FIR18-00159
| INSP-Sprinkler Rough-in/Hydro | 10/1/2018 | 10/1/2018 | 10/1/2018 2:05:02 PM | P | CANC |
|
|
Hydrostatic test cancelled per point of contact, inspection request will be scheduled for a later date.
Hydro of full building. Leon Taylor is point of contact. Phone #: ###-#### Inspection requested via web by Randy Knutson
|
FIR18-00610
| INSP-Conference | 10/1/2018 | 10/1/2018 | 10/1/2018 2:04:09 PM | P | DONE |
|
|
Fire conference complete, soil was re-sampled and designated as Class B soil, sway bracing is not required with Class B soil. Contractor will submit plan mod for sway bracing being deleted.
MIke Phone #: ###-####
|
FIR18-00647
| INSP-Final Inspection | 9/28/2018 | 10/1/2018 | 10/1/2018 1:20:07 PM | P | PASS |
|
|
Rough gto cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover.
Phone #: ###-#### Inspection requested via web by Stan Beus
|
BLD17-03872
| FIRE-Final Inspection | 9/28/2018 | 10/1/2018 | 10/1/2018 12:58:54 PM | A | FAIL |
|
|
Fire hydrants are bagged over by SUEZ due to payment issue, issue needs to be resolved before life fire safety inspection can be passed.
Tim Phone #: ###-####
|
FIR18-00402
| INSP-Sprinkler Rough-in | 9/28/2018 | 10/1/2018 | 10/1/2018 10:29:55 AM | A | PASS |
|
|
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover.
Phone #: ###-#### Inspection requested via web by Sam Ball
|
FIR18-00751
| INSP-Sprinkler Rough-in | 10/1/2018 | 10/1/2018 | 10/1/2018 10:16:41 AM | P | PASS |
|
|
Rough to cover inspection for area of work complete, approved for cover.
Contact Scott Powada ###-#### 30 min prior to RTC Insp Start pelase
Thanks Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
FIR17-00395
| INSP-Final Inspection | 9/28/2018 | 10/1/2018 | 10/1/2018 9:39:56 AM | A | PASS |
|
|
Final fire alarm inspection for scope of work complete.
Please call 1/2 hour before arriving. Thanks Phone #: ###-#### Inspection requested via web by david davis
|
FIR18-00428
| INSP-Sprinkler Rough-in | 9/28/2018 | 10/1/2018 | 10/1/2018 9:03:12 AM | A | PART |
|
|
Partial rough to cover inspection for overhead fire sprinkler piping located above hardlids on level 3 complete, city approved plans will be notated for areas approved for cover.
12 sprinkler heads on 3rd floor. Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR18-00416
| INSP-Final Inspection | 10/1/2018 | 10/1/2018 | 10/1/2018 9:01:52 AM | A | PASS |
|
|
Final fire alarm inspection complete.
|
FIR18-00416
| INSP-Sprinkler Rough-in/Hydro | 10/1/2018 | 10/1/2018 | 10/1/2018 9:01:30 AM | A | CANC |
|
|
|
FIR18-00674
| INSP-Final Inspection | 10/1/2018 | 10/1/2018 | 10/1/2018 9:00:17 AM | A | PASS |
|
|
Final fire alarm inspection complete.
|
FIR18-00439
| INSP-Final Inspection | 10/1/2018 | 10/1/2018 | 10/1/2018 8:59:48 AM | A | PASS |
|
|
Final fire alarm inspection complete.
|
FIR18-00331
| INSP-Final Inspection | 10/1/2018 | 10/1/2018 | 10/1/2018 8:59:23 AM | A | PASS |
|
|
Final fire alarm inspection complete.
|
FIR17-00722
| INSP-Final Inspection | 10/1/2018 | 10/1/2018 | 10/1/2018 8:58:53 AM | A | PASS |
|
|
Final fire alarm inspection complete.
|