BLD18-04530
| FIRE-Final Inspection | 1/22/2019 | 1/22/2019 | 1/22/2019 1:12:58 PM | P | PASS |
|
|
Previously noted items have been corrected, final life fire safety inspection for area of work complete.
Tim Phone #: ###-####
|
FIR19-00006
| INSP-Sprinkler Rough-in | 1/22/2019 | 1/22/2019 | 1/22/2019 12:54:35 PM | P | PASS |
|
|
Tenting inspection complete, overehad fire sprinkler piping approved for cover.
Tenting inspection, please call Alicia before heading out to confirm it is ready. Thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
FIR18-00765
| INSP-Sprinkler Rough-in/Hydro | 1/21/2019 | 1/22/2019 | 1/22/2019 11:14:52 AM | A | DONE |
|
|
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed.
Todd Ketterling is the contact for this over head hydro. Thank you for your help. Have a nice day. Phone #: ###-#### Inspection requested via web by Stan Beus
|
BLD17-04686
| FIRE-Conference | 1/18/2019 | 1/22/2019 | 1/22/2019 11:14:13 AM | A | DONE |
|
|
Fire conference complete.
Tyler Phone #: ###-####
|
FIR18-00673
| INSP-Sprinkler Rough-in | 1/18/2019 | 1/22/2019 | 1/22/2019 10:33:32 AM | A | PART |
|
|
Rough to cover inspection for east side area B complete, area inspected approved for cover.
Cover inspection. Contact Nick Smith with time. Thanks! Phone #: ###-#### Inspection requested via web by Shane Lesteberg
|
BLD18-00887
| FIRE-Final Inspection | 1/22/2019 | 1/22/2019 | 1/22/2019 9:39:05 AM | A | FAIL |
|
|
Fire alarm inspection failed, FIR permits for fire sprinkler and fire alarm needs to be finaled before life fire safety can be completed. Provide exit discharge emergency lighting as discussed.
requesting Fire, life, Safety Inspection in conjunction with Alarm testing as scheduled separately by Webster Fire Protection, ; sprinkler inspection by Larson Fire Sprinkler. Best access usually off the alley. Thank you. Gary 208- 996- 9276 Phone #: ###-#### Inspection requested via web by Gary Band
|
FIR18-00717
| INSP-Final Inspection | 1/21/2019 | 1/22/2019 | 1/22/2019 9:37:23 AM | A | FAIL |
|
|
Provide notification in areas as discussed. Pressure switch on dry system needs to be connected to FDC bell. Lower device in chapel area that is too high.
Plans will need to be resubmitted for areas that needs devices added and for areas where work was completed.
###-#### Ken Webster Phone #: ###-#### Inspection requested via web by Ken Webster
|
FIR18-00874
| INSP-Final Inspection | 1/18/2019 | 1/22/2019 | 1/22/2019 8:33:51 AM | A | PASS |
|
|
Final fire sprinkler inspection for area of work complete.
Please call Randy with time frame. Phone #: ###-#### Inspection requested via web by Jeff Packham
|