Inspections for the day of: Wednesday, October 31, 2018.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR18-00301 INSP-Final Inspection10/29/201810/31/201811/1/2018 7:45:34 AMPFAIL
Provide heads under elevated grated platforms that are missing in areas discussed. Provide head gaurds with baffle in areas that are missing. Correct over spaced heads in areas discussed. Provide heads under boilers and chillers as discussed or provide documentation that is approved by the fire code official allowing the coverage to be deleted. Re-install fire sprinklers under elevated obstructions that was removed for obstruction repair. Re-pipe fire sprinkler heads that are blocked by overehead pipe bracing that obscures spray pattern development. Provide fire sprinkler coverage under obstructions next to roll up doors that exceeds the 48inch measurement.

Submit as-builts to Fire sprinkler Plan Reviewer Tim Frost showing all additions of fire sprinklers and the removal of sway bracing due to Type B soil. Provide fire sprinklers onder combined obstructions in areas as discussed. Verify with general contractor to discuss any other punch list items associated with the walkthorugh from this inspection.

1:00 PM inspection would be preferred. Phone #: ###-#### Inspection requested via web by Chris Gregory
FIR18-00300 INSP-Final Inspection10/29/201810/31/201811/1/2018 7:45:08 AMPFAIL
Provide heads under elevated grated platforms that are missing in areas discussed. Provide head gaurds with baffle in areas that are missing. Correct over spaced heads in areas discussed. Provide heads under boilers and chillers as discussed or provide documentation that is approved by the fire code official allowing the coverage to be deleted. Re-install fire sprinklers under elevated obstructions that was removed for obstruction repair. Re-pipe fire sprinkler heads that are blocked by overehead pipe bracing that obscures spray pattern development. Provide fire sprinkler coverage under obstructions next to roll up doors that exceeds the 48inch measurement.

Submit as-builts to Fire sprinkler Plan Reviewer Tim Frost showing all additions of fire sprinklers and the removal of sway bracing due to Type B soil. Provide fire sprinklers onder combined obstructions in areas as discussed. Verify with general contractor to discuss any other punch list items associated with the walkthorugh from this inspection.

1:00 pm Inspection would be preferred. Phone #: ###-#### Inspection requested via web by Chris Gregory
FIR18-00708 INSP-Sprinkler Rough-in10/30/201810/31/201810/31/2018 3:55:34 PMPDONE
Consultation complete.

Consultation Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00489 INSP-Final Inspection10/31/201810/31/201810/31/2018 12:27:48 PMPFAIL
Irrigation timer for sprinklers not installed, could not test irrigation shut down with flow switch activation.

Phone #: ###-#### Inspection requested via web by Anthony Minichiello
FIR18-00486 INSP-Final Inspection10/31/201810/31/201810/31/2018 12:26:42 PMPFAIL
Flow switch did not activate on water flow, paddle for water flow has something resticting full travel. Provide calculation sticker at riser.

Phone #: ###-#### Inspection requested via web by Anthony Minichiello
FIR18-00267 INSP-Sprinkler Rough-in10/31/201810/31/201810/31/2018 11:52:33 AMPPART
Partial rough to cover inspection for overhead fire sprinkler piping above hardlid on 1st lower parking level complete, overhead fire sprinkler piping at base of ramp on 1st lower level approved for cover.

of Justin Phone #: ###-####
FIR18-00480 INSP-Sprinkler Rough-in10/30/201810/31/201810/31/2018 11:24:47 AMPCANC
Inspection request cancelled per conversation with point of contact.

Don Phone #: ###-####
BLD18-03944 FIRE-Final Inspection10/30/201810/31/201810/31/2018 11:22:02 AMAPASS
No fire sprinkler modifications, no fire alarm modifications, fire extinguisher will be placed in discussed location. Final life fire safety inspection for area of work complete.

Call ahead Izze Phone #: ###-####
FIR18-00574 INSP-Final Inspection10/30/201810/31/201810/31/2018 11:21:05 AMAPASS
Final fire alarm inspection for scope of work complete.

Elevator Inspection is at 8am Chris from All Power Electric will be on site to start. Matt Casey will be onsite 830-845am Phone #: ###-#### Inspection requested via web by Matt Casey
FIR18-00159 INSP-Final Inspection10/30/201810/31/201810/31/2018 11:20:24 AMAPASS
Final fire sprinkler inspection complete.

Phone #: ###-#### Inspection requested via web by jeremiah robison
FIR18-00745 INSP-Final Inspection10/30/201810/31/201810/30/2018 2:51:21 PMACANC
Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball