Inspections for the day of: Thursday, September 26, 2019.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-02562 BLD-Framing/Rough-in9/26/20199/26/20199/26/2019 4:24:43 PMPPASS
Call ahead 30 minutes // Omyra Phone #: ###-####
BLD18-01425 BLD-Final9/26/20199/26/20199/26/2019 4:05:54 PMPPASS
James Phone #: ###-####. OK for perm occ.
MIS19-00318 BLD-Conference9/26/20199/26/20199/26/2019 3:36:20 PMPFAIL
Need CO. Change of occupancy no permits. Tenant not on site, doors locked. A correction notice was issued to obtain a building permit for work done. Needs to submit plans to planning for approvals and schedule all required inspections to obtain a cert. of occupancy. A reinspection has been scheduled for Oct 10th. to check on status and issue 5 day notice if needed.
BLD19-03524 BLD-Final9/26/20199/26/20199/26/2019 3:10:59 PMPPASS
Phone #: ###-#### Inspection requested via web by David Dexter
BLD19-03524 DOC - Permit Finaled9/26/20199/26/20199/26/2019 3:10:52 PMPPASS
BLD19-03296 BLD-Final9/24/20199/26/20199/26/2019 3:09:20 PMPDONE
Contact Rob Smith with any questions ###-#### Phone #: ###-#### Inspection requested via web by Rob Maes
BLD19-03296 DOC - Permit Finaled9/26/20199/26/20199/26/2019 3:09:13 PMPPASS
BLD18-03245 BLD-Conference9/25/20199/26/20199/26/2019 3:09:00 PMPDONE
Discuss plumbing penetrations in fire rated walls. if possible could we request a time window to have plumber on site. Phone #: ###-#### Inspection requested via web by Robbie Andrews. OK to insulate 2nd floor at common area only. Provide listings for 3m fire foam for use on pex.
BLD19-03566 BLD-Final9/25/20199/26/20199/26/2019 2:30:06 PMPNR
Allison Phone #: ###-####. No access. doors locked.
BLD18-03662 BLD-Wall cover9/26/20199/26/20199/26/2019 2:13:09 PMPPASS
Daryli Phone #: ###-####
BLD19-03099 BLD-Footing9/26/20199/26/20199/26/2019 1:55:39 PMPPASS
Ryan Phone #: ###-####. Will bulk head portion of footing in back by basement until backfilled.
BLD19-03665 BLD-Framing/Rough-in9/26/20199/26/20199/26/2019 1:32:53 PMPPASS
Steven Phone #: ###-####
BLD18-04288 BLD-Concrete9/26/20199/26/20199/26/2019 12:41:26 PMPCANC
second floor rebar and 6x6 mesh inspection and decking screw inspection Phone #: ###-#### Inspection requested via web by Glen Farrell
BLD18-00578 BLD-Final9/25/20199/26/20199/26/2019 10:58:14 AMPCANC
Code to Enter is 8188. Electrical re-inspection occurs in the morning, Call Chris with any issues or concerns. Phone #: ###-#### >> Inspection requested via web by Chris Laraway Inspection cancelled from web by: Chris Laraway
BLD19-01485 BLD-Framing/Rough-in9/25/20199/26/20199/26/2019 10:02:23 AMAPASS
We had to order long 5’ straps for garage portal frame. Phone #: ###-#### Inspection requested via web by Joel Hirtle. All corrections made. Will inspect portal straps on energy inspection.
BLD19-02660 BLD-Ceiling Grid Inspection9/25/20199/26/20199/26/2019 9:34:09 AMANR
Tony Phone #: ###-####. A mech. permit is required for the new and altered duct work that has been installed.
BLD14-03607 BLD-Final9/24/20199/26/20199/26/2019 9:17:46 AMAPASS
Kevin Phone #: ###-####. Ok for perm occ.
BLD19-03725 BLD-Final9/25/20199/26/20199/26/2019 8:53:19 AMADONE
Joseph Phone #: ###-####
BLD19-03725 DOC - Permit Finaled9/26/20199/26/20199/26/2019 8:52:55 AMPPASS
BLD19-03216 BLD-Final9/25/20199/26/20199/26/2019 8:52:26 AMAPASS
gary Phone #: ###-####
BLD19-03216 DOC - Permit Finaled9/26/20199/26/20199/26/2019 8:52:11 AMPPASS