BLD18-03569
| FIRE-Final Inspection | 12/10/2018 | 12/10/2018 | 12/10/2018 5:07:08 PM | P | PASS |
|
|
No fire sprinklers, fire alarm inspection complete, fire extinguishers are in common areas with current inspection tags. Final life fire safety inspection for area of work complete.Gale Phone #: ###-####
|
FIR18-00880
| INSP-Final Inspection | 12/10/2018 | 12/10/2018 | 12/10/2018 5:07:08 PM | P | PASS |
|
|
Final fire alarm inspection for area of work complete.
Zach Phone #: ###-####
|
FIR18-00420
| INSP-Sprinkler Rough-in/Hydro | 12/6/2018 | 12/10/2018 | 12/10/2018 2:56:48 PM | P | PART |
|
|
Hydrostatic test for levels 2, 3 and 4 witnessed, no pressure loss observed. Levels 1 and 5 to be completed at a later date.
Leon Taylor is the contact Phone #: ###-#### Inspection requested via web by jeremiah robison
|
FIR18-00684
| INSP-Sprinkler Rough-in | 12/10/2018 | 12/10/2018 | 12/10/2018 1:21:56 PM | P | PASS |
|
|
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover.
Phone #: ###-#### Inspection requested via web by Sam Ball
|
FIR18-00565
| INSP-Sprinkler Rough-in | 12/7/2018 | 12/10/2018 | 12/10/2018 12:42:40 PM | P | PART |
|
|
Rough to cover inspection for units, 111, 113, 115 and 117 complete, approved for cover.
Johnathon Phone #: ###-####
|
BLD18-01628
| FIRE-Final Inspection | 12/10/2018 | 12/10/2018 | 12/10/2018 12:30:26 PM | P | PASS |
|
|
Previously noted items have been corrected, fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in place with current inspection tags. Final life fire safety inspection for area of work complete.
Vince Phone #: ###-####
|
BLD18-02794
| FIRE-Final Inspection | 12/7/2018 | 12/10/2018 | 12/10/2018 12:20:06 PM | A | FAIL |
|
|
Replace missing fire sprinkler escutcheons, total of three are missing. Service or replace emergency lights that are inoperable. Provide fire exitnguisher with cuurent inspection tag and install as discussed.
Parker Phone #: ###-####
|
FIR18-00464
| INSP-Sprinkler Rough-in | 12/7/2018 | 12/10/2018 | 12/10/2018 11:45:30 AM | P | PART |
|
|
Inspection for fire sprinkler piping in doghouse/bump out complete.
DOGHOUSES Phone #: ###-#### Inspection requested via web by Matthew Lewis
|
FIR18-00428
| INSP-Conference | 12/10/2018 | 12/10/2018 | 12/10/2018 11:03:47 AM | P | DONE |
|
|
Fire conference for coverage3 around TV monitors complete, sprinkler will be adjusted for proper coverage around TV monitors.
Tony Phone #: ###-####
|
FIR18-00673
| INSP-Sprinkler Rough-in/Hydro | 12/6/2018 | 12/10/2018 | 12/10/2018 10:41:22 AM | A | FAIL |
|
|
Numerous heads throughout attic space are blocked, correct blockage issue. Numerous areas in attic space has no sprinkler protection. Sway bracing attached to truss webbing needs to be relocated to top cord, bottom cord or verticals. Need access to overbuilds to verify upright protection. Correct hangers on CPVC armovers that are over 6 inches.
CI sprinkler foreman - Nathan Gregory Phone #: ###-#### Inspection requested via web by Shane Lesteberg
|
BLD18-02996
| FIRE-Final Inspection | 12/10/2018 | 12/10/2018 | 12/10/2018 9:55:44 AM | A | PART |
|
|
TCO authorized by Jim Storey on 07DEC2018, hydrant install will be verified with Paint Booth permit.
|