BLD19-01812
| BLD-Final | 9/17/2019 | 9/17/2019 | 9/17/2019 4:02:28 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by Scott Asin. Noted 2 open mech. permits. mech final for today has failed.
|
BLD19-02008
| BLD-Foundation | 9/16/2019 | 9/17/2019 | 9/17/2019 3:21:36 PM | P | DEFR |
|
|
Jerry Phone #: ###-####. Concrete already placed when on site. Contractor accepts all liability for foundation system.
|
BLD19-02328
| BLD-Foundation | 9/16/2019 | 9/17/2019 | 9/17/2019 3:20:35 PM | P | PASS |
|
|
Jerry Phone #: ###-####
|
BLD17-02871
| BLD-Final | 9/16/2019 | 9/17/2019 | 9/17/2019 2:24:29 PM | P | PEND |
|
|
John Phone #: ###-####. Insulation under lavs completed. Ok for final when the project related fire alarm permit has finaled.
|
BLD19-00521
| FIRE-Final Inspection | 9/16/2019 | 9/17/2019 | 9/17/2019 2:03:09 PM | P | PASS |
|
|
Josh Phone #: ###-####. All previously noted items have been repaired.
|
BLD19-03222
| FIRE-Final Inspection | 9/11/2019 | 9/17/2019 | 9/17/2019 1:26:09 PM | P | FAIL |
|
|
Shawn Phone #: ###-####. Provide access to the fire riser room to ensure yearly inspection is up to date.
|
BLD19-02960
| BLD-Framing/Rough-in | 9/17/2019 | 9/17/2019 | 9/17/2019 1:09:45 PM | P | PASS |
|
|
ARmando Phone #: ###-####. Interior steel stud framed walls only ok.
|
BLD19-00726
| BLD-Other | 9/16/2019 | 9/17/2019 | 9/17/2019 12:38:40 PM | A | DEFR |
|
|
grout pour at 1:30 // Tom Phone #: ###-####
|
BLD19-00329
| BLD-Final | 9/16/2019 | 9/17/2019 | 9/17/2019 12:36:57 PM | P | FAIL |
|
|
Call ahead 30 // Shane Phone #: ###-####. Fire/life safety failed. Provide single action lever hardware on existing exterior door. Submit plan mod showing new fenced in area and new entry gate. Correction notice issued.
|
BLD18-02281
| BLD-Final | 9/16/2019 | 9/17/2019 | 9/17/2019 12:34:32 PM | P | PASS |
|
|
Call ahead // David Phone #: ###-####. Ok for perm occ.
|
BLD19-01141
| BLD-Footing | 9/13/2019 | 9/17/2019 | 9/17/2019 11:45:04 AM | A | PASS |
|
|
Alex Phone #: ###-####
|
BLD19-00329
| FIRE-Final Inspection | 9/16/2019 | 9/17/2019 | 9/17/2019 11:44:33 AM | A | FAIL |
|
|
Call ahead 30 minutes // Shane Phone #: ###-####. Needs to provide continous monitoring of the smoke detection system and the ventilation system via IPCO SCADA system. Provide and install the dry chem fire extinguisher as shown on plans. Provide single action hardware on existing exterior door. Submit plan mod for new fence and entry gate off Franklin. New entry gate may need to comply with fire dept. access requirements. A correction notice has been issued.
|
BLD18-02281
| FIRE-Final Inspection | 9/16/2019 | 9/17/2019 | 9/17/2019 11:34:26 AM | A | PASS |
|
|
Call ahead // David Phone #: ###-####. All issues have been reolved.
|
MIS19-00305
| BLD-Conference | 9/17/2019 | 9/17/2019 | 9/17/2019 9:57:03 AM | A | DONE |
|
|
Noted demo work going inside of home. Removing sheet rock and repairing water damage. Will also remove plumbing fixtures. Noted to contractor (Conrad) to submit plans and obtain a building permit. Reroof and siding as well.
|
BLD19-02107
| BLD-Other | 9/16/2019 | 9/17/2019 | 9/17/2019 9:21:02 AM | A | PASS |
|
|
Block and Tie // Daniel Phone #: ###-####
|
BLD19-02105
| BLD-Other | 9/16/2019 | 9/17/2019 | 9/17/2019 9:18:00 AM | A | PASS |
|
|
Block and Tie // Daniel Phone #: ###-####
|
BLD19-02103
| BLD-Other | 9/16/2019 | 9/17/2019 | 9/17/2019 9:14:23 AM | A | PASS |
|
|
Block and Tie // Daniel Phone #: ###-####
|
BLD19-02111
| BLD-Other | 9/16/2019 | 9/17/2019 | 9/17/2019 9:14:08 AM | A | PASS |
|
|
Block and Tie // Daniel Phone #: ###-####
|
BLD19-02104
| BLD-Other | 9/16/2019 | 9/17/2019 | 9/17/2019 9:13:47 AM | A | PASS |
|
|
Block and Tie // Daniel Phone #: ###-####
|
BLD19-02108
| BLD-Other | 9/16/2019 | 9/17/2019 | 9/17/2019 9:07:27 AM | A | PASS |
|
|
Block and Tie // Daniel Phone #: ###-####
|
BLD19-02109
| BLD-Other | 9/16/2019 | 9/17/2019 | 9/17/2019 9:07:07 AM | A | PASS |
|
|
Block and Tie // Daniel Phone #: ###-####
|
BLD19-00645
| BLD-Energy code compliance | 9/16/2019 | 9/17/2019 | 9/17/2019 8:58:30 AM | A | FAIL |
|
|
Tyler Phone #: ###-####. Issues on correction notice not resloved.
|
BLD18-02317
| BLD-Final | 9/16/2019 | 9/17/2019 | 9/17/2019 8:14:00 AM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by Kaleb Checketts. Needs electrical final first.
|