FIR20-00191
| INSP-Sprinkler Rough-in | 3/25/2020 | 3/26/2020 | 3/26/2020 2:29:14 PM | P | PASS |
|
|
Rough to cover inspection for overhead fire sprinkler piping is complete. All tenting in place a time of inspection, 2 minor corrections for tenting was completed by point of contact at time of inspection, cover is approved.
Overhead rough/tenting, call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
FIR20-00054
| INSP-Sprinkler Rough-in | 3/25/2020 | 3/26/2020 | 3/26/2020 11:03:48 AM | A | PASS |
|
|
Rough to cover inspection for overhead fire sprinkler piping is complete, freeze protection is in place, composite wood joist have been filled with expanding foam insulation for freeze protection, tenting not required for this application. Cover is approved at contractors discretion contingent upon the as-builts being approved for install.
Overhead rough/tenting, call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
BLD19-03530
| FIRE-Final Inspection | 3/26/2020 | 3/26/2020 | 3/26/2020 10:59:27 AM | A | PASS |
|
|
Fire sprinkler inspection is complete, no fire alarm modifications, fire extinguishers are in common areas with current inspection tags. Final life fire safety inspection for area of work is complete, signature card not available at time of inspection.
|
BLD19-00378
| FIRE-Final Inspection | 3/26/2020 | 3/26/2020 | 3/26/2020 10:59:14 AM | A | PASS |
|
|
Fire sprinkler inspection is complete, no fire alarm modifications, fire extinguishers are in common areas with current inspection tags. Final life fire safety inspection for area of work is complete, signature card not available at time of inspection.
|
FIR20-00199
| INSP-Final Inspection | 3/25/2020 | 3/26/2020 | 3/26/2020 10:57:43 AM | A | PASS |
|
|
All piping is exposed, rough to cover not required, final fire sprinkler inspection for scope of work is complete.
Call Steve Johnson @###-#### for escort Phone #: ###-#### Inspection requested via web by Steve Johnson
|
FIR20-00199
| INSP-Sprinkler Rough-in/Hydro | 3/26/2020 | 3/26/2020 | 3/26/2020 10:56:01 AM | A | DONE |
|
|
24 hour air test and hydrostatic test have been witnessed, no pressure loss was observed.
|
FIR20-00207
| INSP-Final Inspection | 3/25/2020 | 3/26/2020 | 3/26/2020 10:55:21 AM | A | PASS |
|
|
All piping is exposed, no cover inspection required, final fire sprinkler inspection for area of work is complete.
call Steve Johnson @ ###-#### for escort Phone #: ###-#### Inspection requested via web by Steve Johnson
|
FIR20-00061
| INSP-Sprinkler Rough-in | 3/25/2020 | 3/26/2020 | 3/26/2020 8:30:20 AM | A | PASS |
|
|
Rough to cover inspection for overhead fire sprinkler piping is complete. All tenting in place at time of inspection, cover is approved. Cover approval sticker has been placed.
Overhead rough/tenting, call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
FIR19-00911
| INSP-Sprinkler Rough-in | 3/24/2020 | 3/26/2020 | 3/26/2020 12:00:00 AM | A | CANC |
|
|
Cancel per Kerry Phone #: ###-#### >> Inspection requested via web by Lonnie Greenfield
|