Inspections for the day of: Thursday, October 11, 2018.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR14-00415 FIR-Aging Inspection10/11/201810/11/201810/12/2018 3:33:26 PM PASS
Final inspection was completed by Craig D. Hanson and passed on 6/26/2014, wrong inspection was requested, a Sprinkler Rough-in/Hydro inspection was requested instead of a final.
FIR18-00663 INSP-Final Inspection10/11/201810/11/201810/11/2018 4:41:02 PMPPASS
Final fire sprinkler inspection for area of work complete.

Rick Phone #: ###-####
BLD18-02488 FIRE-Final Inspection10/11/201810/11/201810/11/2018 4:40:21 PMPPASS
Final life fire safety inspection for area of work complete.

Tom Phone #: ###-####
BLD18-02517 FIRE-Final Inspection10/11/201810/11/201810/11/2018 2:29:38 PMPPASS
Fire sprinkler inspection complete, no fire alarm modifications, fire extinguisher is placed with a current inspection tag. Final life fire safety inspection for area of work complete.

Tom Phone #: ###-####
FIR18-00696 INSP-Final Inspection10/11/201810/11/201810/11/2018 2:28:30 PMPPASS
Final fire sprinkler system inspection complete.

We would like to perform this in conjunction with the fire life safety for the BLD. Please call Terry with questions. Phone #: ###-#### Inspection requested via web by Jeff Packham
FIR18-00694 INSP-Final Inspection10/10/201810/11/201810/11/2018 2:01:24 PMPPASS
Final hood fire suppression system inspection complete.

Fire system inspection is in the section of the building labeled 4754. Phone #: ###-#### Inspection requested via web by Don Kartchner
FIR18-00538 INSP-Sprinkler Rough-in10/11/201810/11/201810/11/2018 1:40:15 PMPPASS
Rough to cover inspection for undergorund supply complete.
FIR18-00538 INSP-Supply line flush10/10/201810/11/201810/11/2018 1:37:48 PMADONE
Underground main line flush complete.

undgeround-Ron Phone #: ###-####
FIR18-00021 INSP-Sprinkler Rough-in10/10/201810/11/201810/11/2018 1:00:50 PMPPART
Notated city approved drawings with pink highlighter/red ink hardlids approved for cover.

Hard lid inspection Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00686 INSP-Sprinkler Rough-in10/10/201810/11/201810/11/2018 10:39:07 AMAPART
Partial rough to cover inspection for overhead fire sprinkler piping complete, notated city approved drawings with pink highlighter/red ink areas approved for cover.

Ron Phone #: ###-####
FIR18-00319 INSP-Sprinkler Rough-in/Hydro10/11/201810/11/201810/11/2018 9:15:59 AMAPART
Rough in inspection for overhead fire sprinkler piping complete, sprinkler piping requiring tenting not approved for cover, all other fire sprinkler piping approved for cover.

Please call Anthony before heading out, thank you. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
FIR18-00420 INSP-Sprinkler Rough-in10/10/201810/11/201810/11/2018 8:49:30 AMAPART
Rough in inspection for overhead fire sprinkler piping on basement level complete, cover is not approved at this time.

Basement rough-in. Call Steve V. ###-#### Phone #: ###-#### Inspection requested via web by Sheldon Gray