FIR18-00718
| INSP-Sprinkler Rough-in | 10/25/2018 | 10/25/2018 | 10/25/2018 2:18:17 PM | P | PASS |
|
|
Core and shell fire sprinkler protection rough in inspection complete, overhead fire sprinkler piping above hardlid areas approved for cover.
|
FIR18-00718
| INSP-Sprinkler Rough-in/Hydro | 10/24/2018 | 10/25/2018 | 10/25/2018 1:55:11 PM | P | DONE |
|
|
Hydrostatic test for overhead fire sprinkler piping, remote FDC and undergorund supply complete, no pressure loss observed.
Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|
BLD18-00923
| FIRE-Final Inspection | 10/25/2018 | 10/25/2018 | 10/25/2018 12:18:30 PM | P | FAIL |
|
|
Fire alarm inspection did not pass, FIR permit for associate fire alarm work needs to be completed before life fire safety can be finaled.
Ken Phone #: ###-####
|
FIR18-00159
| INSP-Final Inspection | 10/24/2018 | 10/25/2018 | 10/25/2018 12:14:58 PM | P | CANC |
|
|
Leon Taylor is point of contact. Phone #: ###-#### >> Inspection requested via web by Randy Knutson Inspection cancelled from web by: Randy Knutson
|
FIR18-00655
| INSP-Final Inspection | 10/25/2018 | 10/25/2018 | 10/25/2018 10:32:51 AM | A | PASS |
|
|
Final fire sprinkler inspection for area of work complete.
|
FIR18-00802
| INSP-Final Inspection | 10/24/2018 | 10/25/2018 | 10/25/2018 10:32:02 AM | A | PASS |
|
|
Rough in inspection and final inspection complete for overhead fire sprinkler piping in area of work.
|
FIR18-00774
| INSP-Final Inspection | 10/25/2018 | 10/25/2018 | 10/25/2018 10:18:51 AM | P | FAIL |
|
|
Troubleshoot HVAC unit for shutdown, HVAC unit did not shutdown with un-duct detector activation. Need city approved drawings, drawings provided did not have city stamp, plans did not show hood suppression system monitoring.
Shaine Phone #: ###-####
|
FIR18-00816
| INSP-Final Inspection | 10/24/2018 | 10/25/2018 | 10/25/2018 10:16:15 AM | A | PASS |
|
|
Final hood suppression system inspection complete.
Call Zach Phone #: ###-#### Inspection requested via web by Don Kartchner
|
FIR18-00703
| INSP-Sprinkler Rough-in | 10/24/2018 | 10/25/2018 | 10/25/2018 8:45:25 AM | A | PASS |
|
|
All tenting in place at time of inspection, rough to cover inspection for overhead fire sprinkler piping complete, all piping approved for cover.
John Phone #: ###-####
|
FIR18-00718
| INSP-Final Inspection | 10/23/2018 | 10/25/2018 | 10/23/2018 9:04:24 PM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Jessia Maxwell Inspection cancelled from web by: Jessia Maxwell
|