BLD18-03923
| BLD-Conference | 8/15/2019 | 8/16/2019 | | A | |
|
|
Brandon Hout Phone #: ###-####
|
BLD18-04549
| BLD-Framing/Rough-in | 8/19/2019 | 8/19/2019 | 8/19/2019 4:30:19 PM | P | PASS |
|
|
Rick Phone #: ###-####. Framing for restrooms only ok.
|
BLD19-01861
| DOC - Permit Finaled | 8/19/2019 | 8/19/2019 | 8/19/2019 3:36:23 PM | P | PASS |
|
|
|
BLD19-01505
| BLD-Other | 8/19/2019 | 8/19/2019 | 8/19/2019 3:25:52 PM | P | PASS |
|
|
Daniel- Block and Tie inspection Phone #: ###-####
|
BLD19-00929
| BLD-Final | 8/19/2019 | 8/19/2019 | 8/19/2019 3:25:35 PM | P | CANC |
|
|
Chris Phone #: ###-####
|
BLD19-02672
| BLD-Footing | 8/19/2019 | 8/19/2019 | 8/19/2019 3:07:31 PM | P | PASS |
|
|
Inspection requested via web by Darrin Jones
|
BLD19-01953
| BLD-Final | 8/16/2019 | 8/19/2019 | 8/19/2019 2:56:10 PM | P | PASS |
|
|
Please call 30 minutes before arrival Phone #: ###-#### Inspection requested via web by Chase Cheverton
|
BLD19-01953
| DOC - Permit Finaled | 8/19/2019 | 8/19/2019 | 8/19/2019 2:56:03 PM | P | PASS |
|
|
|
BLD19-02563
| BLD-Framing/Rough-in | 8/19/2019 | 8/19/2019 | 8/19/2019 2:43:46 PM | P | PASS |
|
|
Jason Phone #: ###-####. Interior steel stud framed walls ok, pending elec. and plumbing rough in inspections. ok to one side at type 1 hood only.
|
BLD19-02268
| BLD-Final | 8/19/2019 | 8/19/2019 | 8/19/2019 2:28:00 PM | P | PASS |
|
|
Please call when close to meet. Thanks!! Phone #: ###-#### Inspection requested via web by Ashleigh Meligan
|
BLD19-02268
| DOC - Permit Finaled | 8/19/2019 | 8/19/2019 | 8/19/2019 2:27:51 PM | P | PASS |
|
|
|
BLD19-02642
| BLD-Footing | 8/19/2019 | 8/19/2019 | 8/19/2019 1:59:42 PM | P | PASS |
|
|
irma Phone #: ###-####
|
BLD19-02128
| BLD-Foundation | 8/19/2019 | 8/19/2019 | 8/19/2019 1:45:08 PM | P | CANC |
|
|
late pm - underfloor // Sam Phone #: ###-####
|
BLD19-02662
| BLD-Energy code compliance | 8/19/2019 | 8/19/2019 | 8/19/2019 1:35:02 PM | P | PASS |
|
|
Rodrick Phone #: ###-####
|
BLD19-01513
| BLD-Footing | 8/19/2019 | 8/19/2019 | 8/19/2019 1:28:48 PM | P | CANC |
|
|
Chris Phone #: ###-####
|
BLD19-00552
| BLD-Wall Bracing | 8/16/2019 | 8/19/2019 | 8/19/2019 1:13:49 PM | A | PART |
|
|
jEFF Phone #: ###-#### Exterior framing and roof ok, still needs to install diagnol wind girts. No one on site. No call back from contractor.
|
BLD18-02799
| BLD-Conference | 8/16/2019 | 8/19/2019 | 8/19/2019 11:51:48 AM | A | DONE |
|
|
signage questions Phone #: ###-#### Inspection requested via web by Todd Landvatter
|
BLD19-01484
| BLD-Wall Bracing | 8/16/2019 | 8/19/2019 | 8/19/2019 11:23:34 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD19-03017
| BLD-Final | 8/15/2019 | 8/19/2019 | 8/19/2019 10:58:57 AM | A | DONE |
|
|
reroof Phone #: ###-#### Inspection requested via web by Elizabeth Melendez
|
BLD19-03017
| DOC - Permit Finaled | 8/19/2019 | 8/19/2019 | 8/19/2019 10:58:46 AM | P | PASS |
|
|
All work appeared to be done in accordance with local codes and ordinances.
|
BLD18-01631
| BLD-Conference | 8/13/2019 | 8/19/2019 | 8/19/2019 10:32:11 AM | A | DONE |
|
|
Call ahead to meet // Kerry Phone #: ###-####. Walk through. Noted no inspections for exterior door and new wall.
|
BLD19-02463
| BLD-Final | 8/16/2019 | 8/19/2019 | 8/19/2019 10:03:08 AM | A | PASS |
|
|
Requested by Shane Treasure ###-#### Phone #: ###-#### Inspection requested via web by Shane Treasure
|
BLD19-02463
| DOC - Permit Finaled | 8/19/2019 | 8/19/2019 | 8/19/2019 10:02:59 AM | P | PASS |
|
|
|
BLD18-02644
| BLD-Final | 8/16/2019 | 8/19/2019 | 8/19/2019 9:54:04 AM | A | PART |
|
|
CAMERON Phone #: ###-####. ,Phase 2 ok to occupy.
|
BLD18-04520
| BLD-Energy code compliance | 8/16/2019 | 8/19/2019 | 8/19/2019 9:29:30 AM | A | PASS |
|
|
South Half of building 11 energy code compliance for stem wall insulation. Phone #: ###-#### Inspection requested via web by Kris Linnell
|
BLD18-04520
| BLD-Footing | 8/16/2019 | 8/19/2019 | 8/19/2019 9:29:13 AM | A | PASS |
|
|
North Half Building 11 footing rebar inspection. Concrete scheduled for 11:45 A.M.- Third Party inspector scheduled onsite for pour. Phone #: ###-#### Inspection requested via web by Kris Linnell
|
BLD19-01556
| BLD-Other | 8/16/2019 | 8/19/2019 | 8/19/2019 9:10:57 AM | A | PEND |
|
|
red iron structural insp // Barney Harper Phone #: ###-####. High strength bolting. torque wrench method used. All plys in contact. Special inspection will be out this afternoon.
|
BLD19-01429
| BLD-Final | 8/16/2019 | 8/19/2019 | 8/19/2019 8:57:33 AM | A | PASS |
|
|
Tom Phone #: ###-####. OK for perm occ. No card on site to sign.
|
BLD16-04566
| BLD-Conference | 8/15/2019 | 8/19/2019 | 8/19/2019 8:38:50 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Lee Coulson. OK to insulate. Needs to complete airseal and fireblock ubove fireplace.
|