FIR17-00267
| INSP-Sprinkler Rough-in | 4/27/2018 | 4/27/2018 | 4/27/2018 1:56:43 PM | P | PART |
|
|
Rough to cover inspection for overhead fire sprinkler piping in hotel guest rooms on level 1 northeast side complete, hotels rooms on level 1 northeast side approved for cover.
|
FIR18-00291
| INSP-Sprinkler Rough-in | 4/27/2018 | 4/27/2018 | 4/27/2018 1:42:36 PM | P | PART |
|
|
Partial rough to cover inspection for scope of work complete, notated city approved plans with red in area approved for cover.
|
FIR18-00208
| INSP-Sprinkler Rough-in | 4/26/2018 | 4/27/2018 | 4/27/2018 11:41:59 AM | A | PART |
|
|
Rough to cover inspection for overhead fire sprinkler piping located above hardlids complete, notated city approved drawings areas approved for cover.
|
FIR18-00165
| INSP-Final Inspection | 4/25/2018 | 4/27/2018 | 4/27/2018 11:40:45 AM | A | PASS |
|
|
Final fire sprinkler inspection for scope of work complete.
|
FIR17-00529
| INSP-Final Inspection | 4/26/2018 | 4/27/2018 | 4/27/2018 9:46:36 AM | A | PASS |
|
|
Hydrostatic test for overhead fire sprinkler piping was completed during a past inspection, final fire sprinkler inspection for area of work complete.
|