Inspections for the day of: Thursday, October 3, 2019.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR19-00614 INSP-Sprinkler Rough-in10/3/201910/3/201910/3/2019 4:08:17 PMPPASS
Rough to cover inspection for underground supply complete, approved for cover.

Contact Tanner Loomis ###-#### 30 min prior UG RTC Insp start please.

Thank YOU, Phone #: ###-#### Inspection requested via web by Teri Cruickshank
BLD17-03345 FIRE-Final Inspection10/3/201910/3/201910/3/2019 3:51:31 PMPPASS
Previously noted items have been corrected, fire sprinkler ispection is complete, fire aalrm inspection is complete, heat trace ispection is complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection is complete.

Call jesse please Phone #: ###-#### Inspection requested via web by Ami Ostrow
FIR18-00778 INSP-Final Inspection10/3/201910/3/201910/3/2019 3:50:30 PMPPART
Fire pump commissioning witnessed/complete.

Pump run Phone #: ###-#### Inspection requested via web by Sam Ball
BLD19-02223 FIRE-Conference10/2/201910/3/201910/3/2019 3:50:01 PMADONE

Fire conference is complete, discussed life safety items for a future TCO for training, will need a follow up conference before requested TCO date to look over items required.

please call me 1/2 hour before meeting. Phone #: ###-#### Inspection requested via web by Greg Hedin
FIR19-00331 INSP-Final Inspection10/1/201910/3/201910/3/2019 12:03:12 PMAPASS
Final fire sprinkler ispection for area of work complete.

Rick Phone #: ###-####
FIR19-00620 INSP-Final Inspection10/2/201910/3/201910/3/2019 11:52:45 AMAPART
Scope of work for this permit has been completed. Need to have documentation provided showing that the in place hood system is listed for the appliances being used, permit will not be finaled until documentation is provided and accepted for appliance application.

Nate-before hours paid on 9/3/19-6:30 AM meet time Phone #: ###-####
FIR18-00634 INSP-Final Inspection10/1/201910/3/201910/3/2019 11:50:03 AMAPASS
Final fire aalrm inspection for area of work complete.

Please call 1/2 hour before arriving. Thanks Phone #: ###-#### Inspection requested via web by david davis
FIR19-00509 INSP-Final Inspection10/3/201910/3/201910/3/2019 9:36:01 AMAFAIL
Fire sprinkler head on riser has been painted, head needs replaced. Irrigation shutdown is not hooked up to flow switch, irrigation did not shut down on flow switch activation.

Phone #: ###-#### Inspection requested via web by Jonathan LaFond
FIR19-00739 INSP-Final Inspection10/2/201910/3/201910/3/2019 9:13:13 AMAPASS
Final fire sprinkler inspection for area of work complete.

Jeff Phone #: ###-####
FIR19-00739 INSP-Sprinkler Rough-in10/2/201910/3/201910/3/2019 9:12:47 AMAPASS
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover.

Jeff Phone #: ###-####
FIR19-00609 INSP-Final Inspection10/2/201910/3/201910/2/2019 2:26:00 PMACANC
Contact is Dirk. Client requests a 7AM test time. Phone #: ###-#### >> Inspection requested via web by Morgan Ahten Inspection cancelled from web by: Morgan Ahten