Inspections for the day of: Wednesday, September 18, 2019.
Number of inspections: 23
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-04286 BLD-Conference9/18/20199/18/20199/18/2019 4:53:48 PMPDONE
Discuss Firewall Phone #: ###-#### Inspection requested via web by Glen Farrell
BLD18-02407 BLD-Conference9/17/20199/18/20199/18/2019 4:53:26 PMPDONE
Call ahead 20 minutes - foundation poured in wrong spot - need advice // Kimbra Phone #: ###-####
BLD19-01812 BLD-Final9/18/20199/18/20199/18/2019 2:55:31 PMPFAIL
Phone #: ###-#### Inspection requested via web by Scott Asin. Provide ADA comliant hardware on barn doors. Provide ADA compliant sink.Rfelctive surface for Mirror in restroom exceeds the 40" max height above the floor. Correction notice was issued.
MIS19-00308 BLD-Conference9/18/20199/18/20199/18/2019 2:36:34 PMPDONE
email complaining that workers "have blocked off the dirt driveway from the public walkway adjacent to the home, so trucks are no longer driving and parking on the public walkway. But now it''s worse because they are completely blocking the walkway entrance and sidewalk with their trucks backed up, tailgates down, and equipment strewn in front. This walkway is used by elementary school students to walk and bike to and from Pepper Ridge Elementary School."
MIS19-00308 DOC - Permit Finaled9/18/20199/18/20199/18/2019 2:36:26 PMPPASS
Passed along the information to the general contractor of the noted isuues to make him aware of the situation.
BLD18-04369 BLD-Footing9/18/20199/18/20199/18/2019 2:31:10 PMPPART
Call 30 minutes ahead // Jerrod Phone #: ###-####. Perimeter footings, column pad footings, interior footings and elevator and trash enclosure footings. Noted clearance issues in some areas. Special inspection agency to verify clearane issues have been repaired prior to conc. placement. Ok to place concrete pending special inspection.
BLD18-04243 BLD-Footing9/18/20199/18/20199/18/2019 2:30:44 PMPPART
Call 30 minutes ahead // Jerrod Phone #: ###-####. Perimeter footings, column pad footings, interior footings and elevator and trash enclosure footings. Noted clearance issues in some areas. Special inspection agency to verify clearane issues have been repaired prior to conc. placement. Ok to place concrete pending special inspection.
MIS19-00307 DOC - Permit Finaled9/18/20199/18/20199/18/2019 1:41:46 PMPPASS
No permit required. Detached accessory structure does not exceed 200sf.
MIS19-00307 BLD-Conference9/18/20199/18/20199/18/2019 1:40:48 PMPPASS
Possible 10x20 shed being built without permit
BLD19-02626 BLD-Final9/18/20199/18/20199/18/2019 1:26:22 PMPPASS
Please call when on way. Thanks!! Phone #: ###-#### Inspection requested via web by Ashleigh Meligan
BLD19-02626 DOC - Permit Finaled9/18/20199/18/20199/18/2019 1:26:12 PMPPASS
BLD19-02628 BLD-Final9/18/20199/18/20199/18/2019 1:25:53 PMPPASS
Please call when on way. Thanks!! Phone #: ###-#### Inspection requested via web by Ashleigh Meligan
BLD19-02628 DOC - Permit Finaled9/18/20199/18/20199/18/2019 1:25:44 PMPPASS
BLD19-03222 BLD-Final9/11/20199/18/20199/18/2019 12:38:50 PMPPEND
Shawn Phone #: ###-####. Pending life/safety.
BLD19-02010 BLD-Wall Bracing9/17/20199/18/20199/18/2019 11:05:38 AMAFAIL
Carl Phone #: ###-####. Needs to provide a full set of approved plans. Notes say there should be a total of eight pages of construction docs. Omly seven are provided. Wall bracing
BLD19-02007 BLD-Wall Bracing9/17/20199/18/20199/18/2019 11:05:20 AMAFAIL
Carl Phone #: ###-####. Needs to provide a full set of approved plans. Notes say there should be a total of eight pages of construction docs. Omly seven are provided. Wall bracing plans are incomplete, missing schedules. Also noted that 2hr. wall is not continous or constructed per plans.
BLD19-00698 BLD-Other9/16/20199/18/20199/18/2019 10:34:54 AMAFAIL
Wall bracing/sheathing Phone #: ###-#### Inspection requested via web by Rachael Moore. Attach missed areas, provide 6ft. shear panel in garage as noted on plans.
BLD18-04521 BLD-Conference9/17/20199/18/20199/18/2019 10:11:55 AMADONE
Per Mike Jordan, Framing Consultation prior to framing for building 12. Phone #: ###-#### Inspection requested via web by Kris Linnell
BLD18-04519 BLD-Foundation9/17/20199/18/20199/18/2019 10:11:54 AMAPASS
Stem Walls for Building 10. Pour scheduled for 2P.M. Phone #: ###-#### Inspection requested via web by Kris Linnell
BLD19-02263 BLD-Framing/Rough-in9/17/20199/18/20199/18/2019 9:21:46 AMANR
Gari Phone #: ###-####. All framing issues not yet corrected.
BLD19-02263 BLD-Energy code compliance9/17/20199/18/20199/18/2019 9:21:16 AMANR
Gari Phone #: ###-####
BLD19-00521 BLD-Final9/16/20199/18/20199/18/2019 9:11:56 AMAFAIL
Josh Phone #: ###-####. Provide the additional hand rail at north west exit. everything else ok.
BLD19-00733 BLD-Conference9/17/20199/18/20199/18/2019 9:10:33 AMADONE
Kevin Phone #: ###-####