FIR19-00139
| INSP-Final Inspection | 4/4/2019 | 4/4/2019 | 4/4/2019 4:13:21 PM | P | PASS |
|
|
Final fire sprinkler inspection for area of work complete.
Kyle Koepnick is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR19-00146
| INSP-Final Inspection | 4/4/2019 | 4/4/2019 | 4/4/2019 4:07:29 PM | P | PART |
|
|
Final fire alarm inspection for levels 4, 5 and 6 complete. Remaining work to be completed at a later date.
|
FIR19-00146
| INSP-Alarm Testing | 4/2/2019 | 4/4/2019 | 4/4/2019 4:06:45 PM | P | DONE |
|
|
Fire alarm testing complete.
Josh-partial on floors 4, 5 & 6 Phone #: ###-####
|
BLD18-04110
| FIRE-Final Inspection | 4/4/2019 | 4/4/2019 | 4/4/2019 2:16:10 PM | P | PART |
|
|
Previously noted items have been corrected. FIR permit has been received for fire alarm demo, TCO is authorized for 30 days for life safety contingent on the work on the FIR permit for the fire alarm is completed, inspected and finaled.
Call ahead // Clint Phone #: ###-####
|
FIR18-00862
| INSP-Sprinkler Rough-in | 4/1/2019 | 4/4/2019 | 4/4/2019 1:41:31 PM | P | FAIL |
|
|
Both dry system and small wet system lost pressure, 6 PSI on dry, 15 PSI on small wet system. Larger wet system had no pressure loss observed.
Contact Tanner Loomis - ###-#### 30 Min prior to RTC Insp start please.
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
FIR18-00692
| INSP-Sprinkler Rough-in | 4/1/2019 | 4/4/2019 | 4/4/2019 1:40:29 PM | P | DONE |
|
|
Request was for undergorund hydro, underground hydro witnessed, no pressure loss observed.
Contact Tanner Loomis 3###-#### 30 Min Prior to RTC Insp start please.
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
BLD17-01829
| FIRE-Final Inspection | 4/4/2019 | 4/4/2019 | 4/4/2019 1:21:37 PM | P | FAIL |
|
|
fire extinguisher needs annual inspection performed. Service exit/emergency light on level 2 landing.
Jay Phone #: ###-####
|
FIR19-00085
| INSP-Sprinkler Rough-in | 4/3/2019 | 4/4/2019 | 4/4/2019 1:07:05 PM | P | PASS |
|
|
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover.
Contact ken Orahood ###-#### 30 Min prior to RTC Insp start please.
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
FIR18-00633
| INSP-Sprinkler Rough-in/Hydro | 4/3/2019 | 4/4/2019 | 4/4/2019 9:54:22 AM | A | CANC |
|
|
Inspection request cancelled per conversarion with point of contact, baffles to prevent cold soldering on sidewalls protecting exterior projections.
Kenny Caldwell is the contact. He requests this to be a partial rough/hydro for the 4th floor. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR18-00510
| INSP-Sprinkler Rough-in | 4/4/2019 | 4/4/2019 | 4/4/2019 8:50:19 AM | A | PART |
|
|
Overhead fire sprinkler piping inspection above hardlids/soffits in all rooms to include north side of fire door on level 2 complete, hardlids/soffits in rooms on level 3 complete, areas inspected approved for cover.
|
FIR18-00510
| INSP-Sprinkler Rough-in | 4/3/2019 | 4/4/2019 | 4/4/2019 8:45:56 AM | A | FAIL |
|
|
Numerous pockets throughout level 5 corridor and remaining rooms that do not meet the requirements of filling attic space with non-combustible insulation.
5th floor tenting ;2nd floor rough in. Phone #: ###-#### Inspection requested via web by Sam Ball
|
FIR19-00123
| INSP-Final Inspection | 4/3/2019 | 4/4/2019 | 4/4/2019 6:34:12 AM | A | PASS |
|
|
Final inspection for hood suppression system inspection.
6am after hours inspection
|