FIR18-00301
| INSP-Final Inspection | 10/29/2018 | 10/31/2018 | 11/1/2018 7:45:34 AM | P | FAIL |
|
|
Provide heads under elevated grated platforms that are missing in areas discussed. Provide head gaurds with baffle in areas that are missing. Correct over spaced heads in areas discussed. Provide heads under boilers and chillers as discussed or provide documentation that is approved by the fire code official allowing the coverage to be deleted. Re-install fire sprinklers under elevated obstructions that was removed for obstruction repair. Re-pipe fire sprinkler heads that are blocked by overehead pipe bracing that obscures spray pattern development. Provide fire sprinkler coverage under obstructions next to roll up doors that exceeds the 48inch measurement.
Submit as-builts to Fire sprinkler Plan Reviewer Tim Frost showing all additions of fire sprinklers and the removal of sway bracing due to Type B soil. Provide fire sprinklers onder combined obstructions in areas as discussed. Verify with general contractor to discuss any other punch list items associated with the walkthorugh from this inspection.
1:00 PM inspection would be preferred. Phone #: ###-#### Inspection requested via web by Chris Gregory
|
FIR18-00300
| INSP-Final Inspection | 10/29/2018 | 10/31/2018 | 11/1/2018 7:45:08 AM | P | FAIL |
|
|
Provide heads under elevated grated platforms that are missing in areas discussed. Provide head gaurds with baffle in areas that are missing. Correct over spaced heads in areas discussed. Provide heads under boilers and chillers as discussed or provide documentation that is approved by the fire code official allowing the coverage to be deleted. Re-install fire sprinklers under elevated obstructions that was removed for obstruction repair. Re-pipe fire sprinkler heads that are blocked by overehead pipe bracing that obscures spray pattern development. Provide fire sprinkler coverage under obstructions next to roll up doors that exceeds the 48inch measurement.
Submit as-builts to Fire sprinkler Plan Reviewer Tim Frost showing all additions of fire sprinklers and the removal of sway bracing due to Type B soil. Provide fire sprinklers onder combined obstructions in areas as discussed. Verify with general contractor to discuss any other punch list items associated with the walkthorugh from this inspection.
1:00 pm Inspection would be preferred. Phone #: ###-#### Inspection requested via web by Chris Gregory
|
FIR18-00708
| INSP-Sprinkler Rough-in | 10/30/2018 | 10/31/2018 | 10/31/2018 3:55:34 PM | P | DONE |
|
|
Consultation complete.
Consultation Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR18-00489
| INSP-Final Inspection | 10/31/2018 | 10/31/2018 | 10/31/2018 12:27:48 PM | P | FAIL |
|
|
Irrigation timer for sprinklers not installed, could not test irrigation shut down with flow switch activation.
Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
FIR18-00486
| INSP-Final Inspection | 10/31/2018 | 10/31/2018 | 10/31/2018 12:26:42 PM | P | FAIL |
|
|
Flow switch did not activate on water flow, paddle for water flow has something resticting full travel. Provide calculation sticker at riser.
Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
FIR18-00267
| INSP-Sprinkler Rough-in | 10/31/2018 | 10/31/2018 | 10/31/2018 11:52:33 AM | P | PART |
|
|
Partial rough to cover inspection for overhead fire sprinkler piping above hardlid on 1st lower parking level complete, overhead fire sprinkler piping at base of ramp on 1st lower level approved for cover.
of Justin Phone #: ###-####
|
FIR18-00480
| INSP-Sprinkler Rough-in | 10/30/2018 | 10/31/2018 | 10/31/2018 11:24:47 AM | P | CANC |
|
|
Inspection request cancelled per conversation with point of contact.
Don Phone #: ###-####
|
BLD18-03944
| FIRE-Final Inspection | 10/30/2018 | 10/31/2018 | 10/31/2018 11:22:02 AM | A | PASS |
|
|
No fire sprinkler modifications, no fire alarm modifications, fire extinguisher will be placed in discussed location. Final life fire safety inspection for area of work complete.
Call ahead Izze Phone #: ###-####
|
FIR18-00574
| INSP-Final Inspection | 10/30/2018 | 10/31/2018 | 10/31/2018 11:21:05 AM | A | PASS |
|
|
Final fire alarm inspection for scope of work complete.
Elevator Inspection is at 8am Chris from All Power Electric will be on site to start. Matt Casey will be onsite 830-845am Phone #: ###-#### Inspection requested via web by Matt Casey
|
FIR18-00159
| INSP-Final Inspection | 10/30/2018 | 10/31/2018 | 10/31/2018 11:20:24 AM | A | PASS |
|
|
Final fire sprinkler inspection complete.
Phone #: ###-#### Inspection requested via web by jeremiah robison
|
FIR18-00745
| INSP-Final Inspection | 10/30/2018 | 10/31/2018 | 10/30/2018 2:51:21 PM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|