FIR18-00158
| INSP-Final Inspection | 11/5/2018 | 11/8/2018 | 11/8/2018 3:56:56 PM | P | PASS |
|
|
Final inspection for scope of work complete.
PREFER 3:30 OR LATER Phone #: ###-#### Inspection requested via web by Bill Harmon
|
BLD16-02008
| FIRE-Conference | 11/8/2018 | 11/8/2018 | 11/8/2018 3:02:01 PM | P | DONE |
|
|
Fire conference complete, discussed corrective items before TCO.
Would like to review ESI''s TCO plan in the office. Also would like to walk Level 3,4 and 5 for Pre-Final walk. Please call me before heading to the site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
FIR18-00330
| INSP-Final Inspection | 11/5/2018 | 11/8/2018 | 11/8/2018 2:14:36 PM | P | CANC |
|
|
Inspection request cancelled per conversation with point of contact.
Prefer after 3:30 Phone #: ###-#### Inspection requested via web by Bill Harmon
|
FIR18-00510
| INSP-Sprinkler Rough-in | 11/8/2018 | 11/8/2018 | 11/8/2018 2:12:52 PM | P | PART |
|
|
Rough in inspection for townhome section complete, need to verify what is going to be done in high roof areas, is combustible concealed space going to be filled with non-combustible insulation or is upright protection going to be required. Need to add sprinkler protection in pipe chase or fill with non-combustible insulation.
Phone #: ###-#### Inspection requested via web by Sam Ball
|
FIR18-00854
| INSP-Final Inspection | 11/8/2018 | 11/8/2018 | 11/8/2018 2:10:41 PM | P | PASS |
|
|
Final fire sprinkler inspection for scope of work complete, fire sprinklers have been removed from within fireplace enclosures.
Phone #: ###-#### Inspection requested via web by Sam Ball
|
FIR18-00587
| INSP-Final Inspection | 11/2/2018 | 11/8/2018 | 11/8/2018 1:57:40 PM | P | FAIL |
|
|
Add fire sprinkler head to get proper floor coverage due to added duct. Irrigation timer is not installed, need to test irrigation shutdown with flow switch activation.
Colton Cox is the contact for this final inspection. Thank you for your help. Have a nice day. Phone #: ###-#### Inspection requested via web by Stan Beus
|
BLD18-04084
| FIRE-Final Inspection | 11/8/2018 | 11/8/2018 | 11/8/2018 12:09:23 PM | P | FAIL |
|
|
Attempted to call point of contact 4 times with phone number provided between 11:30 to 12:30, received an immediate message that the person I am trying to call is unavailable, life fire safety inspection will need to be rescheduled.
Catherine Phone #: ###-####
|
FIR18-00587
| INSP-Sprinkler Rough-in/Hydro | 11/8/2018 | 11/8/2018 | 11/8/2018 11:36:38 AM | P | DONE |
|
|
Hydrostatic completed and witnessed with city pressure (system does not have FDC so static pressure for hydro is allowed), no pressure loss observed.
|
BLD18-00969
| FIRE-Final Inspection | 11/7/2018 | 11/8/2018 | 11/8/2018 9:12:48 AM | A | PASS |
|
|
Final life fire safety inspection for area of work complete.
Zack Phone #: ###-####
|
FIR18-00857
| INSP-Final Inspection | 11/8/2018 | 11/8/2018 | 11/8/2018 9:12:21 AM | A | PASS |
|
|
Final fire sprinkler inspection for area of work complete.
|
FIR18-00410
| INSP-Final Inspection | 11/6/2018 | 11/8/2018 | 11/8/2018 8:43:12 AM | A | FAIL |
|
|
Provide audio/visual devices on level 2 corridor that is missing, verify devices are in place on level 3 in same area. Provide notification in "Quite Room" on level 1. Integrate access control to fire panel for door release on general alarm. Stobe in level 3 conference room did not operate. Add notification to cover office area that is part of the common hallway area on levels 2 and 3. All devices in level 1 restrooms that have showers need to be weatherproof type devices, no seperation between showers and restroom area. Submit as-builts and have them ready for next inspection.
Hi Jim, I hope your feeling better. Just in case your not, Troy or Lee said they could do a 7:00 am start inspection Thursday if you cannot. I have made arrangements with Troy ; Lee just in case your still out or cannot do the early start. Let me know Thanks Mike Phone #: ###-#### Inspection requested via web by Neal Timmerman
|