Inspections for the day of: Friday, November 9, 2018.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR18-00261 INSP-Final Inspection11/5/201811/9/201811/9/2018 4:03:15 PMPPASS
Final inspection for scope of work complete.

need after 3:30 Phone #: ###-#### Inspection requested via web by Bill Harmon
BLD16-02008 FIRE-Conference11/9/201811/9/201811/9/2018 2:42:00 PMPPASS
Fire conference complete.

Scheduled meeting at 1PM for TCO plan
BLD18-03529 FIRE-Final Inspection11/9/201811/9/201811/9/2018 11:55:36 AMPPASS
No fire sprinkler modifications, no fire alarm modifications, fire extinguishers are placed with current inspection tags, as noted kitchen is to not be used per this occupancy. Final life fire safety inspection for area of work complete.

Larry Phone #: ###-####
BLD18-03453 FIRE-Final Inspection11/9/201811/9/201811/9/2018 11:55:13 AMPPASS
No fire sprinkler modifications, no fire alarm modifications, fire extinguishers are placed with current inspection tags, as noted kitchen is to not be used per this occupancy. Final life fire safety inspection for area of work complete.

Larry Phone #: ###-####
FIR18-00738 INSP-Final Inspection11/8/201811/9/201811/9/2018 10:54:05 AMAPASS
Final inspection for scope of work complete.

Please call Troy with time frame. Phone #: ###-#### Inspection requested via web by Jeff Packham
FIR18-00738 INSP-Sprinkler Rough-in/Hydro11/9/201811/9/201811/9/2018 10:53:40 AMADONE
Hydrostatic test for underground supply re-route witnessed, no pressure loss observed.
BLD18-03996 FIRE-Final Inspection11/7/201811/9/201811/9/2018 10:09:34 AMAPASS
No fire sprinklers, no fire alarm modifications, fire extinguisher is placed with a current inspection tag. Final life fire safety inspection for area of work complete.

Sarah Phone #: ###-####
FIR18-00464 INSP-Conference11/8/201811/9/201811/9/2018 9:41:05 AMADONE
Fire conference complete, an acceptable means of freeze protection has been approved, heaters will be installed in doghouses that are effected with room temperature sensors that will be linked to the fire alarm system. Cover is approved in areas that has passed RTC inspection and notated on city approved drawings, cover install is at GC discretion due to mechanical/electrical work that will be required for the proposed methed of freeze prevention.

on roof ESI would like to talk about the dog houses Phone #: ###-#### Inspection requested via web by Matthew Lewis
FIR18-00464 INSP-Sprinkler Rough-in11/8/201811/9/201811/9/2018 9:18:05 AMAFAIL
Make corrections toupright heads that are blocked as discussed. Add heads in discussed areas next to draft-stops/combustible concealed spaces as discussed.

area B Phone #: ###-#### Inspection requested via web by Matthew Lewis
BLD18-02665 FIRE-Final Inspection11/7/201811/9/201811/9/2018 7:36:16 AMAPASS
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete.

Phone #: ###-#### Inspection requested via web by rocky donica
FIR18-00761 INSP-Final Inspection11/7/201811/9/201811/9/2018 7:29:04 AMAPASS
Final fire sprinkler inspection for area of work complete.

randy courtwright Phone #: ###-#### Inspection requested via web by Brodie Stenquist
FIR18-00821 INSP-Final Inspection11/8/201811/9/201811/9/2018 7:11:57 AMAPASS
Final fire alarm inspection for area of work complete.

Contact is Dirk. 7:00am inspection requested. Phone #: ###-#### Inspection requested via web by Morgan Ahten