Inspections for the day of: Monday, April 1, 2019.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR18-00804 INSP-Sprinkler Rough-in4/1/20194/1/20194/1/2019 4:57:47 PMPPASS
Rough to cover inspection for wing C complete. All rough in inspection for this project complete.
FIR18-00804 INSP-Final Inspection3/29/20194/1/20194/1/2019 4:55:41 PMPPART
Final trip test for wing C complete at 50 seconds. Final inspection for wing C complete, auto purge devices need to be relocated out of the attic space, temperature for auto purges per installation requirements specifies that purge unit needs to be in temperature controlled environment between -4 degrees farenheit to 122 degrees farenheit, the attic space has the ability to exceed these limits. FIR permit for fire sprinkler will not be finaled until address related fire alarm and AES permits are inspected and finaled.

Richard Clark is the contact. This final inspection is for wing C. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
BLD19-00848 FIRE-Final Inspection3/29/20194/1/20194/1/2019 2:33:48 PMPPASS
No fire sprinklers, no fire alarms, fire extinguisher has a current inspection tag and will be placed in discussed location. Final life fire safety inspection for area of work comlpete.

Ron Phone #: ###-####
BLD18-02909 FIRE-Final Inspection4/1/20194/1/20194/1/2019 2:03:16 PMPPASS
Previously noted items have been corrected, no fire sprinkler modifications, fire alarm inspection is complete, fire extinguisher is placed and will be tagged with a current inspection tag. Final life fire safety inspection for area of work complete.

Jane Phone #: ###-####
FIR18-00804 INSP-Sprinkler Rough-in/Hydro4/1/20194/1/20194/1/2019 1:53:25 PMPDONE
24 hour air test complete per conversation with Troy Cobbley.
FIR18-00640 INSP-Sprinkler Rough-in4/1/20194/1/20194/1/2019 1:41:22 PMPPART
Rough to cover inspection for overhead fire sprinkler piping in paint-booth itself is complete, overhead filters can be placed, no use of the paint booth is authorized until final inspections are complete.

Jeff Chaney is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00510 INSP-Sprinkler Rough-in4/1/20194/1/20194/1/2019 11:25:38 AMPFAIL
Tenting not installed correctly, tenting needs to be over the entire piping to include areas where trusses are crossed. Piping in attic space must be clear between sheetrock and piping, no insulation between sheetrock and piping, areas throughout floor have spots where insulation is installed between piping and sheetrock. No combustible pockets in attic space per NFPA 13, all areas in attic space to be filled with non-combustible insulation as discussed, cover is not approved for remaining units, contact on-site foreman for added detail on proper tenting installation.

still have gaps

Fifth floor tenting inspection. Phone #: ###-#### Inspection requested via web by Sam Ball
FIR19-00177 INSP-Final Inspection3/29/20194/1/20194/1/2019 11:23:39 AMAPASS
Final fire sprinkler inspection complete.

Cole Phone #: ###-####
FIR18-00565 INSP-Sprinkler Rough-in/Hydro3/29/20194/1/20194/1/2019 11:22:27 AMADONE
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed, hydrostatic testing for this building is complete.

overhead // Jonathan Phone #: ###-####
FIR18-00527 INSP-Sprinkler Rough-in4/1/20194/1/20194/1/2019 10:38:50 AMAPASS
Insulation inspection for fire sprinkler piping heat trace complete, approved for cover.
FIR18-00528 INSP-Sprinkler Rough-in4/1/20194/1/20194/1/2019 10:38:09 AMAPASS
Insulation inspection for fire sprinkler piping heat trace complete, approved for cover.
FIR18-00529 INSP-Sprinkler Rough-in4/1/20194/1/20194/1/2019 10:37:25 AMAPASS
Insulation inspection for fire sprinkler piping heat trace complete, approved for cover.
FIR18-00527 INSP-Conference4/1/20194/1/20194/1/2019 10:35:48 AMPCANC
Inspection is for a rough in for heat trace insulation cover, not a conference, this request is cancelled.

Phone #: 2085733237 >> Inspection requested via mobile web by Scott Wilson
FIR18-00528 INSP-Conference4/1/20194/1/20194/1/2019 10:35:16 AMPCANC
Inspection is for a rough in for heat trace insulation cover, not a conference, this request is cancelled.

Phone #: 2085733237 >> Inspection requested via mobile web by Scott Wilson
FIR18-00529 INSP-Conference4/1/20194/1/20194/1/2019 10:34:45 AMPCANC
Inspection is for a rough in for heat trace insulation cover, not a conference, this request is cancelled.

Phone #: 2085733237 >> Inspection requested via mobile web by Scott wilson
BLD19-00582 FIRE-Final Inspection3/29/20194/1/20194/1/2019 8:38:32 AMAPASS
Fire sprinkler modifications completye (FIR19-00177), no fire alarm modifications, fire extinguishers are placed with current inspection tags, emergency lighting has been repaired since previous comments. Final life fire safety inspection complete.

830 // tina Phone #: ###-####
BLD17-04626 FIRE-Final Inspection3/29/20194/1/20194/1/2019 7:47:56 AMAPASS
Fire sprinkler inspection complete, fire al;arm inspection complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection complete, fire alarms must be monitored after occupancy.

fire, Life ; Safety Phone #: ###-#### Inspection requested via web by J.C. Murray
FIR18-00636 INSP-Final Inspection3/29/20194/1/20194/1/2019 7:46:26 AMAPEND
Previousl;y noted items have been corrected, final fire sprinkler inspection complete.

Gerardo Arce is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus