MIS19-00261
| BLD-Conference | 8/22/2019 | 9/5/2019 | 9/6/2019 11:23:27 AM | A | CANC |
|
|
Check on status..... Moved o monday.
|
BLD19-02263
| BLD-Wall Bracing | 9/4/2019 | 9/5/2019 | 9/5/2019 11:33:38 AM | A | PASS |
|
|
Gari Phone #: ###-####
|
BLD19-02448
| BLD-Wall Bracing | 9/4/2019 | 9/5/2019 | 9/5/2019 10:58:27 AM | A | PASS |
|
|
Dean Phone #: ###-####. Ok to side.
|
BLD19-01779
| BLD-Ceiling Grid Inspection | 9/4/2019 | 9/5/2019 | 9/5/2019 10:48:52 AM | A | PASS |
|
|
Loyd Phone #: ###-####
|
BLD19-01045
| BLD-Framing/Rough-in | 9/4/2019 | 9/5/2019 | 9/5/2019 8:45:08 AM | A | PASS |
|
|
Tony Phone #: ###-####. Interior steel stud framed walls and hardlids ok. Ok to insulate.
|