Inspections for the day of: Monday, February 4, 2019.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR18-00610 INSP-Sprinkler Rough-in2/4/20192/4/20192/4/2019 3:36:29 PMPPART
Rough to cover inspection for overhead fire sprinkler piping located above the hardlids in restrooms on level 3 complete, level 3 restrooms approved for cover.

Rough to cover third floor Phone #: ###-#### Inspection requested via web by Christophe Wilson
FIR18-00908 INSP-Sprinkler Rough-in2/4/20192/4/20192/4/2019 2:51:12 PMPPART
Rough to cover inspection for overhead fire sprinkler piping lovcated above hardlids complete, hardlids approved for cover.

Rudy Phone #: ###-####
FIR18-00906 INSP-Sprinkler Rough-in2/4/20192/4/20192/4/2019 2:13:09 PMPPART
Partial rough to cover inspection for overhead fire sprinkler piping complete, overehad fire sprinkler piping installed between conditioned spaces approved for cover, piping in attic spaces requiring tenting not approved for cover until a tenting inspection is performed and approved for cover.
FIR18-00906 INSP-Sprinkler Rough-in/Hydro2/1/20192/4/20192/4/2019 2:10:47 PMPDONE
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed.

Call Anthony before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
FIR19-00012 INSP-Sprinkler Rough-in/Hydro2/4/20192/4/20192/4/2019 1:36:35 PMPPART
24 hour air test started at 1PM with 41 psi on new piping.

24hr air test Phone #: ###-#### Inspection requested via web by Matthew Lewis
FIR18-00814 INSP-Supply line flush2/1/20192/4/20192/4/2019 11:03:19 AMADONE
Underground supply flush witnessed.

Phone #: ###-#### Inspection requested via web by Sam Ball
FIR18-00519 INSP-Supply line flush2/1/20192/4/20192/4/2019 10:43:36 AMPFAIL
Could not complete flush, underground valves were not accessable at time that flush could be completed due to dirt cover/bent valve box.

Underground hydro/flush
Gabriel Garduno is the contact Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00562 INSP-Supply line flush2/1/20192/4/20192/4/2019 10:43:19 AMPFAIL
Could not complete flush, underground valves were not accessable at time that flush could be completed due to dirt cover/bent valve box.

Underground hydro/flush
Gabriel Garduno is the contact Phone #: ###-#### Inspection requested via web by Stan Beus
BLD18-01031 FIRE-Final Inspection2/1/20192/4/20192/4/2019 8:57:49 AMAPART
Partial final inspection for life fire safety complete, patio attached to waiting room is to remain locked with no occupancy allowed on patio until notification is installed. Permit can be finaled for life fire safety after fire alarm notification is installed and associated FIR permit for fire alarms is complete.

Stan Phone #: ###-####
BLD16-02008 FIRE-Final Inspection2/1/20192/4/20192/4/2019 8:49:42 AMAPASS
Final pahse 5 for project complete, final inspection for life fire safety complete.

Phase 5 TCO Plan, Final inspection of Phase 5 roof patio. Call Adam before heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
FIR16-00563 INSP-Final Inspection2/4/20192/4/20192/4/2019 8:48:14 AMAPASS
Final fire sprinkler inspection complete.
BLD18-03949 FIRE-Final Inspection2/4/20192/4/20192/4/2019 8:45:26 AMPPASS
Inspection request cancelled per conversation with point of contact, will be rescheduled for a later date.

Dustin Phone #: ###-####
FIR18-00209 INSP-Final Inspection2/1/20192/4/20192/4/2019 8:26:09 AMAPASS
Final fire sprinkler inspection complete.

Phone #: ###-#### Inspection requested via web by Sam Ball