Inspections for the day of: Tuesday, October 2, 2018.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD17-04451 FIRE-Final Inspection10/2/201810/2/201810/2/2018 2:29:13 PMPPASS
No fire sprinklers, no fire alarms, fire extinguishers are placed with current inspection tags, final life fire safety inspection complete.
FIR18-00159 INSP-Sprinkler Rough-in/Hydro10/1/201810/2/201810/2/2018 2:28:28 PMPPART
Hydrostatic test for overhead fire sprinkler piping on levls 2, 3 and 4 complete, level 1 and standpipes to be tested at a later date.

Phone #: ###-#### Inspection requested via web by Matthew Lewis
FIR18-00598 INSP-Sprinkler Rough-in10/1/201810/2/201810/2/2018 2:25:52 PMPPASS
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover. Fire sprinkler head in west cooler in main kitchen has head to far off of wall, fire sprinkler head in cooler will need to be relocated, will verify reloaction at final inspection.

Tom Phone #: ###-####
BLD18-00032 FIRE-Final Inspection10/2/201810/2/201810/2/2018 2:24:35 PMPPASS
Final life fire safety inspection for scope of work complete.

Dusty Phone #: ###-####
BLD17-03696 FIRE-Final Inspection10/1/201810/2/201810/2/2018 2:02:50 PMPPASS
Plan mod for new floor plan has been provided and approved, final life fire safety inspection for area of work complete.

call half hour before // Shane Phone #: ###-####
FIR18-00679 INSP-Sprinkler Rough-in10/1/201810/2/201810/2/2018 11:44:52 AMPPASS
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover. The fire sprinkler riser room will need to have an exterior door installed to a rated riser room or a wall mount post indicator valve will need to be installed to be code compliant before final inspection.

Rick Phone #: ###-####
FIR18-00731 INSP-Sprinkler Rough-in10/1/201810/2/201810/2/2018 9:33:10 AMAPASS
Tenting inspection complete, cover approved for overhead fire sprinkler piping.

Tenting inspection. Please let Anthony know if there are any issues. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
FIR18-00491 INSP-Sprinkler Rough-in10/1/201810/2/201810/2/2018 9:32:46 AMAPASS
Tenting inspection complete, cover approved for overhead fire sprinkler piping.

Tenting inspection. Please let Anthony know if there are any issues. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
FIR18-00611 INSP-Sprinkler Rough-in10/1/201810/2/201810/2/2018 9:02:09 AMAPART
Rough to cover inspection for overhead fire sprinkler piping above hardlids in area of work complete, hardlids approved for cover.

Aron Foster is the contact for this rough to cover inspection. He is needing the rough to cover in the bathrooms also. Thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus