BLD19-00726
| BLD-Other | 9/5/2019 | 9/6/2019 | 9/6/2019 4:32:14 PM | P | DEFR |
|
|
grout at 2pm // Tom Phone #: ###-####
|
BLD19-03279
| BLD-Final | 9/3/2019 | 9/6/2019 | 9/6/2019 3:59:50 PM | P | NR |
|
|
Call for access- Charlie Phone #: ###-####. fire/life/safety has failed.
|
BLD19-01363
| BLD-Wall Bracing | 9/6/2019 | 9/6/2019 | 9/6/2019 3:05:32 PM | P | PASS |
|
|
KENNY Phone #: ###-####
|
BLD19-01362
| BLD-Wall Bracing | 9/6/2019 | 9/6/2019 | 9/6/2019 3:05:18 PM | P | PASS |
|
|
KENNY Phone #: ###-####
|
BLD19-01361
| BLD-Wall Bracing | 9/6/2019 | 9/6/2019 | 9/6/2019 3:05:07 PM | P | PASS |
|
|
KENNY Phone #: ###-####
|
BLD19-01360
| BLD-Wall Bracing | 9/6/2019 | 9/6/2019 | 9/6/2019 3:04:47 PM | P | PASS |
|
|
KENNY Phone #: ###-####
|
BLD19-01359
| BLD-Wall Bracing | 9/6/2019 | 9/6/2019 | 9/6/2019 3:04:34 PM | P | PASS |
|
|
KENNY Phone #: ###-####
|
BLD19-01355
| BLD-Wall Bracing | 9/6/2019 | 9/6/2019 | 9/6/2019 3:04:21 PM | P | PASS |
|
|
KENNY Phone #: ###-####
|
BLD19-02786
| BLD-Final | 9/5/2019 | 9/6/2019 | 9/6/2019 2:36:48 PM | P | DONE |
|
|
Phone #: ###-#### Inspection requested via web by Michael La Pointe
|
BLD19-02786
| DOC - Permit Finaled | 9/6/2019 | 9/6/2019 | 9/6/2019 2:35:34 PM | P | PASS |
|
|
All work appeared to be done in acordance with local codes and ordinances.
|
BLD19-01498
| BLD-Wall Bracing | 9/6/2019 | 9/6/2019 | 9/6/2019 2:23:38 PM | P | PASS |
|
|
Shan Phone #: ###-####
|
BLD18-03992
| BLD-Final | 9/5/2019 | 9/6/2019 | 9/6/2019 11:35:02 AM | A | NR |
|
|
call for access Geroge Phone #: ###-####. Needs electrical final first.
|
BLD19-00645
| BLD-Framing/Rough-in | 9/5/2019 | 9/6/2019 | 9/6/2019 11:16:24 AM | A | FAIL |
|
|
Kip Phone #: ###-####. Provide truss engineering and attacment details for pigg back trusses on A03 truss. Ok to insulate. Correction notice posted.
|
BLD18-04520
| BLD-Energy code compliance | 9/5/2019 | 9/6/2019 | 9/6/2019 10:56:58 AM | P | CANC |
|
|
Stem wall insulation on North Half of building 11. Phone #: ###-#### >> Inspection requested via web by Kris Linnell Inspection cancelled from web by: Kris Linnell
|
BLD18-04519
| BLD-Footing | 9/5/2019 | 9/6/2019 | 9/6/2019 10:56:56 AM | P | CANC |
|
|
Chris Phone #: ###-#### Inspection cancelled from web by: Kris Linnell
|
BLD19-01233
| BLD-Framing/Rough-in | 9/5/2019 | 9/6/2019 | 9/6/2019 10:43:49 AM | A | PART |
|
|
Early as possible please. Phone #: ###-#### Inspection requested via web by Jimmie Miller. Steel stud framing and box headers for new openings. Needs to install SSC clips from bottom track to each stud. Contractor to fllow up with RFI approving the angle clips in leiu of HUC hangars for box header to jamb conections.
|
BLD19-02563
| BLD-Framing/Rough-in | 9/5/2019 | 9/6/2019 | 9/6/2019 10:14:31 AM | A | PASS |
|
|
Jason Phone #: ###-####. Interior steel stud framed walls ok. Noted that type 1 hood is supported from bottom chord of I joist. Contractor to provide engineering showing I joist can support additional weight from bottom chords or support from top chords.
|
BLD19-03268
| BLD-Final | 9/3/2019 | 9/6/2019 | 9/6/2019 9:58:02 AM | A | DONE |
|
|
ReRoof Inspection requested via web by Elizabeth Melendez
|
BLD19-03268
| DOC - Permit Finaled | 9/6/2019 | 9/6/2019 | 9/6/2019 9:57:54 AM | P | PASS |
|
|
All work appeared to be done in accordance with local codes and ordinances.
|
BLD19-03138
| BLD-Framing/Rough-in | 9/5/2019 | 9/6/2019 | 9/6/2019 9:46:21 AM | A | PASS |
|
|
Sid Phone #: ###-####. Interior steel stud framed walls ok.
|
BLD19-02176
| BLD-Ceiling Grid Inspection | 9/5/2019 | 9/6/2019 | 9/6/2019 9:35:34 AM | A | CANC |
|
|
Anthony Phone #: ###-####
|
BLD19-02176
| BLD-Energy code compliance | 9/6/2019 | 9/6/2019 | 9/6/2019 9:35:27 AM | A | PASS |
|
|
Anthony Phone #: ###-####. Majority of framing issues were resolved. A letter from the engineer of record is required noting that the rear portal frame header is sufficient prior to issuing a cert. of occupancy.
|
BLD19-02176
| BLD-Framing/Rough-in | 9/5/2019 | 9/6/2019 | 9/6/2019 9:33:09 AM | A | PASS |
|
|
Anthony Phone #: ###-####
|
BLD19-02551
| BLD-Final | 9/5/2019 | 9/6/2019 | 9/6/2019 9:25:25 AM | A | DONE |
|
|
Phone #: ###-#### Inspection requested via web by Michael La Pointe
|
BLD19-02551
| DOC - Permit Finaled | 9/6/2019 | 9/6/2019 | 9/6/2019 9:25:16 AM | P | PASS |
|
|
All work appeared to be done in accordance with local codes and ordinances.
|
BLD19-03066
| BLD-Final | 9/5/2019 | 9/6/2019 | 9/6/2019 9:17:38 AM | A | PASS |
|
|
Art Phone #: ###-####
|
BLD19-03066
| DOC - Permit Finaled | 9/6/2019 | 9/6/2019 | 9/6/2019 9:17:29 AM | P | PASS |
|
|
|
BLD19-02889
| BLD-Final | 9/5/2019 | 9/6/2019 | 9/6/2019 8:44:14 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by David Dexter
|
BLD19-02889
| DOC - Permit Finaled | 9/6/2019 | 9/6/2019 | 9/6/2019 8:44:06 AM | P | PASS |
|
|
|
BLD19-01528
| BLD-Final | 9/5/2019 | 9/6/2019 | 9/6/2019 8:33:28 AM | A | PASS |
|
|
Danny Phone #: ###-####
|
BLD19-01528
| DOC - Permit Finaled | 9/6/2019 | 9/6/2019 | 9/6/2019 8:33:20 AM | P | PASS |
|
|
|