Inspections for the day of: Tuesday, August 20, 2019.
Number of inspections: 15
Percentage of inspections complete: 93 %
Percentage of inspections not complete: 7 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-03923 BLD-Conference8/15/20198/16/2019 A 
Brandon Hout Phone #: ###-####
BLD19-02207 BLD-Final8/20/20198/20/20198/20/2019 3:14:47 PMPDONE
Phone #: ###-#### Inspection requested via web by Michael La Pointe
BLD19-02207 DOC - Permit Finaled8/20/20198/20/20198/20/2019 3:14:38 PMPPASS
All work appeard to be done in accordance with local codes and ordinances.
BLD19-01002 BLD-Final8/20/20198/20/20198/20/2019 2:52:36 PMPFAIL
Re inspection for full c.o.
Thanks Phone #: ###-#### Inspection requested via web by Ryan Allen. All issues resolved except for the ADA bathroom signage. Provided signage is not ADA compliant.
BLD19-02088 BLD-Framing/Rough-in8/20/20198/20/20198/20/2019 2:43:27 PMPFAIL
gottie Phone #: ###-####. Needs to provide truss engineering for framing inspection.
BLD19-01326 BLD-Framing/Rough-in8/19/20198/20/20198/20/2019 2:11:08 PMPPASS
Please call JP at ###-####. Phone #: ###-#### Inspection requested via web by Mattie Botero
BLD19-03174 BLD-Framing/Rough-in8/20/20198/20/20198/20/2019 1:34:54 PMPPART
please call Rolando at ###-#### 30 minutes before arrival to gain access. Phone #: ###-#### Inspection requested via web by kevin debelloy. Provide shear blocking at framed in areas in kitchen. Will need to fur out bonus room trusses and encapsulate to accept R21 insulation. Ok to insulate.
BLD19-02837 BLD-Final8/19/20198/20/20198/20/2019 11:37:17 AMADONE
two story building- Roy Phone #: ###-####
BLD19-02837 DOC - Permit Finaled8/20/20198/20/20198/20/2019 11:37:17 AMPPASS
BLD19-03128 BLD-Final8/15/20198/20/20198/20/2019 10:24:29 AMADONE
reroof Phone #: ###-#### Inspection requested via web by Elizabeth Melendez
BLD19-03128 DOC - Permit Finaled8/20/20198/20/20198/20/2019 10:23:17 AMPPASS
All work appeard to be done in accordance with local codes and ordinances.
BLD18-03245 BLD-Energy code compliance8/19/20198/20/20198/20/2019 9:29:26 AMAPASS
ROBBIE Phone #: ###-####. Insulation at elevator shaft. Ok to start sheet rock on interior side.
BLD19-01384 BLD-Framing/Rough-in8/19/20198/20/20198/20/2019 8:56:40 AMAPASS
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD19-01807 BLD-Final8/19/20198/20/20198/20/2019 12:00:00 AMPCANC
Call 15 to 20 minutes ahead // John Phone #: ###-####
BLD19-01861 BLD-Final8/19/20198/20/20198/19/2019 3:36:32 PMAPASS
Chris Phone #: ###-####