BLD18-04066
| FIRE-Final Inspection | 4/10/2019 | 4/10/2019 | 4/10/2019 2:31:31 PM | P | PASS |
|
|
Approved hardware has been installed on west door, final life fire safety inspection complete.
Phone #: ###-#### Inspection requested via web by Justin Schwartz
|
FIR18-00633
| INSP-Sprinkler Rough-in/Hydro | 4/9/2019 | 4/10/2019 | 4/10/2019 2:21:05 PM | P | CANC |
|
|
Rescheduled for 11APR2019 per conversation with point of contact, this request is cancelled.
Kenny Caldwell is the contact for this inspection. He is requesting it for the 2nd Floor. Thank you for your help. Have a nice day. Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR18-00510
| INSP-Sprinkler Rough-in | 4/10/2019 | 4/10/2019 | 4/10/2019 2:16:02 PM | P | PART |
|
|
Tenting inspection for corridor that runs north to south on level 5 complete, corrifor approved for cover. Insulation has been removed in rooms 507 and 509, insulation was on floor, cover is not approved for rooms 507 and 509. Not all lowered ceiling heads on level 4 have been cut in, will be inspected at a later date when all soffit/lowered hardlids have been installed.
4th floor rough in,and 5th floor tenting. Phone #: ###-#### Inspection requested via web by Sam Ball
|
FIR19-00019
| INSP-Sprinkler Rough-in/Hydro | 4/9/2019 | 4/10/2019 | 4/10/2019 1:39:31 PM | P | FAIL |
|
|
Pressure at start of hydro was not the same PSI at end of hydro. On site plans do not have city approved stamp, no overhead inspection performed.
Call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
FIR18-00640
| INSP-Sprinkler Rough-in | 4/9/2019 | 4/10/2019 | 4/10/2019 1:14:48 PM | A | FAIL |
|
|
Provide fire sprinkler in entry that was enclosed between buildings. Provide freeze protection for main and heads between buildings, doorway was enclosed, no heating in area between buildings. Include extra 6 inch 90 on riser main to duct heads that is not shown on the city approved drawings. Install missing retaining straps. Remove cover material in office area that was installed. Provide city approved drawings for remaining building, not just the paint booth. Install high temperature heads that are above heaters. Heads next to old paint booth wall are over 9 foot from wall as well as heads outside of old paint booth entry, heads a over 8 foot off of wall, heads are overspaced. Install flexible vic couplings on risers/riser nipples where required throughout sprinkler system.
Jim Baker is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR19-00110
| INSP-Final Inspection | 4/8/2019 | 4/10/2019 | 4/10/2019 1:08:32 PM | A | PASS |
|
|
Final fire alarm inspection for area of work complete.
Phone #: ###-#### Inspection requested via web by John Lopez
|
BLD19-00246
| FIRE-Final Inspection | 4/9/2019 | 4/10/2019 | 4/10/2019 9:51:28 AM | A | PASS |
|
|
No fire sprinkler modifications, no fire alarm modifications, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete.
Mike Phone #: ###-####
|
BLD19-00377
| FIRE-Final Inspection | 4/9/2019 | 4/10/2019 | 4/10/2019 9:51:04 AM | A | PASS |
|
|
No fire sprinkler modifications, no fire alarm modifications, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete.
Mike Phone #: ###-####
|