Inspections for the day of: Tuesday, January 8, 2019.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR18-00750 INSP-Final Inspection1/8/20191/8/20191/8/2019 3:22:58 PMPPASS
Troubles on fire alarm panel have been repaired/cleared, final fire alarm inspection complete.
FIR18-00777 INSP-Final Inspection1/4/20191/8/20191/8/2019 3:14:19 PMPPASS
Final fire alarm inspection for scope of work complete.

Phone #: ###-#### Inspection requested via web by Jessia Maxwell
FIR18-00718 INSP-Final Inspection1/4/20191/8/20191/8/2019 3:13:35 PMPFAIL
Flow switches on levels 1 and 2 go instantly to alarm with water flow, flow switches will need to be replaced. Basement level flow switch would not trip with a consistant time, recommend replacement of switch for basement level. PIV took 12 turns to report to panel, needs to be 2 1/2 turns or less.

Please call chris ford Phone #: ###-#### Inspection requested via web by Jessia Maxwell
FIR18-00942 INSP-Sprinkler Rough-in/Hydro1/8/20191/8/20191/8/2019 3:10:26 PMPDONE
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed at city static pressure.
FIR18-00942 INSP-Sprinkler Rough-in/Hydro1/7/20191/8/20191/8/2019 3:08:22 PMAPART
Rough in inspection for overhead fire sprinkler piping complete, areas between conditioned spaces approved for cover, tenting to be installed on attic piping at a later date, areas requiring tenting not approved for cover.

Please call Anthony before heading out, thank you! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
FIR18-00687 INSP-Final Inspection1/8/20191/8/20191/8/2019 2:37:30 PMPCANC
Please call ahead Phone #: ###-#### >> Inspection requested via web by Gary Gambino Inspection cancelled from web by: Gary Gambino
FIR18-00834 INSP-Sprinkler Rough-in1/8/20191/8/20191/8/2019 12:05:50 PMPPART
Rough to cover ins[pection for IBR complete, IBR approved for cover, remaining underground supply to be installed at a later date.

Bryan Collins is the contact for this underground RTC inspection. Thank you for your help. Have a nice day. Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00725 INSP-Sprinkler Rough-in1/7/20191/8/20191/8/2019 11:52:58 AMAPASS
Rough to cover inspection for overehad fire sprinkler piping in area of work complete, approved for cover.

Please call Randy if there are any questions. Thanks. Phone #: ###-#### Inspection requested via web by Jeff Packham
FIR18-00491 INSP-Final Inspection1/7/20191/8/20191/8/2019 11:52:17 AMAPASS
Final fire sprinkler inspection complete.

Call Anthony before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
FIR18-00731 INSP-Final Inspection1/7/20191/8/20191/8/2019 11:51:45 AMAPASS
Final fire sprinkler inspection complete.

Call Anthony when heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
FIR17-00474 INSP-Supply line flush1/7/20191/8/20191/8/2019 11:48:27 AMADONE
Underground main line flush complete.

Jeff Chaney is the contact. Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00021 INSP-Sprinkler Rough-in/Hydro1/7/20191/8/20191/8/2019 9:33:58 AMACANC
Cancelled per conversation woith point of contact.

200lb hydro. George is the contact. Phone #: ###-#### Inspection requested via web by Stan Beus
BLD18-04530 FIRE-Final Inspection1/7/20191/8/20191/8/2019 9:01:08 AMAFAIL
Provide exit signs as shown on city approved drawings. Fire extinguisher on east side of building needs to be inspected and tagged, last inspection was 2011. Provide sticker on main entry reading "Door to remain unlocked while building is occupied". Designated exit on the east side of tenant space is blocked by golf cart, designated exits need to be clear for egress.

Tim Phone #: ###-####
FIR18-00021 INSP-Sprinkler Rough-in1/7/20191/8/20191/8/2019 8:41:18 AMAPASS
Rough to cover inspection for overhead fire sprinkler piping complete, approved for cover.

overhead RTC. Phone #: ###-#### Inspection requested via web by Stan Beus
BLD18-04124 FIRE-Final Inspection1/7/20191/8/20191/8/2019 8:15:38 AMACANC
Area of work not ready for life fire safety inspection, treated this as a conference, fire alarm modifications will be required.

Antonio Phone #: ###-####
FIR19-00002 INSP-Final Inspection1/8/20191/8/20191/8/2019 7:33:18 AMAPASS
Final fire sprinkler inspection for area of work complete.

BLD18-01906 FIRE-Final Inspection1/8/20191/8/20191/8/2019 7:31:43 AMAPASS
Troubles on fire panel have been repaired, final life fire safety inspection complete.

Phone #: ###-#### Inspection requested via web by Jason Ginn
FIR18-00723 INSP-Final Inspection1/3/20191/8/20191/8/2019 7:30:57 AMAPASS
Previously noted items have been repaired, final fire alarm inspection complete.

7am inspection coordinated with Jim Paige Phone #: ###-#### Inspection requested via web by Shane Lesteberg
BLD17-01000 FIRE-Conference1/3/20191/8/20191/8/2019 12:00:00 AMADONE
Temp C of O request- See Ron Hill to schedule plan Request 10 AM with all inspectors if possible - Bruce Phone #: ###-####