Inspections for the day of: Tuesday, January 29, 2019.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR18-00610 INSP-Sprinkler Rough-in1/29/20191/29/20191/29/2019 4:49:42 PMPPART
Overhead fire sprinkler piping located above hardlids in level 2 restrooms and level 1 entry hardlids complete, areas inspected approved for cover.

Second floor restrooms rough to cover // Mike Phone #: ###-####
FIR19-00051 INSP-Final Inspection1/29/20191/29/20191/29/2019 2:45:43 PMPPASS
Final communicator inspection complete.

Phone #: ###-#### Inspection requested via web by John Siewert
FIR18-00790 INSP-Final Inspection1/29/20191/29/20191/29/2019 2:45:15 PMPPASS
Final hood suppression inspection complete.

Phone #: 2089546009 >> Inspection requested via mobile web by Kenny Leslie
BLD19-00227 FIRE-Final Inspection1/28/20191/29/20191/29/2019 1:21:28 PMPFAIL
Provide sugnage on main entry reading door to remain unlocked while building is occupied. Slide bolt locks on rear door need to be removed to be code compliant.

Dana or Amanda Phone #: ###-####
FIR18-00673 INSP-Sprinkler Rough-in/Hydro1/29/20191/29/20191/29/2019 12:12:16 PMAFAIL
Hydrostatic test for wet system lost 4 psi during test, te-hydro is required.

FIR18-00847 INSP-Final Inspection1/29/20191/29/20191/29/2019 12:10:08 PMPPASS
Final fire sprinkler inspection for area of work complete.

We would like to perform this inspection in coordination with fire life safety for BLD. Please call Rick with Questions. Phone #: ###-#### Inspection requested via web by Jeff Packham
BLD18-03237 FIRE-Final Inspection1/28/20191/29/20191/29/2019 11:27:59 AMAFAIL
Access control door to the right of the main entry when entering space appears to not be connected to the fire alarm panel, access control needs to de-energize during general fire alarm.

Garret Phone #: ###-####
FIR18-00510 INSP-Sprinkler Rough-in/Hydro1/28/20191/29/20191/29/2019 11:23:23 AMAPART
Rough to cover inspection for levels 2 and 3 complete, approved for cover.

Third floor hydro. Phone #: ###-#### Inspection requested via web by Sam Ball
FIR18-00673 INSP-Sprinkler Rough-in/Hydro1/26/20191/29/20191/29/2019 10:38:18 AMAPART
24 hour ait test started at 10AM with 40 psi on all three dry systems.

Phone #: ###-#### Inspection requested via web by Shane Lesteberg
FIR18-00827 INSP-Sprinkler Rough-in1/24/20191/29/20191/29/2019 10:15:25 AMAFAIL
Point of contact could not be reached.

Gerarrdo is the contact. Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00544 INSP-Supply line flush1/24/20191/29/20191/29/2019 10:15:04 AMAFAIL
Point of contact could not be reached.

Gerarrdo is the contact. Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00545 INSP-Supply line flush1/24/20191/29/20191/29/2019 10:14:37 AMAFAIL
Point of contact could not be reached.

Gerarrdo is the contact. Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00519 INSP-Supply line flush1/24/20191/29/20191/29/2019 10:14:11 AMAFAIL
Point of contact could not be reached.

Gerarrdo is the contact. Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00562 INSP-Supply line flush1/24/20191/29/20191/29/2019 10:13:48 AMAFAIL
Point of contact could not be reached.

Gerarrdo is the contact Phone #: ###-#### Inspection requested via web by Stan Beus
BLD18-03965 FIRE-Final Inspection1/29/20191/29/20191/29/2019 10:12:51 AMAPASS
Previously oted items have been corrected, final life fire safety inspection for area of work.
FIR17-00508 INSP-Alarm Testing1/28/20191/29/20191/29/2019 10:12:10 AMAFAIL
Address numbers on tampers do not match city approved drawings. Trouble with remote mic, need to resolve issues. As-builts need to be sent to fire alarm plan reviewer.

TCO for area A Phone #: ###-#### Inspection requested via web by Shane Lesteberg
FIR17-00474 INSP-Final Inspection1/28/20191/29/20191/29/2019 10:12:09 AMAPART
Fire sprinkler inspection for TCO phase 1 complete.

Contact is Mark Jensen.
Thank you for your help! Phone #: ###-#### Inspection requested via web by Stan Beus
FIR19-00018 INSP-Sprinkler Rough-in1/28/20191/29/20191/29/2019 8:20:21 AMAFAIL
All tenting not installed at time of inspection.

Tenting Phone #: ###-#### Inspection requested via web by Anthony Minichiello
FIR19-00010 INSP-Final Inspection1/25/20191/29/20191/29/2019 8:07:02 AMAFAIL
Appliance under hood did not de-energize when hood system activated, per code all energy sources need to be isolated under the hood during system activation.

Coordinated with Jim Page, to do inspection at 8 am! Thanks!
-Zach w/ Firexpert. Phone #: ###-#### Inspection requested via web by Don Kartchner