FIR18-00799
| INSP-Sprinkler Rough-in | 12/13/2018 | 12/13/2018 | 12/13/2018 2:23:53 PM | P | PASS |
|
|
Rough to cover inspection for overehad fire sprinkler piping in area of work complete, all areas approved for cover.
Rudy-please call ahead as you will need a badge to enter Phone #: ###-####
|
BLD18-01064
| FIRE-Final Inspection | 12/13/2018 | 12/13/2018 | 12/13/2018 11:40:41 AM | P | FAIL |
|
|
Need fire alarm and fire sprinklers finaled for Phase 1 TCO requested areas before life fire safety inspection will be performed.
Call Chris - Phase 1 Phone #: ###-#### Inspection requested via web by Chris Fuhrman
|
BLD18-02922
| FIRE-Final Inspection | 12/12/2018 | 12/13/2018 | 12/13/2018 11:38:25 AM | A | FAIL |
|
|
City approved drawings and small documents were not onsite, need city approved drawings to perform official life fire safety inspection. Performed courtesy inspection with non-stamped drawings on site, need to add emergency egress lighting per plans, install exit sign on west door as shown on drawings. Restroom door hardware on southside will not operate when locked, need to install code compliant door hardware. Round type door hardware needs to be changed to lever type door hardware. Thumbturn deadbolt on west exterior door needs to be removed and code compliant hardware needs to be installed.
Scott Phone #: ###-####
|
FIR18-00741
| INSP-Sprinkler Rough-in | 12/12/2018 | 12/13/2018 | 12/13/2018 11:10:32 AM | A | PASS |
|
|
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover.
Please call Lonnie with time frame Phone #: ###-#### Inspection requested via web by Jeff Packham
|
FIR18-00673
| INSP-Sprinkler Rough-in | 12/12/2018 | 12/13/2018 | 12/13/2018 10:46:11 AM | A | PART |
|
|
Previously noted items for area C complete, area C on the fire sprinkler drawings approved for cover.
Site Contact - Nathan Phone #: ###-#### Inspection requested via web by Shane Lesteberg
|
FIR17-00474
| INSP-Sprinkler Rough-in | 12/12/2018 | 12/13/2018 | 12/13/2018 9:50:20 AM | A | PART |
|
|
Rough to cover inspection for overhead fire sprinkler piping on level 2 of addition complete, level 2 of addition approved for cover.
Mark Jensen is the contact. Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR18-00153
| INSP-Final Inspection | 12/12/2018 | 12/13/2018 | 12/13/2018 8:32:45 AM | A | FAIL |
|
|
Replace sprinkler on riser with a quick response head. Flow switch did no operate correctly during water flow.
Markus Smith is the contact for this fire final inspection. He is hoping for and AM appointment. Thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR17-00427
| INSP-Final Inspection | 12/12/2018 | 12/13/2018 | 12/12/2018 9:18:32 AM | A | PASS |
|
|
Final undergorund supply inspection complete.
Overhead was finaled and we realized this was complete also. Please call Adam with questions Phone #: ###-#### Inspection requested via web by Jeff Packham
|