BLD18-03906
| BLD-Wall cover | 8/6/2019 | 8/7/2019 | 8/7/2019 2:43:39 PM | P | CANC |
|
|
Parapet wall bracing. Give me a call. Phone #: ###-#### Inspection requested via web by Bob Thornton
|
BLD18-04307
| BLD-Final | 8/7/2019 | 8/7/2019 | 8/7/2019 2:29:43 PM | P | PASS |
|
|
Kenny Phone #: ###-####
|
BLD18-04307
| DOC - Permit Finaled | 8/7/2019 | 8/7/2019 | 8/7/2019 2:29:36 PM | P | PASS |
|
|
|
BLD18-03906
| BLD-Framing/Rough-in | 8/7/2019 | 8/7/2019 | 8/7/2019 1:59:28 PM | P | PASS |
|
|
Parapet wall bracing. Give me a call. Phone #: ###-#### Inspection requested via web by Bob Thornton
|
BLD18-03906
| BLD-Wall Bracing | 8/7/2019 | 8/7/2019 | 8/7/2019 1:58:50 PM | P | FAIL |
|
|
Parapet wall bracing. Give me a call. Phone #: ###-#### Inspection requested via web by Bob Thornton
|
BLD19-02128
| BLD-Other | 8/7/2019 | 8/7/2019 | 8/7/2019 1:58:26 PM | P | CANC |
|
|
Erme- stem wall inspection Phone #: ###-####
|
BLD19-02128
| BLD-Foundation | 8/7/2019 | 8/7/2019 | 8/7/2019 1:58:20 PM | P | PASS |
|
|
Erme- stem wall inspection Phone #: ###-####
|
BLD18-02176
| BLD-Framing/Rough-in | 8/6/2019 | 8/7/2019 | 8/7/2019 10:50:41 AM | A | PASS |
|
|
Nacho Phone #: ###-####. Interior steel stud framed walls, hardlids and mezzanines ok per approved plans and RFI's from engineer of record.
|
BLD19-02133
| BLD-Final | 8/6/2019 | 8/7/2019 | 8/7/2019 9:58:31 AM | A | DONE |
|
|
Mike-please call when on way, mike wants to meet you Phone #: ###-####
|
BLD19-02133
| DOC - Permit Finaled | 8/7/2019 | 8/7/2019 | 8/7/2019 9:58:20 AM | P | PASS |
|
|
|
BLD19-00763
| BLD-Final | 8/6/2019 | 8/7/2019 | 8/7/2019 9:24:15 AM | A | PASS |
|
|
Call half hour before to meet // Shawn Phone #: ###-####
|
BLD19-00763
| DOC - Permit Finaled | 8/7/2019 | 8/7/2019 | 8/7/2019 9:24:08 AM | P | PASS |
|
|
|
BLD17-04447
| BLD-Ceiling Grid Inspection | 8/7/2019 | 8/7/2019 | 8/7/2019 9:08:46 AM | A | PASS |
|
|
Kitchen ceiling grid, Phone #: ###-#### Inspection requested via web by Jim Carriveau
|
BLD19-01925
| BLD-Energy code compliance | 8/6/2019 | 8/7/2019 | 8/7/2019 8:54:54 AM | A | PASS |
|
|
Gari Phone #: ###-####
|
BLD19-02642
| BLD-Conference | 8/6/2019 | 8/7/2019 | 8/7/2019 8:41:54 AM | A | DONE |
|
|
Greg Phone #: ###-####. Met contractor on site to observe the finished excavation. Material is 7 to 8 inch minus pit run. Per the contractor, non is fill matersl, all cut. Did note that the top 6 to 8 inches is losse. It was decided to compactbottom of excavation prior to buildinng forms.
|