BLD18-02654
| FIRE-Final Inspection | 12/17/2018 | 12/17/2018 | 12/17/2018 3:19:20 PM | P | PASS |
|
|
No fire sprinklers, no fire alarms, fire exitnguishers are placed with current inspection tags. Sticker above door will be changed from doors to remain unlocked during business hours to "Door to remain unlocked while building is occupied" before building final. Final life fire safety inspection for area of work complete.
Phone #: ###-#### Inspection requested via web by Sean Worthington
|
FIR18-00510
| INSP-Sprinkler Rough-in | 12/17/2018 | 12/17/2018 | 12/17/2018 2:37:15 PM | P | FAIL |
|
|
Cover material installed before tenting inspection was performed in townhomes, cover material needs to be removed for inspection, cover is not approved.
Tenting inspection for town homes. Phone #: ###-#### Inspection requested via web by Sam Ball
|
FIR18-00786
| INSP-Sprinkler Rough-in | 12/17/2018 | 12/17/2018 | 12/17/2018 2:05:42 PM | P | PASS |
|
|
Rough to cover inspection for overhead fire sprinkler piping innarea of work complete, approved for cover.
Jermey Phone #: ###-####
|
FIR18-00541
| INSP-Sprinkler Rough-in | 12/17/2018 | 12/17/2018 | 12/17/2018 1:52:41 PM | P | PART |
|
|
Rough in inspection for overhead fire sprinkler piping complete, areas where pendant heads are to be installed will require a cover inspection before cover can be approved.
Rudy Phone #: ###-####
|
FIR18-00583
| INSP-Sprinkler Rough-in/Hydro | 12/14/2018 | 12/17/2018 | 12/17/2018 11:51:14 AM | P | DONE |
|
|
Hydrostatic test for level 2 witnessed, no pressure loss observed.
Tony Phone #: ###-####
|
BLD18-03549
| FIRE-Final Inspection | 12/14/2018 | 12/17/2018 | 12/17/2018 11:49:43 AM | A | PASS |
|
|
Final life fire safety inspection for area of work complete.
Paul Phone #: ###-####
|
FIR18-00633
| INSP-Sprinkler Rough-in | 12/13/2018 | 12/17/2018 | 12/17/2018 11:16:29 AM | A | DONE |
|
|
Request was for a conference, all combustible concealed spaces that do not meet the requirements in NFPA 13, 2016 edition, will require sprinkler coverage.
Jim Baker is requesting a consultation for sprinklers in the attic. He would appreciate your help. Thank you. Have a nice day. Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR18-00884
| INSP-Sprinkler Rough-in | 12/14/2018 | 12/17/2018 | 12/17/2018 9:54:53 AM | A | PART |
|
|
Rough in inspection for overhead fire sprinkler piping complete for TI space, a cover inspection will be required before cover is approved.
Todd Ketterling is the contact for this RTC inspection. Thank you for your help. Have a nice day. Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR18-00765
| INSP-Sprinkler Rough-in | 12/14/2018 | 12/17/2018 | 12/17/2018 9:52:52 AM | A | PASS |
|
|
Rough in inspection for overhead fire sprinkler associated with core and shell complete, any areas outside of corr and shell will require a cover inspection.
Todd Ketterling is the contact for this RTC inspection. Thank you for your help. Have a nice day. Phone #: ###-#### Inspection requested via web by Stan Beus
|