naida Khan
BLD17-01885 DOC - Permit Finaled7/21/20177/21/20177/21/2017 11:44:34 AMPPASS
All work appeared to be done in accordance with local codes and ordinaces.
BLD17-01674 BLD-Framing/Rough-in7/19/20177/21/20177/21/2017 11:22:47 AMANR
Should be on site around 9am. Please call ahead if any questions Phone #: ###-#### Inspection requested via web by Christian Kilpatrick. Needs electrical final first.
BLD16-01757 BLD-Framing/Rough-in7/20/20177/21/20177/21/2017 11:14:31 AMAFAIL
Steve Phone #: ###-####. Complete all penetrations on smoke barrier wall. Remove rock from areas behind tubs on either side of smoke barrier walls and conplete ceiling assembly and rock those portions of smoke barrier.
ESC17-00202 General Inspection7/21/20177/21/20177/21/2017 10:11:42 AMAPASS
ESC17-00202 Site Preparation7/21/20177/21/20177/21/2017 10:11:32 AMAPASS
BLD17-00526 BLD-Framing/Rough-in7/19/20177/21/20177/21/2017 10:11:18 AMAPASS
Framing inspection. Phone #: ###-#### Inspection requested via web by Jeffrey Huffer
BLD15-01339 BLD-Final7/20/20177/21/20177/21/2017 9:48:30 AMAPASS
After 930 if possible // Ryan Phone #: ###-####
BLD15-01339 DOC - Permit Finaled7/21/20177/21/20177/21/2017 9:48:23 AMPPASS
BLD16-01697 BLD-Final7/19/20177/21/20177/21/2017 9:29:17 AMAPASS
Brian Gross Phone #: ###-####
ESC17-00932 Site Preparation7/21/20177/21/20177/21/2017 9:18:23 AMAPASS
BLD17-02470 BLD-Foundation7/20/20177/21/20177/21/2017 9:18:11 AMAPASS
Greg Phone #: ###-####
BLD15-02010 BLD-Final7/20/20177/21/20177/21/2017 9:06:43 AMAPASS
Joe or ###-#### Stacey-please call for access Phone #: ###-####. All issues were resolved. Ok for perm. occ. No card on site to sign.
BLD17-01173 BLD-Concrete7/20/20177/21/20177/21/2017 8:54:13 AMAPASS
rebar in piers - Mark Phone #: ###-####. Column pad footings 4 total ok..