BLD17-04447
| BLD-Concrete | 9/18/2018 | 9/19/2018 | | A | |
|
|
Hey Mike, we are placing a slab on grade tomorrow at 4am, strata will b onsite for rebar and concrete testing. You could look at our slab prep today if you come out for the grout placement Phone #: ###-#### >> Inspection requested via web by Jim Carriveau
|
BLD17-02308
| BLD-Final | 9/24/2018 | 9/25/2018 | 9/25/2018 4:50:40 PM | P | NR |
|
|
Call 20 mins before // Rick Phone #: ###-####
|
BLD17-04447
| BLD-Concrete | 9/25/2018 | 9/25/2018 | 9/25/2018 4:50:26 PM | P | DEFR |
|
|
Hello Mike, we have a structural block grout placement at 2 pm today Phone #: ###-#### Inspection requested via web by Jim Carriveau
|
BLD17-02643
| BLD-Final | 9/21/2018 | 9/25/2018 | 9/25/2018 3:11:35 PM | P | NR |
|
|
Lin Waterman Phone #: ###-####
|
BLD18-02961
| BLD-Final | 9/25/2018 | 9/25/2018 | 9/25/2018 2:17:03 PM | P | PASS |
|
|
Robert Phone #: ###-####. Ok for perm occ.
|
BLD18-02533
| BLD-Framing/Rough-in | 9/25/2018 | 9/25/2018 | 9/25/2018 1:56:18 PM | P | NR |
|
|
Call half hour to meet // Shane Phone #: ###-####. Needs to rough in MEP's and get get inspected first.
|
BLD18-01944
| BLD-Foundation | 9/24/2018 | 9/25/2018 | 9/25/2018 1:48:02 PM | P | DEFR |
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron. Foundation already placed when arrived on site.
|
BLD16-04497
| BLD-Final | 9/25/2018 | 9/25/2018 | 9/25/2018 1:38:58 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown
|
BLD16-04497
| DOC - Permit Finaled | 9/25/2018 | 9/25/2018 | 9/25/2018 1:38:46 PM | P | PASS |
|
|
|
BLD16-04497
| BLD-Blower Door Test Results | 9/25/2018 | 9/25/2018 | 9/25/2018 1:35:59 PM | P | DONE |
|
|
5.3ACH @50pa
|
BLD18-01948
| BLD-Wall cover | 9/25/2018 | 9/25/2018 | 9/25/2018 1:24:03 PM | P | NH |
|
|
Phone #: 2087897191 >> Inspection requested via mobile web by Dalrymple John.. No access.
|
BLD18-03403
| BLD-Final | 9/25/2018 | 9/25/2018 | 9/25/2018 1:23:40 PM | P | DONE |
|
|
Ready for final inspection Phone #: ###-#### Inspection requested via web by Michael La Pointe
|
BLD18-03403
| DOC - Permit Finaled | 9/25/2018 | 9/25/2018 | 9/25/2018 1:23:32 PM | P | PASS |
|
|
All work appeared to be done in accordance with local codes and ordinances.
|
BLD18-02092
| BLD-Wall Bracing | 9/24/2018 | 9/25/2018 | 9/25/2018 10:17:02 AM | A | FAIL |
|
|
Shear // Dillon Phone #: ###-####. Install all missing blocking and nail. Rremove tyvek for wall bracing inspection. Correction notice posted.
|
BLD18-01314
| BLD-Final | 9/24/2018 | 9/25/2018 | 9/25/2018 10:02:55 AM | A | PASS |
|
|
Chad Phone #: ###-####. Ok for temp occ. Will be ok for perm occ. once Mech. signs perm.
|
BLD18-01314
| FIRE-Final Inspection | 9/24/2018 | 9/25/2018 | 9/25/2018 10:02:10 AM | A | PASS |
|
|
Chad Phone #: ###-####
|
BLD18-02678
| BLD-Framing/Rough-in | 9/25/2018 | 9/25/2018 | 9/25/2018 9:40:27 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Dean Borup. Pending electrical rough in inspection.
|
BLD18-01390
| BLD-Footing | 9/24/2018 | 9/25/2018 | 9/25/2018 9:01:27 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Sean Worthington. Mono pour for dumpster enclosure ok.
|
BLD18-02452
| BLD-Final | 9/24/2018 | 9/25/2018 | 9/25/2018 8:47:00 AM | A | DONE |
|
|
Final Phone #: ###-#### Inspection requested via web by Joshua Adams
|
BLD18-02452
| DOC - Permit Finaled | 9/25/2018 | 9/25/2018 | 9/25/2018 8:46:51 AM | P | PASS |
|
|
All work appeared to be done in accordance with local codes and ordiances.
|
BLD17-01332
| BLD-Framing/Rough-in | 9/24/2018 | 9/25/2018 | 9/25/2018 8:46:20 AM | A | PASS |
|
|
Call ten minutes before to meet // Vlad Phone #: ###-####. New patio framing ok. New entry framing ok. Ok to install windows tyvek and roofing.
|