Inspections for the day of: Wednesday, July 3, 2019.
Number of inspections: 35
Percentage of inspections complete: 80 %
Percentage of inspections not complete: 20 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS18-00319 DOC - Permit Finaled7/3/20197/3/20197/3/2019 2:59:40 PMPPASS
BLD19-01364 BLD-Framing/Rough-in7/3/20197/3/20197/3/2019 2:58:38 PMPNR
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Will inspect framing corrections on energy code inspection. Noted that electrical rough in inspection has know passed. Ok to insulate.
BLD18-02407 BLD-Concrete7/1/20197/3/20197/3/2019 2:57:12 PMPNR
late afternoon - rebar // Doug Phone #: ###-####. Needs to provide the city set of approved plans. Also noted to concrete contractor that special inspection is required.
BLD19-01403 BLD-Energy code compliance7/3/20197/3/20197/3/2019 2:23:44 PMPPASS
Kenny-footing insulation Phone #: ###-#### Rigid insulation on stemwall under slab on grade.
BLD19-01402 BLD-Energy code compliance7/3/20197/3/20197/3/2019 2:23:23 PMPPASS
Kenny-footing insulation Phone #: ###-#### Rigid insulation on stemwall under slab on grade.
BLD19-01401 BLD-Blower Door Test Results7/3/20197/3/20197/3/2019 2:23:04 PMPPASS
Kenny-footing insulation Phone #: ###-#### Rigid insulation on stemwall under slab on grade.
BLD19-01400 BLD-Energy code compliance7/3/20197/3/20197/3/2019 2:22:45 PMPPASS
Kenny-footing insulation Phone #: ###-#### Rigid insulation on stemwall under slab on grade.
BLD19-01399 BLD-Energy code compliance7/3/20197/3/20197/3/2019 2:22:19 PMPPASS
Kenny-footing insulation Phone #: ###-#### Rigid insulation on stemwall under slab on grade.
BLD19-01398 BLD-Energy code compliance7/3/20197/3/20197/3/2019 2:21:54 PMPPASS
Kenny-footing insulation Phone #: ###-#### Rigid insulation on stemwall under slab on grade.
BLD19-01373 BLD-Energy code compliance7/3/20197/3/20197/3/2019 2:21:33 PMPPASS
Kenny-footing insulation Phone #: ###-####. Rigid insulation on stemwall under slab on grade.
BLD19-01444 BLD-Final7/2/20197/3/20197/3/2019 2:00:48 PMPPASS
Access to unit via lockbox located in Mailbox near door. Code is 2805. Please call Chad @208.994.2805 prior to inspection. Phone #: ###-#### Inspection requested via web by Chad Aland. All issues have been resolved. ok for perm occ.
BLD19-02343 BLD-Conference7/3/20197/3/20197/3/2019 1:43:50 PMPDONE
Phone #: ###-#### Inspection requested via web by Hannah Maurer
BLD19-02343 DOC - Permit Finaled7/3/20197/3/20197/3/2019 1:43:39 PMPPASS
Deck is completed. Could only inspect what was visible at this time.
BLD18-02644 BLD-Ceiling Grid Inspection7/2/20197/3/20197/3/2019 1:21:51 PMPPART
Cameron Phone #: ###-####-please call prior to meet. Ceiling grid in phase 2 ok pending MEP's rough in inspections.
BLD19-00154 BLD-Framing/Rough-in7/2/20197/3/20197/3/2019 11:38:39 AMANR
Shawn Phone #: ###-####. Needs to provide a full set of city approved plans. Missing Structural pages, which contained engineering for theRV bay tall walls and shear walls.
BLD19-00803 BLD-Framing/Rough-in7/2/20197/3/20197/3/2019 10:58:51 AMAFAIL
Thanks. Phone #: ###-#### Inspection requested via web by Scott Zierler. All issues resolved except fot notched F3 truss at bearing.
BLD19-02281 BLD-Framing/Rough-in7/2/20197/3/20197/3/2019 10:34:22 AMAPASS
Call prior to going Phone #: 5414086230 >> Inspection requested via mobile web by Tom. Interior wood framed wall ok.
BLD19-01062 BLD-Final7/2/20197/3/20197/3/2019 10:22:03 AMAPASS
Thank you! Have a great and safe 4th of July!! Phone #: ###-#### Inspection requested via web by Candyce Moss
BLD19-01062 DOC - Permit Finaled7/3/20197/3/20197/3/2019 10:21:43 AMPPASS
ESC18-01044 Site Final7/3/20197/3/20197/3/2019 10:02:12 AMADONE
ESC18-01044 DOC - Permit Finaled7/3/20197/3/20197/3/2019 10:02:01 AMPPASS
BLD18-02537 BLD-Final7/2/20197/3/20197/3/2019 10:01:46 AMAPASS
David Phone #: ###-####
BLD18-02537 DOC - Permit Finaled7/3/20197/3/20197/3/2019 10:01:38 AMPPASS
BLD18-02537 BLD-Blower Door Test Results7/3/20197/3/20197/3/2019 10:00:55 AMADONE
4.1
BLD18-04288 BLD-Footing7/2/20197/3/20197/3/2019 9:30:14 AMAPART
Glen- Building 2 rebar footing inspection Phone #: ###-####. North footing. Work in progress on installing dowels. Ok to place concrete pending special inspection.
BLD19-01115 BLD-Final7/1/20197/3/20197/3/2019 8:53:27 AMADONE
Plans are attached to the monument sign Phone #: ###-#### Inspection requested via web by Laurie Hoelscher
BLD17-04653 BLD-Final7/2/20197/3/20197/3/2019 8:51:29 AMAFAIL
Phone #: ###-#### Inspection requested via web by David Sferle. Remove exit sign from from exterior door from kitchen. Provide ADA hardware on barn door. Provide the smoke and flame spread data for interior ceiling finish. Correction notice issued.
BLD18-03923 BLD-Final7/2/20197/3/20197/2/2019 12:00:00 AMPCANC
cancel per Yuiry Yuriy Phone #: ###-####
BLD19-01398 BLD-Footing7/3/20197/3/2019 P 
Kenny-footing insulation Phone #: ###-####
BLD19-01373 BLD-Footing7/3/20197/3/2019 P 
Kenny-footing insulation Phone #: ###-####
BLD19-01403 BLD-Footing7/3/20197/3/2019 P 
Kenny-footing insulation Phone #: ###-####
BLD19-01402 BLD-Footing7/3/20197/3/2019 P 
Kenny-footing insulation Phone #: ###-####
BLD19-01401 BLD-Footing7/3/20197/3/2019 P 
Kenny-footing insulation Phone #: ###-####
BLD19-01400 BLD-Footing7/3/20197/3/2019 P 
Kenny-footing insulation Phone #: ###-####
BLD19-01399 BLD-Footing7/3/20197/3/2019 P 
Kenny-footing insulation Phone #: ###-####