Inspections for the day of: Wednesday, November 27, 2019.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-01930 FIRE-Final Inspection11/26/201911/27/201911/27/2019 1:39:41 PMPCANC
As noted in permit details, no life fire safety signature required for this project, this request is cancelled.

chris Phone #: ###-####
BLD19-03353 FIRE-Final Inspection11/27/201911/27/201911/27/2019 1:38:44 PMPPASS
Final life fire safety inspection for scope of work complete, as-builts will be submitted showing solar panel reconfiguration, spacing requirements still met per building permit fire code review comments.

Can meet on site, please call with as much notice as possible. Thanks Phone #: ###-#### Inspection requested via web by Alex McKinley
BLD18-01491 FIRE-Final Inspection11/26/201911/27/201911/27/2019 1:11:55 PMAPASS
Fire sprinkler inspection is complete, fire aalrm inspection is complete, fire extinguishers are placed with current inspection tags, knox box is located by the FDC. Final life fire safety inspection for area of work complete, signature card was destroyed, no signatures provided.

Please call when on route. Thank you Phone #: ###-#### Inspection requested via web by Mark Roberts
FIR19-00111 INSP-Final Inspection11/26/201911/27/201911/27/2019 1:10:24 PMPPASS
Previously noted items have been corrected, final fire sprinkler inspection is complete.

Contact Ken Orahood ###-#### 30 min prior to Final Insp start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
FIR18-00858 INSP-Final Inspection11/25/201911/27/201911/27/2019 10:57:08 AMAPART
Walk through complete for penthouse and level 9, notated city approved plans with red ink for corrections, level 9 has a room that is a telephone room, not a telecom room, provide notification in telephone room. Conference room on level 9 is in a different location tahn the drawings, A/V device is overspaced due to wall location. Will verify correction on a future inspection.

Call prior to going Phone #: 2086810381 >> Inspection requested via mobile web by Doug Lessa
BLD18-03243 FIRE-Final Inspection11/27/201911/27/201911/27/2019 9:22:20 AMAPASS
Previously noted items have been corrected, final life fire safety inspection is complete, signature card not available at time of inspection.

Phone #: ###-#### Inspection requested via web by Scott Simons
FIR19-00601 INSP-Sprinkler Rough-in11/25/201911/27/201911/27/2019 8:39:17 AMAPART
Previously noted items have been corrected, rough in inspection complete, no tenting installed at time of inspection, cover is not approved until tenting is installed, inspected and approved.

Please call before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
BLD19-03741 FIRE-Final Inspection11/26/201911/27/201911/27/2019 8:13:19 AMAPASS
No fire sprinkler modifications, no fire alarm modifications, fire extinguisher is placed with a current inspection tag. Final life fire safety inspection for area complete, signatures provided on permit sign off card for associated trades.

Matt Phone #: ###-####
BLD19-03743 FIRE-Final Inspection11/26/201911/27/201911/27/2019 8:13:01 AMAPASS
No fire sprinkler modifications, no fire alarm modifications, fire extinguisher is placed with a current inspection tag. Final life fire safety inspection for area complete, signatures provided on permit sign off card for associated trades.

Matt Phone #: ###-####
BLD19-03744 FIRE-Final Inspection11/26/201911/27/201911/27/2019 8:09:45 AMAPASS
No fire sprinkler modifications, fire alarm inspection for area of work is complete (FIR19-00784, not attached in project related cases), fire extinguishers are placed with current inspection tags. Final life fire safety inspection complete, signatures provided on permit sign off card.

Matt Phone #: ###-####
FIR19-00728 INSP-Final Inspection11/27/201911/27/201911/27/2019 7:47:25 AMAPASS
Final fire sprinkler inspection for area of work is complete, all escutcheon in place at time of inspection.
FIR19-00728 INSP-Sprinkler Rough-in/Hydro11/26/201911/27/201911/27/2019 7:46:35 AMAPASS
Rough to cover inspection for remaining areas of work complete, approved for cover.

Cooridinated for 0815 per conversation with point of contact, Approved plans are on site, please contact Chris Felty before heading to job site at Phone #: ###-#### Inspection requested via web by Matt Barnard
BLD19-02171 FIRE-Final Inspection11/26/201911/27/201911/27/2019 7:16:57 AMAPASS
Fire sprinkler inspection is complete, fire alarm inspection is complete, fore extinguisher is placed with a current inspection tag. Final life fire safety inspection for area of work is complete, signatures provided on permit sign off card for associated trades.

Please call 30 minutes in advance Phone #: ###-#### Inspection requested via web by Chase Cheverton
FIR19-00635 INSP-Final Inspection11/25/201911/27/201911/27/2019 7:15:38 AMAPASS
Final fire sprinkler inspection for area of work complete.

Needs to be done at 7:00am Phone #: ###-#### Inspection requested via web by Sam Ball
FIR19-00636 INSP-Final Inspection11/25/201911/27/201911/27/2019 7:14:55 AMAPASS
Final fire alarm inspection for area of work complete.

Needs to be done at 7:00am Phone #: ###-#### Inspection requested via web by Sam Ball