Inspections for the day of: Thursday, April 11, 2019.
Number of inspections: 23
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR18-00692 INSP-Final Inspection4/10/20194/11/20194/11/2019 5:43:47 PMPPASS
Final inspection for underground supply complete.

Contact Tanner Loomis ###-#### 30 min prior to UG Fire final insp start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
FIR18-00862 INSP-Final Inspection4/10/20194/11/20194/11/2019 5:43:20 PMPFAIL
Replace fire sprinkler head that was painted. Add missing sidewall in level 3 apartment.

Contact Tanner Loomis - ###-#### 30 min prior to Fire Final insp start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
FIR18-00885 INSP-Final Inspection4/10/20194/11/20194/11/2019 5:37:52 PMPPASS
Final fire alarm inspection complete.

Drew Phone #: ###-####
BLD18-03346 FIRE-Final Inspection4/11/20194/11/20194/11/2019 3:14:01 PMPPASS
Final life fire safety inspection for racking permit complete.

Call 20 minutes ahead // Jake Phone #: ###-####
FIR17-00612 INSP-Sprinkler Rough-in/Hydro4/10/20194/11/20194/11/2019 2:17:57 PMPDONE
Hydrostatic test for overhead fire sprinkler on Rite Aid dry system witnessed, no pressure loss observed.

Jon Beazer is the contact. This is for a Hydro only. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
FIR19-00159 INSP-Sprinkler Rough-in/Hydro4/10/20194/11/20194/11/2019 2:14:56 PMPCANC
Cancelled per conversation with point of contact, overhead door not installed.

Please cordinate hydro with Troy Nelson Phone #: ###-#### Inspection requested via web by Christophe Wilson
FIR18-00673 INSP-Final Inspection4/9/20194/11/20194/11/2019 2:14:56 PMPPART
Time requirements for dry system trip (3 systems total) test complete. Need as-builts submitted boefore final inspection.

Please call Todd Woods prior to arrival to coordinate inspection. Phone #: ###-#### Inspection requested via web by Kristin Dolan
FIR19-00019 INSP-Sprinkler Rough-in4/10/20194/11/20194/11/2019 12:19:20 PMPPART
Rough to cover inspection for overhead fire sprinkler piping complete. Partial tenting inspection complete, notated city approved drawings area above living room where tenting was not completed. Tenting in all other areas in place at time of inspection, all areas approved for cover except in living room area notated on city approved drawings that does not have tenting installed as of this note entry.

Tenting inspection, plans will be brought out in the morning, check with James on where they were tucked to keep out of the wind. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
FIR19-00019 INSP-Sprinkler Rough-in/Hydro4/11/20194/11/20194/11/2019 12:16:54 PMADONE
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed.

BLD18-04506 FIRE-Final Inspection4/11/20194/11/20194/11/2019 11:41:27 AMAPASS
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguisher is placed with a current inspection tag. Final life fire safety inspection for area of work complete.

FIR19-00069 INSP-Final Inspection4/11/20194/11/20194/11/2019 11:38:44 AMAPASS
Final fire alarm inspection for area of work complete.
FIR19-00069 INSP-Alarm Testing4/10/20194/11/20194/11/2019 11:37:56 AMAPASS
Fire alarm testing complete.

Wiill Phone #: ###-####
FIR18-00954 INSP-Final Inspection4/11/20194/11/20194/11/2019 11:37:31 AMAPASS
Final fire sprinkler inspection for area of work complete.
FIR18-00954 INSP-Sprinkler Rough-in/Hydro4/10/20194/11/20194/11/2019 11:36:46 AMAPASS
Rough to cover inspection for area of work complete.

Wiill Phone #: ###-####
FIR18-00812 INSP-Supply line flush4/9/20194/11/20194/11/2019 11:02:39 AMADONE
Underground main line flush complete.

Gerardo Arce is the contact. Stacy from Suez has this on his schedule, contact him for a more specific time. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00601 INSP-Supply line flush4/9/20194/11/20194/11/2019 11:02:13 AMADONE
Underground main line flush complete.



Gerardo Arce is the contact. Stacy from Suez has this on his schedule, contact him for a more specific time. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00813 INSP-Supply line flush4/9/20194/11/20194/11/2019 11:01:06 AMAFAIL
Underground valve could not be found.

Gerardo Arce is the contact. Stacy from Suez has this on his schedule, contact him for a more specific time. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
FIR19-00085 INSP-Final Inspection4/10/20194/11/20194/11/2019 10:09:55 AMPPASS
Final fire sprinkler inspection for area of work complete.

Contact Ken Orahood - ###-#### 30 Min prior to Fire Final Insp start please.

Than YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
BLD17-01829 FIRE-Final Inspection4/10/20194/11/20194/11/2019 9:42:29 AMAPASS
Previouslu noted items have been corrected, final life fire safety inspection for area of work complete.

Jay Phone #: ###-####
FIR18-00633 INSP-Sprinkler Rough-in4/10/20194/11/20194/11/2019 9:22:30 AMAPART
Rough to cover inspection for overhead fire sprinkler piping in apartment units east of elevator lobby level 4 complete, apartment units east of elevator lobby on level 4 approved for cover. As stated before, need to have a jobsite set of approved drawings for proper documentation, if a current reviewed jobsite set of approved drawings is not provided then no inspection will be performed.

Kenny Caldwell is the contact for this inspection. He is requesting it for the 2nd Floor. Thank you for your help. Have a nice day. Phone #: ###-#### Inspection requested via web by Stan Beus
FIR19-00228 INSP-Final Inspection4/9/20194/11/20194/11/2019 1:41:48 AMAPASS
Final fire alarm inspection for area of work complete.

after hours inspection 4/11/2019 at 1am
Rob ###-####
FIR19-00050 INSP-Final Inspection4/10/20194/11/20194/11/2019 12:25:37 AMAPASS
Final fire sprinkler inspection for area of work complete.

Inspection requested via web by Jeff Packham
FIR19-00085 INSP-Supply line flush4/10/20194/11/20194/10/2019 2:55:36 PMPCANC
Contact Ken Orahood ###-#### 30 min prior to Fire Final Insp start please Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank