Inspections for the day of: Monday, August 20, 2018.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-02741 BLD-Final8/17/20188/20/20188/21/2018 9:00:41 AMPDONE
Phone #: ###-#### Inspection requested via web by BRS Permitting
BLD17-03128 BLD-Final8/20/20188/20/20188/20/2018 3:44:20 PMPPASS
Phone #: ###-#### Inspection requested via web by Darrell Gogert. Ok for temp occ. Will be ok for perm occ. once plumbing and electrical sign perm.
BLD16-04499 BLD-Framing/Rough-in8/20/20188/20/20188/20/2018 2:58:56 PMPFAIL
Phone #: ###-#### Inspection requested via web by Sam Brown. Window at mid landing required tobe tempered. @hr. firewall not o bottom of roof deck upstairs. Need to fire block fir out wall upstairs.. Ok to insulate. Correction notice posted.
BLD16-04498 BLD-Framing/Rough-in8/20/20188/20/20188/20/2018 2:57:24 PMPFAIL
Phone #: ###-#### Inspection requested via web by Sam Brown. Strap double top plate at 1/2 inch gas pipe penetration. Nail off simpson hangar on 2ply girder truss upsatirs. Window next to shower requied to be tempered. Ok to insulate. Correction notice posted.
BLD16-04494 BLD-Final8/20/20188/20/20188/20/2018 2:28:34 PMPNR
Phone #: ###-#### Inspection requested via web by Sam Brown. Needs MEP finals first.
BLD16-04470 BLD-Final8/20/20188/20/20188/20/2018 2:26:37 PMPFAIL
Phone #: ###-#### Inspection requested via web by Sam Brown. Complete fire caulking in garage. Still needs plumbing final. Correction notice issued.
BLD16-04470 BLD-Blower Door Test Results8/20/20188/20/20188/20/2018 2:25:56 PMPDONE
5.8ACH @50pa
BLD16-04472 BLD-Final8/20/20188/20/20188/20/2018 2:22:26 PMPPASS
Phone #: ###-#### Inspection requested via web by Sam Brown
BLD16-04472 DOC - Permit Finaled8/20/20188/20/20188/20/2018 2:22:18 PMPPASS
BLD16-04472 BLD-Blower Door Test Results8/20/20188/20/20188/20/2018 2:22:03 PMPDONE
5.6ACH @50pa
BLD16-04459 BLD-Final8/20/20188/20/20188/20/2018 1:47:41 PMPPASS
Phone #: ###-#### Inspection requested via web by Sam Brown
BLD16-04459 DOC - Permit Finaled8/20/20188/20/20188/20/2018 1:47:33 PMPPASS
BLD16-04459 BLD-Blower Door Test Results8/20/20188/20/20188/20/2018 1:44:39 PMPDONE
5.9ACH @50pa
BLD16-04455 BLD-Final8/20/20188/20/20188/20/2018 1:44:04 PMPNR
Phone #: ###-#### Inspection requested via web by Sam Brown. Needs to install code compliant handrail. Everything elese ok.
BLD16-04455 BLD-Blower Door Test Results8/20/20188/20/20188/20/2018 1:44:03 PMPDONE
6.8ACH @50pa
BLD16-04476 BLD-Final8/20/20188/20/20188/20/2018 10:40:37 AMPCANC
Phone #: ###-#### >> Inspection requested via web by Sam Brown Inspection cancelled from web by: Sam Brown
BLD17-04256 BLD-Energy code compliance8/20/20188/20/20188/20/2018 9:58:34 AMAPASS
Phone #: ###-#### Inspection requested via web by Nate Mitchell
BLD17-04254 BLD-Energy code compliance8/20/20188/20/20188/20/2018 9:58:24 AMAPASS
Phone #: ###-#### Inspection requested via web by Nate Mitchell
BLD17-04255 BLD-Energy code compliance8/20/20188/20/20188/20/2018 9:58:11 AMAPASS
Phone #: ###-#### Inspection requested via web by Nate Mitchell
BLD17-04253 BLD-Energy code compliance8/20/20188/20/20188/20/2018 9:58:00 AMAPASS
Phone #: ###-#### Inspection requested via web by Nate Mitchell
BLD18-02310 BLD-Wall Bracing8/17/20188/20/20188/20/2018 8:36:52 AMANR
Shear wall - Bob Phone #: ###-####. Will reschedule.