BLD19-00287
| FIRE-Final Inspection | 2/6/2019 | 2/6/2019 | 2/6/2019 3:12:48 PM | P | FAIL |
|
|
Racking in southeast area of warehouse exceeds 8 feet, as stated in the city approved documents, racking exceeding 8 feet will require a seperate permit.
call 30 ahead for access- Bruce Phone #: ###-####
|
BLD19-00118
| FIRE-Final Inspection | 2/6/2019 | 2/6/2019 | 2/6/2019 2:42:04 PM | P | PASS |
|
|
Final life fire safety inspection for area of work complete.
Please call 30 mins ahead of time so I can meet you there. Phone #: ###-#### Inspection requested via web by Gerome Fries
|
FIR19-00036
| INSP-Final Inspection | 2/5/2019 | 2/6/2019 | 2/6/2019 2:25:50 PM | P | PASS |
|
|
Final hood suppression system inspection for area of work complete.
Nate Phone #: ###-####
|
BLD19-00040
| FIRE-Final Inspection | 2/6/2019 | 2/6/2019 | 2/6/2019 1:47:11 PM | P | PASS |
|
|
Final life fire safety inspection for area of work complete.
Please call 30 mins ahead of time so I can meet you there. Phone #: ###-#### Inspection requested via web by Gerome Fries
|
FIR18-00891
| INSP-Sprinkler Rough-in | 2/6/2019 | 2/6/2019 | 2/6/2019 1:26:41 PM | P | FAIL |
|
|
Underground piping was covered before inspection was performed, all cover material needs to be removed from changes of direction as well as spot checked on longer runs of piping to verify proper depth of cover for what was installed. City approved drawings for undergorund supply need to be available at time of inspection.
Cam Hess is the contact. Thanks for the hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR18-00889
| INSP-Sprinkler Rough-in | 2/6/2019 | 2/6/2019 | 2/6/2019 1:26:14 PM | P | FAIL |
|
|
Underground piping was covered before inspection was performed, all cover material needs to be removed from changes of direction as well as spot checked on longer runs of piping to verify proper depth of cover for what was installed. City approved drawings for undergorund supply need to be available at time of inspection.
in pipingCam Hess is the contact. Thanks for all that you do! Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR18-00410
| INSP-Final Inspection | 2/4/2019 | 2/6/2019 | 2/6/2019 8:10:42 AM | A | FAIL |
|
|
Final inspection for fire alarm upgrade is complete. Noted on my 08NOV2018 inspection: Submit as-builts and have them ready for next inspection, as-buits have not been submitted to Lee as of this inspection, as builts need to be submitted. When as-builts are approved then permit can be finaled.
Would it be possible to do a 7:00 am inspection on Wednesday the 6th? -Jason ###-#### Phone #: ###-#### Inspection requested via web by Neal Timmerman
|