BLD17-04224
| BLD-Final | 7/2/2018 | 7/3/2018 | 7/4/2018 8:39:07 AM | A | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Todd Campbell
|
BLD18-02117
| BLD-Final | 7/2/2018 | 7/3/2018 | 7/3/2018 4:14:56 PM | P | NR |
|
|
Gene--backup cell number is ###-#### Phone #: ###-####
|
BLD18-01103
| BLD-Footing | 7/3/2018 | 7/3/2018 | 7/3/2018 3:54:25 PM | P | PART |
|
|
Blane Phone #: ###-####
|
BLD17-02428
| BLD-Final | 7/3/2018 | 7/3/2018 | 7/3/2018 3:11:27 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by David Scaggs. Noted some 20 min doors not installed, all 20 min doors need to be self closing. Fire caulk all penetrations in garages. Still need to verifiy 1 hr. wall continuity in garage to bottom of roof deck.
|
BLD17-04653
| BLD-Framing/Rough-in | 7/3/2018 | 7/3/2018 | 7/3/2018 2:44:50 PM | P | PASS |
|
|
Interior wood shear wall nailing inspection. Phone #: ###-#### Inspection requested via web by Don Walker
|
BLD18-02287
| BLD-Final | 7/3/2018 | 7/3/2018 | 7/3/2018 1:25:00 PM | P | DONE |
|
|
need final Phone #: ###-#### Inspection requested via web by Chris Howell
|
BLD18-02287
| DOC - Permit Finaled | 7/3/2018 | 7/3/2018 | 7/3/2018 1:24:48 PM | P | PASS |
|
|
All work appeared to be done in accordance with local codes and ordinances.
|
MIS18-00170
| BLD-Conference | 5/29/2018 | 7/3/2018 | 7/3/2018 11:39:36 AM | A | DONE |
|
|
Check on progres. End of 25 day notice. Building tenant has obtained the services of an engineer/architect and will submit plans.
|
BLD18-01737
| BLD-Framing/Rough-in | 7/3/2018 | 7/3/2018 | 7/3/2018 11:06:24 AM | A | PASS |
|
|
As early as possible Phone #: 2085904252 >> Inspection requested via mobile web by Jon craft. Interior steel stud framed walls ok. Soffits ok, pending electrical and fire sprinkler rough in inspections.
|
MIS18-00083
| MIS-Aging Inspection | 7/3/2018 | 7/3/2018 | 7/3/2018 10:50:48 AM | | PASS |
|
|
|
MIS18-00083
| DOC - Permit Finaled | 7/3/2018 | 7/3/2018 | 7/3/2018 10:50:40 AM | P | PASS |
|
|
|
BLD17-03616
| BLD-Final | 7/2/2018 | 7/3/2018 | 7/3/2018 10:17:10 AM | A | NR |
|
|
Brad Phone #: ###-####. Needs electrical and mech. finals.
|
BLD18-01922
| BLD-Framing/Rough-in | 7/2/2018 | 7/3/2018 | 7/3/2018 9:52:08 AM | A | PASS |
|
|
Jeff Phone #: ###-####. Floor joist replacement ok. ok to cover. Also inspected exterior wall elements. All damaged siding has been removed. Framing elements at exterior wall showed no fire damaged.
|
BLD18-02003
| BLD-Wall cover | 7/2/2018 | 7/3/2018 | 7/3/2018 9:11:26 AM | A | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Robert Frazier
|
BLD18-02003
| BLD-Framing/Rough-in | 7/3/2018 | 7/3/2018 | 7/3/2018 9:11:21 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Robert Frazier.. New double level beam ok in existing structure in place of demoed bearing wall.
|
BLD18-02148
| BLD-Framing/Rough-in | 7/3/2018 | 7/3/2018 | 7/3/2018 8:57:29 AM | A | PART |
|
|
Work in progress. Area of work consisted of 2 joist replacement today. New joist were sistered next to existing joist. Noted approx. 1.25 inch deflection(sag) in existing joist. Exisiting joist were not removed due to sprinkler pipe hangars and conduit being attached. These will need to be moved and attached to new joist.
|