Inspections for the day of: Wednesday, April 24, 2019.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD17-01000 FIRE-Final Inspection4/24/20194/24/20194/24/2019 4:39:22 PMPPART
Life fire safety inspection for phase 2 TCO complete.
FIR17-00508 INSP-Final Inspection4/23/20194/24/20194/24/2019 4:32:57 PMPPART
Fire alarm inspection for phase 2 TCO complete.

please go after 3:30, this is a school-Joe Phone #: ###-####
FIR18-00610 INSP-Sprinkler Rough-in/Hydro4/24/20194/24/20194/24/2019 2:26:48 PMPPART
Rough to cover inspection for overhead fire sprinkler piping above suspended ceilings in elevator lobbies on levels 1 and 2 complete, levels 1 and 2 elevator lobbies approved for cover.

Mike Phone #: ###-####
FIR18-00398 INSP-Sprinkler Rough-in/Hydro4/22/20194/24/20194/24/2019 2:02:26 PMADONE
Hydrostatic test for undergorund supply witnessed, no pressure loss observed.

Kenny Caldwell is the contact for this Hydro/Flush Inspection. We are hoping for an AM appointment and trying to coordinate with Stacey @ Suez. We appreciate your help. Have a great day. Phone #: ###-#### Inspection requested via web by Stan Beus
BLD18-03799 FIRE-Final Inspection4/24/20194/24/20194/24/2019 1:16:33 PMPPASS
Previously noted items have been corrected, final life fire safety inspection complete.

Steve Phone #: ###-####
FIR19-00223 INSP-Final Inspection4/24/20194/24/20194/24/2019 12:38:43 PMPPASS
Final fire alarm inspection complete.

Robert Phone #: ###-####
FIR19-00222 INSP-Final Inspection4/24/20194/24/20194/24/2019 12:37:41 PMPPASS
Final fire alarm inspection complete.

Robert Phone #: ###-####
FIR18-00027 INSP-Final Inspection4/23/20194/24/20194/24/2019 12:37:00 PMAPASS
Final fire sprinkler inspection complete.

We would like to perform this in conjunction with fire alarm testing.
Please call Lonnie with time frame. Phone #: ###-#### Inspection requested via web by Jeff Packham
FIR17-00579 INSP-Final Inspection4/23/20194/24/20194/24/2019 12:36:24 PMAPASS
Final inspection for underground supply complete.

Please call Lonnie with time frame. Phone #: ###-#### Inspection requested via web by Jeff Packham
BLD18-01083 FIRE-Conference4/23/20194/24/20194/24/2019 11:15:56 AMADONE
Fire conference complete, egress paths discussed as well as the addition of an exit sign and two being removed.

John Phone #: ###-####
FIR18-00673 INSP-Final Inspection4/24/20194/24/20194/24/2019 10:32:55 AMPCANC
Rescheduled for 25APR2019 per conversation with point of contact, this request is cancelled.

Todd Phone #: ###-####
FIR19-00180 INSP-Sprinkler Rough-in4/23/20194/24/20194/24/2019 10:32:14 AMAPASS
Tenting inspection complete, overhead fire sprinkler piping approved for cover.

john Phone #: ###-####
FIR18-00501 INSP-Sprinkler Rough-in/Hydro4/23/20194/24/20194/24/2019 10:31:32 AMADONE
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed.

George Jess is the contact, he wants this to be a 200 lbs hydro only inspection. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00398 INSP-Supply line flush4/22/20194/24/20194/24/2019 10:16:29 AMADONE
Underground main line flush complete.

Kenny Caldwell is the contact for this Hydro/Flush Inspection. We are hoping for an AM appointment and trying to coordinate with Stacey @ Suez. We appreciate your help. Have a great day. Phone #: ###-#### Inspection requested via web by Stan Beus