Inspections for the day of: Tuesday, July 3, 2018.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD17-04224 BLD-Final7/2/20187/3/20187/4/2018 8:39:07 AMACANC
Phone #: ###-#### Inspection requested via web by Todd Campbell
BLD18-02117 BLD-Final7/2/20187/3/20187/3/2018 4:14:56 PMPNR
Gene--backup cell number is ###-#### Phone #: ###-####
BLD18-01103 BLD-Footing7/3/20187/3/20187/3/2018 3:54:25 PMPPART
Blane Phone #: ###-####
BLD17-02428 BLD-Final7/3/20187/3/20187/3/2018 3:11:27 PMPFAIL
Phone #: ###-#### Inspection requested via web by David Scaggs. Noted some 20 min doors not installed, all 20 min doors need to be self closing. Fire caulk all penetrations in garages. Still need to verifiy 1 hr. wall continuity in garage to bottom of roof deck.
BLD17-04653 BLD-Framing/Rough-in7/3/20187/3/20187/3/2018 2:44:50 PMPPASS
Interior wood shear wall nailing inspection. Phone #: ###-#### Inspection requested via web by Don Walker
BLD18-02287 BLD-Final7/3/20187/3/20187/3/2018 1:25:00 PMPDONE
need final Phone #: ###-#### Inspection requested via web by Chris Howell
BLD18-02287 DOC - Permit Finaled7/3/20187/3/20187/3/2018 1:24:48 PMPPASS
All work appeared to be done in accordance with local codes and ordinances.
MIS18-00170 BLD-Conference5/29/20187/3/20187/3/2018 11:39:36 AMADONE
Check on progres. End of 25 day notice. Building tenant has obtained the services of an engineer/architect and will submit plans.
BLD18-01737 BLD-Framing/Rough-in7/3/20187/3/20187/3/2018 11:06:24 AMAPASS
As early as possible Phone #: 2085904252 >> Inspection requested via mobile web by Jon craft. Interior steel stud framed walls ok. Soffits ok, pending electrical and fire sprinkler rough in inspections.
MIS18-00083 MIS-Aging Inspection7/3/20187/3/20187/3/2018 10:50:48 AM PASS
MIS18-00083 DOC - Permit Finaled7/3/20187/3/20187/3/2018 10:50:40 AMPPASS
BLD17-03616 BLD-Final7/2/20187/3/20187/3/2018 10:17:10 AMANR
Brad Phone #: ###-####. Needs electrical and mech. finals.
BLD18-01922 BLD-Framing/Rough-in7/2/20187/3/20187/3/2018 9:52:08 AMAPASS
Jeff Phone #: ###-####. Floor joist replacement ok. ok to cover. Also inspected exterior wall elements. All damaged siding has been removed. Framing elements at exterior wall showed no fire damaged.
BLD18-02003 BLD-Wall cover7/2/20187/3/20187/3/2018 9:11:26 AMACANC
Phone #: ###-#### Inspection requested via web by Robert Frazier
BLD18-02003 BLD-Framing/Rough-in7/3/20187/3/20187/3/2018 9:11:21 AMAPASS
Phone #: ###-#### Inspection requested via web by Robert Frazier.. New double level beam ok in existing structure in place of demoed bearing wall.
BLD18-02148 BLD-Framing/Rough-in7/3/20187/3/20187/3/2018 8:57:29 AMAPART
Work in progress. Area of work consisted of 2 joist replacement today. New joist were sistered next to existing joist. Noted approx. 1.25 inch deflection(sag) in existing joist. Exisiting joist were not removed due to sprinkler pipe hangars and conduit being attached. These will need to be moved and attached to new joist.