Inspections for the day of: Wednesday, April 10, 2019.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-04066 FIRE-Final Inspection4/10/20194/10/20194/10/2019 2:31:31 PMPPASS
Approved hardware has been installed on west door, final life fire safety inspection complete.

Phone #: ###-#### Inspection requested via web by Justin Schwartz
FIR18-00633 INSP-Sprinkler Rough-in/Hydro4/9/20194/10/20194/10/2019 2:21:05 PMPCANC
Rescheduled for 11APR2019 per conversation with point of contact, this request is cancelled.

Kenny Caldwell is the contact for this inspection. He is requesting it for the 2nd Floor. Thank you for your help. Have a nice day. Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00510 INSP-Sprinkler Rough-in4/10/20194/10/20194/10/2019 2:16:02 PMPPART
Tenting inspection for corridor that runs north to south on level 5 complete, corrifor approved for cover. Insulation has been removed in rooms 507 and 509, insulation was on floor, cover is not approved for rooms 507 and 509. Not all lowered ceiling heads on level 4 have been cut in, will be inspected at a later date when all soffit/lowered hardlids have been installed.

4th floor rough in,and 5th floor tenting. Phone #: ###-#### Inspection requested via web by Sam Ball
FIR19-00019 INSP-Sprinkler Rough-in/Hydro4/9/20194/10/20194/10/2019 1:39:31 PMPFAIL
Pressure at start of hydro was not the same PSI at end of hydro. On site plans do not have city approved stamp, no overhead inspection performed.

Call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
FIR18-00640 INSP-Sprinkler Rough-in4/9/20194/10/20194/10/2019 1:14:48 PMAFAIL
Provide fire sprinkler in entry that was enclosed between buildings. Provide freeze protection for main and heads between buildings, doorway was enclosed, no heating in area between buildings. Include extra 6 inch 90 on riser main to duct heads that is not shown on the city approved drawings. Install missing retaining straps. Remove cover material in office area that was installed. Provide city approved drawings for remaining building, not just the paint booth. Install high temperature heads that are above heaters. Heads next to old paint booth wall are over 9 foot from wall as well as heads outside of old paint booth entry, heads a over 8 foot off of wall, heads are overspaced. Install flexible vic couplings on risers/riser nipples where required throughout sprinkler system.

Jim Baker is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
FIR19-00110 INSP-Final Inspection4/8/20194/10/20194/10/2019 1:08:32 PMAPASS
Final fire alarm inspection for area of work complete.

Phone #: ###-#### Inspection requested via web by John Lopez
BLD19-00246 FIRE-Final Inspection4/9/20194/10/20194/10/2019 9:51:28 AMAPASS
No fire sprinkler modifications, no fire alarm modifications, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete.

Mike Phone #: ###-####
BLD19-00377 FIRE-Final Inspection4/9/20194/10/20194/10/2019 9:51:04 AMAPASS
No fire sprinkler modifications, no fire alarm modifications, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete.

Mike Phone #: ###-####