FIR19-00007
| INSP-Sprinkler Rough-in | 3/13/2019 | 3/14/2019 | 3/14/2019 3:04:53 PM | P | PART |
|
|
Rough in inspection for overhead fire sprinkler piping complete. Tenting was not installedf at time of inspection, cover is not approved until tenting is insected and passed.
Tenting at same time as rough-hydro. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
FIR19-00007
| INSP-Sprinkler Rough-in/Hydro | 3/13/2019 | 3/14/2019 | 3/14/2019 3:03:45 PM | P | DONE |
|
|
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed.
Rough-hydro, call Anthony before heading out. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
FIR18-00644
| INSP-Final Inspection | 3/14/2019 | 3/14/2019 | 3/14/2019 2:44:08 PM | P | PART |
|
|
Fire alarm audible device now meets the required NFPA 72 sound level requirements in the new kitchen area..
Final is for Kitchen Only. Contact is Dirk. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
BLD18-03381
| FIRE-Final Inspection | 3/14/2019 | 3/14/2019 | 3/14/2019 1:59:09 PM | P | FAIL |
|
|
Mag lock access control needs to be integrated with the fire alarm system for door release under general water flow alarm. Ceiling fan on main floor needs to be integrated with the fire alarm panel to shut down on general water flow alarm per manufacture instructions. Provide emergency egress lighting for exit discharge as shown on city approved drawings. Verfiy CFM of newly installed HVAC unit, if unit moves more than 2000CFM then an in-duct smoke detector will be required for unit shutdown. Modifications to the fire alarm system requires a permit.
Greg Phone #: ###-####
|
FIR18-00235
| INSP-Final Inspection | 3/14/2019 | 3/14/2019 | 3/14/2019 1:02:19 PM | P | FAIL |
|
|
Put panel into trouble, trouble signal was recieved at central station, sent a general alarm and trouble restored at central station. Issue needs to be resloved and panel needs to be tested with real events and not shorting contacts.
Jacob Phone #: ###-####
|
FIR18-00541
| INSP-Sprinkler Rough-in/Hydro | 3/13/2019 | 3/14/2019 | 3/14/2019 12:32:36 PM | A | DONE |
|
|
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed.
Tom Phone #: ###-####
|
BLD18-02948
| FIRE-Final Inspection | 3/14/2019 | 3/14/2019 | 3/14/2019 11:30:07 AM | P | PASS |
|
|
Final life fire safety inspection for area of work complete.
kelly Phone #: ###-####
|
FIR18-00267
| INSP-Sprinkler Rough-in | 3/13/2019 | 3/14/2019 | 3/14/2019 11:27:06 AM | P | PART |
|
|
Rough to cover inspection for the remaining overhead fire sprinkler piping on level 3 complete, all of level 3 approved for cover. Overhead fire sprinkler piping above hardlids next to sky bridge inspected, piping above hardlids in inspected areas approved for cover.
Justin Phone #: ###-####
|
FIR18-00267
| INSP-Sprinkler Rough-in/Hydro | 3/13/2019 | 3/14/2019 | 3/14/2019 11:24:12 AM | P | DONE |
|
|
Hydrostatic test for three dry systems witnessed, no pressure loss observed.
Justin Phone #: ###-####
|
FIR19-00067
| INSP-Sprinkler Rough-in | 3/14/2019 | 3/14/2019 | 3/14/2019 10:26:37 AM | P | PASS |
|
|
Rough to cover inspection for undergorund supply complete, underground approved for cover.
Bryan Collins is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR18-00565
| INSP-Sprinkler Rough-in/Hydro | 3/13/2019 | 3/14/2019 | 3/14/2019 10:25:55 AM | A | DONE |
|
|
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed.
Johnathon Phone #: ###-####
|
FIR18-00564
| INSP-Supply line flush | 3/13/2019 | 3/14/2019 | 3/14/2019 10:24:52 AM | A | DONE |
|
|
Underground main line flush complete.
Johnathon Phone #: ###-####
|